          T.No.215 - Urgent Patch works to Vazhuthacaud - Thycaud Road
          Upgradation 10-11. Widening and Improvements to Mudapuram – Muttapalam road from km. 0/000 to 1/800
          T.No.201 -Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs in Aryasala, road
          T.No.207 -Attukal Pongala Festival 2012-Urgent bit chipping carpet to the road Valiyasala - Myladikkadavu Bridge Jn.
          Budget Works 2009-10- Improvements to Vembayam-Pallippuram Road 0/00 to 6/400 km
          T-39/Dn.13th Finance Commission 2012-13. Urgent maintenance to Chala Bazar road (balance reacg)
          T.No.208 - Attukal Pongala Festival 2012-Urgent bit chipping carpet to the road from Soman Nagar - Kalady Ch.0/000 to 0/150
          T-69/Dn. 13th Finance commission 2012-13. Maintenance and urgent 40mm chipping carpet in Bhajanamadam road ch 0/00 to 1/200km.
          T-38/Dn. 13 th Finance commission 2012-13.Urgent maintenance to Melarannoor Karamana road km. 0/500 to 1/100(from Melarannoor to Railway cross)
          T-51/Dn.13 th Financecommission 2012-13.Providing 20mm chipping carpet to Miranda vadaicadu Kolloor road.
          T-47/Dn.13 th finance commission 2012-13.Providing 40mm chippping carpet to Pallimukku Kannamoola road ch 0/00 to 0/500.
          Premonsoon work 2012 - Urgent side drain rectification works to Udiyankulangara Kulathoorchavady road between Km 4/000 to 8/200.
          Premonsoon work 2012 - Side drain clearing at Uchakkada Pozhiyoor road between Km 1/000 to 2/200.
          Premonsoon work 2012 - Urgent rectification and drain clearance in Neyyattinkara Marayamuttam road between Km 0/000 to 1/200.
          T No194 A.P.F -2012 Clearing of side drain and providing covering slab at Manacaud - Konchiravila road
          T.No.195-Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs at the road Inside Fort
          T-563/Dn. S/R. Construction of outlet drain near km.2/800 of Balaramapuram - Vizhinjam road.
          T-567/Dn.Urgent rectification work to Mandapathinkadavu Vazhichal road km.2/800 to 4/340.
          T.No.196 -Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs in Manacaud - Chiramukku- Konchiravila road
          T-543/Dn. TVM Corporation works 2011-12. Resurfacing in Elamkulam oilmill road ch 0/00 to 1/00.
          Upgradation 10-11. Widening and Improvements to Kurakkada – Gandhismarakom road km 0/000 to 1/550.
          T-36/Dn.13 th Finance Commission 2012-13.Urgent maintenance to the road from Valiyathura Shanghumugham road cg 1/850 to 2/00 to avoid water stagnation in front of Coffee house at Sanghumughom.
          T-37/Dn. 13th Finance Commission 2012-12.Urgent maintenance to Poojappura Mudavanmugal road km 0/00 to 1/00.(from Poojappura to Unni Nagar).
          T-33/Dn.13 th Finance commission 2012-13.urgent maintenance to the road from Ambalathara to Poonthura ch 1/500 to 1/950.(School Jn to Poonthura Jn.)
          t-40/Dn. 13th Finance commission 2012-13.Urgent maintenance to Kalyan Hospital - Therakom road km 0/00 to 1/300.
          T-67/Dn 13 th Finance Commission 2012-13.Maintenance and urgent works to new Mla road ch 2/400 to 3/600km (under Roads section Varkala)
          T-121/Dn. 13th Finance commission 2012-13.Providing BM&BC to Mettukada to Guest house km 0/500 to 1/050.
          T-68/Dn. 13 th Finance commission 2012-13.Maintenance work to Kallambalam Manalil road ch 0/00 to 1/200km (Varkala section)
          T.No.219 - Construction of protection wall and parapet wall at Upper Merdian road
          Clearing Chocked up culvert, drainand removing elevated berm from Km 28/000 to 29/500 ofThiruvanathapuram Shencotta Road
          T-123/Dn. 13th Finance commission 2012-13.Providing BM&BC to womens college JN. to Kalabhavan and vazhuthacadu to tagore theatre km 1/500 to 1/700 and 2/100 to 2/400.
          T-125/Dn.13 th Finance commission 2012-13.Providing BM&BC to Althara Jn to Vellayambalam km 2/850 to 3/300.
          T.No.197-Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs in Kalady - Chiramukku road
          T.No.198 -Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs in Kalyan Hospital road
          T.No.200 -Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs in Karamana - Thaliyal -Kalady road
          T.No.202 -Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs in Manjalikulam road
          T.No.210 - Attukal Pongala Festival 2012-Urgent bit chipping carpet to Kannettumukku - Mettukkada road (Balance reach)
          T.No.211 - Attukal Pongala Festival 2012-Urgent bit chipping carpet to Karamana - Thaliyal - Kalady road
          T-120/Dn. 13th finance Commission 2012-13.Providing BM&BC to Thycaudu Flyover to Mttukkada Jn km0/00 to 0/500.
          T-122/Dn 13th Finance Commission 2012-13. Providing BM&BC to Govt Guest House to Womeens college km 1/050 to 1/500.
          T.No.214 - Urgent bit chipping carpet to the road from Melarannoor - NGO Quarters - Karamana road.
          T-49/Dn.13 th Finance commission 2012-13.Providing 40mm chipping carpet to PMG Plamoodu road ch 0/00 to 0/550.
          T.No.218 - Providing bit chipping carpet to Upper Merdian road ( Balance Reach)
          T-48 13 th Finance commission 2012-13.Providing 40mm chipping carpet toLaw college Thekkummoodu road ch 0/00 to 0/450.
          T.No.203 -Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs in S.S.Kovil road
          T-124/Dn. 13 th finance Commission 2012-13. Providing BM&BC to Tagore theatre to Althara JN. km 2/400 to 2/850.
          Premonsoon work 2012 - Side drain clearing at Uchakkada Pozhiyoor road between Km 0/000 to 1/000.
          T.No.199 - Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs in Karamana - Soman Nagar - Kalady road.
          T-50/Dn. 13th Finance Commission 2012-13.resurfacing by providing 20mm chipping carpet to Plamoodu Thekkumoodu Mulavana road.
          T.No.205 -Attukal Pongala Festival 2012-Urgent bit chipping carpet to Kalladimugham - Ambalathara road at Ch.0/000 to 0/150.
          T.No.206 -Attukal Pongala Festival 2012-Urgent bit chipping carpet to Kalladimugham - Ambalathara road at Ch.0/150 to 0/300
          T.No.209 - Attukal Pongala Festival 2012-Urgent bit chipping carpet to the road from Soman Nagar - Kalady Ch.0/150 to 0/300
          T.No.216 - Urgent Patch works to Thirumala - Mangattukadavu Road
          T.No.217 - Urgent Patch works to the road from Karamana - Poojappura.
          T.No.220 - Construction of foot path at Nagarukavu road (Balance portion) in Kuravankonam - YMR road
          T-574/Dn. SR 2011-12. Construction of side drain in Padinjattumukku Puthukurichy road km 1/400 to 1/900.
          T-53/Dn 13 th Finance commission 2012-13. Providing 40mm chippig carpet to Pettaha Anayara road km 1/500 to 2/500.
          T-52/Dn.13 th Finance Commission 2012-13.providing 40mm chipping carpet to Ulloor Akkulam road ch 0/800 to 1/200.
          T.No.213 - Attukal Pongala Festival 2013-Urgent Patch works to Manacaud - Chiramukku - Kalady road
          Urgent patch repairs to Thiruvanathapuram Shencotta Road from KM 21/000 to 23/800
          T.No.212 - Attukal Pongala Festival 2012-Urgent Patch works to Thycaud - Vellayambalam road ( Balance Reach)
          Providing Bit chipping Carpet to Aryanad-Palode Road from km 16/000 to 16/500
          T-547/Dn. One time maintenance of Corporation road, TVM Resurfacing the Puthenpally Jn. SM Lock road by providing BM and SC at ch 0/00 to 0/165.
          T-552/Dn. One time maintenance of Corporation roads in TVM. Resurfacing to Meppally garden lane ch 0/00 to 0/270, Thulayil lane ch 0/00 to 0/580 by providing 40mm chipping carpet.
          T-553/Dn TVM Corporation works 2011-12. Resurfacing to Vayyamoola road ch 0/00 to 1/200 and Thazasheri road ch 0/00 to 0/500.
          T-556/Dn. TVM Corporation works 2011-12.Resurfacing in Easalayam - Maraleanvilakom road km. 0/00 to 0/750.
          T-546/Dn. One time maintenance of Corporation road in TVM. Resurfacing of V- Man Nagar to Pazhachira and Bilal Nagar road by providing 40mm chipping carpet.
          T-548/Dn. TVM Corporation works 2011-12. Resurfacing of Noorul Islam Arabic College to Azad Nagar road ch 0/00 to 0/480 and MSS Jn to Milk colony road via HS ch 0/00 to 1/060 (1.54 Km.) by providing
          T-576/Dn Upgradation Providing 20mm chipping carpet to Vithura Bonacaud road km 15/00 to 19/600.
          Premonsoon work 2012 - Urgent clearing side drain and providing R.C.C covering slab in 11 th Mile M.S road bet km 0/000 to 2/000
          T-55/Dn.Providing 20mm chipping carpet with seal coat to Karichira Kayalkadavu road km 0/00 to 1/200.
          T-57/Dn.13 th Finance commission 2012-13.Providing 20mm chipping carpet with seal coat to Vengodu Jn and Vengodu Mangattumoola road km 0/00 to 0/400.
          T-58/Dn. 13 th finance commission 2012-13.Providing 20mm chipping carpet with seal coat to Arattuvazhy road from gate to Nalumukku.
          T-103/Dn.13 th Finance commission 2012-13.Construction of drain in Pappanamcode Kottoor road km.1/00 to 1/400.
          T-107/Dn.13 th Finance commission 2012-13.Construction of cement concrete drain in Arattukuzhy Amboori Neyyardam road near Amboori Jn. at km9/100.
          T-551/Dn. One time maintenance of Corporation road in TVM .Resurfacing of Kuthiravattom road km 0/00 to 0/275, Chettikulangara temple road 0/00 to 0/185, Pullani lane and Rishimangalam Temple road 0/0
          T-560/Dn. R/P. Providing 40mm chipping carpet to Udiyankulangara _ Kulathoor - Chavady road km.3/400 to 4/00.
          Premonsoon work 2012 - Urgent rectification and drain clearance in Neyyattinkara Marayamuttam road between Km 1/200 to 2/800.
          T-569/Dn.S/R.2011-12. Resurfacing the drain in Manacaud Valiyathura Road km.2/100 to 2/500.
          T-571/Dn. SR 2011-12. Construction of side drain and foot path near Nilabhavan school in PMG -TTC road ch 1/500 to 2/00.
          T-572/Dn. Construction of side drain and foot path in AKG Nagar at ch 0/00 to 0/450
          T-573/Dn SR 2011-12. Construction of side drain in Kaniyapuram Landing road bet km 0/900 to 1/200.
          Premonsoon work 2012 - Rectification of drain and construction of covering slab for Arayoor Ponvila road.
          Premonsoon work 2012 - Side drain clearing at Udiyankulangara Dhanuvachapuram road between Km 0/000 to 1/400.
          Premonsoon work 2012 - Side drain clearing at Idichakkaplamoodu Plamoottukkada road Km 0/700 to 3/400.
          Urgent rectification works to Parassala - Panachamoodu road between Km 13/750 to 14/500.
          T-544/Dn. TVM Corporation Works 2011-12. Resurfacing to Bhagathsingh Nagar to Majinadu - Puliyambinkonam road ch 0/00 to 1/300.
          T-545/Dn. One time maintenance of Corporation road in TVM.Resurfacing of Poonthura school Jn. to Cheriyamuttom market road km 0/00 to 0/900 and Madhuvam road ch 0/00 to 0/360 by providing 40mm chippin
          T-549/Dn One time maintenance of corporation road in TVM district. Resurfacing to the Thaikapally road in ch 0/00 to 0/200km, St. Xaviers Beemapally road in ch 0/00 to 1/00km, Bheemapally Mosque road
          T-554/Dn. One time maintenance of Corporation road in TVM. Resurfacing of Lenna road - Thoppu ch 0/00 to 0/250, St. Marys Library - Kuzhivilakom road ch 0/00 to 0/250 by providing 40mm chipping carp
          T-555/Dn. One time maintenance of corporation road in TVM. Resurfacing to the road from N.S Depot to Putheb=npalam ch 0/00 to 0/480, Market road , Bye road and road from Market Jn to Puthen road ch 0
          T-564/Dn.S/R.Construction of CC drain near Thekkthunada Jn. ,Millnada Jn and Puthuval Jn. In Neyyattinkara Marayamuttom road at ch 0/00 to 1/600.
          T-568/Dn. S/R 2011-12.Construction of drain and foot path from St. Xaviers church road at ch 0/500 to 1/100.
          T-557/Dn.TVM Corporation works 2011-12. Resurfacing in Pettah Railway Palam road ch 0/00 to 0/600, Mutharamman kovil road km 0/00 to 1/00 by providing 40mm chipping carpet
          T-558/Dn TVM Corporation Works 2011-12. Resurfacing in Chithra Nagar road ch 0/00 to 0/300, Santhosh Nagar road ch 0/00 to 1/00.
          T-561/Dn. R/P 2011-12. Providing 20mm chipping carpet with seal coat to Veli Kadinamkulam road from km 2/800 to 3/640.
          T-570/Dn. Construction of side drain and foot path to thee road from Hantex to Fire Rorce Office ch 0/00 to 0/200.
          T-577/Dn Central line and Zebra line marking in Peyad Vilappilsala Mulayara road and allied works.
          T-550/Dn. One time maintenance of Corporation road in TVM. Resurfacing to the Vallakadavu Puthenpalam road ch 0/00 to 0/400, Sreevarahanagar road 0/00 to 0/355, Thavalode lane - Parambil Nagar road -
          T-575/Dn. RP 2011-12Providing 40mm macadam to Padinjattumukku Station kadavu road km. 4/800 to 5/600.
          Premonsoon work 2012 - urgent clearing of blocked up drain in Vandanoor Russelpuram road bet km 0/000 to 2/000
          T-559/Dn. providing 40mm chippping carpet to Udiyankulangara Kulathoor Chavady road km.1/450 to 2/000.
          Premonsoon work 2012 - Urgent clearing blocked up drain and providing R.C.C covering slab between Neyyattinkara and Olathanni in Neyyattinkara Poovar road bet km 0/000 to 3/300
          Premonsoon work 2012 - Clearing chocked up side drain in Balaramapuram Poovar road from Km 5/500 to 12/400.
          Premonsoon work 2012 - clearing chocked up drain in Uchakada Pozhiyoor road km 0/000 to 2/200
          T-105/Dn.13 th Finance commission 2012-13.Construction of drain in Neyyattinkara Kattakkada road and Balaramapuram Kattakkada road.
          T-109/Dn.13 th Finance commission 2012-13.Construction of cement concrete drain in Chulliyoor Chadachimarthandam road ch 0/100 to 0/400.
          Applying thermoplastic road marking paint in various roads under Roads Section, Parassala.
          T.No.204 -Attukal Pongala Festival 2012-Clearing of side drain and providing covering slabs in Chalai Bazar road
          Providing 40mm thick chipping carpet in Balaramapuram – Poovar road between Km 5/200 to 5/400.
          T-59/Dn.13 th Finance commission 2012-13.Providing 20mm chipping carpet with seal coat to Padinjattumukku Puthukurichy road km 5/600 to 6/100.
          T-565/Dn. Prevention of water stagnation by providing CC drain and RCC covering slabs in 11 th mile M>S road bet km 2/500 to 3/00.
          Urgent rectification works to Koothali Pannimala road between Km 1/800 to 3/000.
          Urgent rectification works to Parassala - Panachamoodu road between Km 12/500 to 13/400.
          Extension of right side approach road of Attukal bridge-Peg marking for land acquisition.
          Premonsoon work 2012 - Rectification side drain and urgent cleaning blocked up drain and providing covering slabs bet. Olathanni and Pazhayakada in Neyyattinkara Poovar road bet km 3/650 to 5/250
          Premonsoon work 2012 - Urgent clearing silted up drain in Amaravila Ottadekharamangalam road bet km 0/000 to 3/500
          Premonsoon work 2012 - Clearing chockedup side drain in Balaramapuram -Poovar road bet km 2/800 to 5/500
          Urgent rectification works to Parassala - Panachamoodu road between Km 0/000 to 2/400.
          Urgent rectification works to Balaramapuram - Kattakada road between Km 0/000 to 2/200.
          Reconstruction of Venkode bridge in Malayinkavu-Mullalivila road across Kodinjamoola thodu in Vellarada Gramapanchayath in Parassala constituency -Soil Investigation and Survey works
          construction of bridge at 10th mile stone across Killi river
          T-104/Dn.Construction of Cement concrete drain in Avanakuzhy Ambalam road km 1/500 to 2/00.
          110/Dn.13 th finance commission 2012-13.Consruction of Cement concrete drain in Perumkadavila Kunnathukal road near Alathoor(Ch: 0/900 to 1/100,1/900 to 2/200 and 2/200 to 2/400)
          T-111/Dn. 13th finance commission 2012-13.Providing protective walls to Arattukuzhi Amboori Neyyardam road near Moongode km 4/600 to 5/100.
          Urgent patch repairs to 20mm bit chipping carpet to Mulavanah- Gowreesapattom – Pottakuzhi road
          NEW MLA ROAD,VARKALA
          T-56/Dn.13 th Finance commission 2012-13.Providing 20mm chipping carpet with seal coat to Vadayilmukku Kandal Karichara road km.0/00 to 1/500.
          T-60/Dn.13 th Finance commission 2012-13.Providing 40mm chipping carpet to Ariyoottukonam Kattaikonam Melevila Mahadevapuram road km. 1/00 to 1/800.
          T-100/Dn.13 th Finance commission 2012-13.Maintenance and repairs to Muthuvila Parappil road from km 0/00 to 1/100.
          T-106/Dn. 13 th Finance commission 2012-13.Providing 20mm chipping carpet and drain work in Vellarada Neyyardam road between ch 0/00 to 1/200.
          T-108/Dn.13 th Finance commission 2012-13.Consruction of culvert and Cement concrete drain in Mandapathinkadavu Mukundara road near poozhanadu Jn and Mylakkara Jn.
          mla road 2 varkala
          Urgent rectification work and bit chipping carpet to the surface of TRIVANDRUM-NEYYARDAM ROAD bet. Km 09-000 to13-500
          Urgent patch repairs to Kumarapuram- Medical college road ch 2/000 to 2/500 km
          T-252/Dn. ordinary repairs 2012-13. urgent rectification works to Vattavila Pirayimoodu road km 2/00 to 2/800.
          T- 254/Dn. R.P. 2012-13. resurfacing the road from Kunnapuzha to Park Jn ch 0/00 to 0/950.
          T-272/Dn. S.R 2012-13. Construction of side drain in Thekkada Panavoor road km 6/00 to 7/200.
          Urgent rectification works to Panayarakunnu - Thannimoodu road between Km 0/000 to 2/150.
          Construction of culvert and side drain of approach road of Nellikuzhy bridge
          Urgent rectification works to Chemboor road between Km 3/500 to 5/000.
          Urgent rectification works to Chemboor road between Km 7/000 to 8/950.
          Urgent rectification works to Parassala - Panachamoodu road between Km 5/400 to 7/000.
          Urgent rectification work and bit chipping carpet to the surface of TRIVANDRUM-NEYYARDAM ROAD bet. Km 14/000 to17/800
          T-241/Dn. Deposit work 2012-13. ARWSS to Ottasekharamangalam phase 2 Laying distribution system in Vellarada panchayaath. Restoration of roadway after laying transmission main line at stretche in kott
          T-261/Dn. R.P 2012-13. Providing 20mm chipping carpet to muthuvila Parappil road km1/100 to 2/200
          T-265/Dn. S.R 2012-13. Construction of retaining wall in Sivagiri Thoduway road 9Sivagiri Sivagiri HS road in front of Sivagiri Muttt)
          Applying thermoplastic road marking paint in various roads under Roads Section, Neyattinkara
          Urgent rectification works to Chemboor road between Km 0/000 to 1/200.
          Urgent rectification works to Chemboor road between Km 9/000 to 10/400.
          T-250/Dn. Ordinary repairs 2012-13. Urgent patch repairs to Vembannoor Kadambanad Cheriyakonny road km 0/00 to 2/750.
          T-266/Dn. S.R 2012-13. Construction of side drain in velliyazhichakvu Ambilichantha road km 0/00 to 0/800.
          Urgent rectification works to Balaramapuram - Kattakada road between Km 7/500 to 9/500.
          T-242/Dn. Deposit work 2012-13. ARWSS to Ottasekharamangalam phase 2 Laying distribution system in Vellarada panchayath. Restoration of roadway after laying water transmission main line at stretch in
          T-247/Dn. LAC. ADF. 2012-13. improvements to Cherunniyoor Akathumuri road ch 0/00 to 2/00.
          T-251/Dn. Ordinary repairs 2012-13. urgent rectification works to Vattavila Pirayimoodu road km 0/00 to 1/00.
          T-273/Dn. S.R 2012-13. Construction CC drain to Arumanoor Pulluvila rod ch 1/150 to 1/700.
          Tender No.134 - Urgent Patch repairs to Vattiyoorkavu - Kachani road at Ch.2/500 to 5/500
          Tender No.130 Urgent Patch works to Vattiyoorkavu - Vallaikadavu road Ch.0/900 to 2/500
          Tender No.132 Urgent Patch Repairs to Nettayam - Malamughal Road Ch.1/000 to 2/500
          Revenue dept. Land Bank: Productions and Supply of Jundas to Dist. Collector's Office Tvpm
          Tender No131 Urgent Rectification of un authorised water cuts for rectifying water leakage from Vattiyoorkavu- Arappura- Valiyavila Road Ch0/000 to2/500 and Elippodu - Arappura Road Ch0/000 to 2/200
          Tender No.133 Urgent Patch Repairs to Peroorkada - Mannamoola - Mannarakonam Road Ch.1/800 to 2/400
          Reconstruction of Murinjapalam Bridge in 16th mile Vengodu road.
          Urgent bit chipping carpet work in Udiyankulangara Kulathoor Chavady road Km 0/000 to 4/000
          Urgent bit chipping carpet work to avoiding water stagnation at Km 10/200 in Chempoor road and provi
          Urgent bit chipping carpet work to Neyyattinkara Poovar road Km 0/000 to 1/000.
          Urgent bit chipping carpet work to Idichakkaplamoodu Plamoottukkada road
          Urgent bit chipping carpet to Arattukuzhi Amboori Neyyardam road bet Ch: 0/000 to 1/500
          Urgent rectification works to Katcheri road bet ch: 0/000 to 0/600
          Urgent bit chipping carpet work to Arattukuzhi Amboori Neyyardam road bet ch: 6/000 to 7/500
          Urgent patch repairs to Uchakkada Pulinkudi road bet Ch: 0/000 to 2/160
          Urgent bit chipping carpet works to Arattukuzhi Junction in N.S road Km 35/100 to 36/500.
          Urgent rectification works in Pongumoodu Aruvikkara road Km 0/000 to 2/000.
          Urgent bit chipping carpet work to Ayithiyoor Balaramapuram road Km 0/000 to 3/000.
          Urgent bit chipping carpet work to Parassala Panachamoodu road bet Km 14/700 to 14/800.
          Urgent bit chipping carpet work to Koothali Pannimala road bet Ch: 1/800 to 3/000.
          Construction of retaining wall and urgent rectification at Amaravila Karakonam road Km 0/400 to 1/00
          Construction of side train for releasing water stagnation in Nemom Punnamoodu road in bet ch: 2/000
          Urgent bit chipping carpet work to Kathippara to Kadukkara in N.S road Km 36/500 to 37/500.
          Urgent bit chipping carpet works to N.S road Km 33/500 to 35/100.
          Urgent bit chipping carpet to N.S road Km 31/500 to 33/500.
          Providing 20mm Chipping Carpet to Attara lane road Ch: 0/00 to 0/500.
          Rectification and reconstruction of the old drain and culvert in NCC road.
          Construction of side drain in Arattukuzhi Amboori Neyyrdam road bet Ch: 9/000 to 9/200.
          Reconstruction of damaged retaining wall in N.S road at Km 34/300.
          Construction of retaining wall in Amaravila Ottasekharamangalam road Km 0/000 to 0/500 and 1/800 to
          Construction of side drain in Arattukuzhi Amboori Neyyardam road bet ch: 1/400 to 1/500.
          Maintenance of side drain at Panchamoodu Jn: in Parassala Panachamoodu road Km 10/600 to 12/200.
          Urgent bit chipping carpet work in Balaramapuram Poovar road at Ch: 0/000 to 2/800.
          Removal of slippedup earth and drain clearing in N.S road Km 29/300 to 31/000.
          Urgent bit chipping carpet work toMuthiyavila Ottasekharamangalam road Km 5/200 to 7/326.
          Urgent bit chipping carpet work to Kanjiramkulam Police station road bet Km 0/000 to 2/300.
          Urgent bit chipping carpet to Nemom Punnamoodu road Km 0/000 to 3/000.
          Providing bit CC to kalady Maruthoorkadavu road
          Providing bit chipping carpet to Manacaud Valiathura road portiion from Manacaud to G..K. junction.
          Urgent bit chipping carpet to Manacaud Perunelly road and Manacaud Konchiravila road.
          Providing bit chipping carpet to Enchakal Ponnara bridge road and Vallakadavu Arattugate road.
          Providing bit chipping carpet to Puthen road junction - Uppidammoodu road.
          Providing bit chipping carpet works to Model school - Ammencovil-DPI road.
          Providing bit chipping carpet to Paris road(via Bakery junction and forest lane)
          Providing bit chipping carpet to Manjalikulam road.
          Reectification to Pulimoodu-Kaithamukku-Ambujavilasom road and Ayurvedacollege- Kunnumpuram road.
          Providing 20mm thick chipping carpet to Nalumukku-Medical college
          Providing 20 mmbit chipping carpet to Peyad-Vellanadu road
          Providing bit chipping carpet to statue-Old collectrate and Overbridge - Uppidammodu road.
          Providing bit chipping carpet to St. Xaviers junction Valiathura (via) Thaivilakom road.
          Providing bit chipping carpet to Kunnappuzha - Thrikkannapuram road.
          Urgent rectification works to Pazhavangadi - West fort (canal road) and inside fort.
          Providing bit chipping carpet to Kunjalummoodu - Thamalom and Kesavadev road.
          Providing bit chipping carpet to CIt road
          Providing 20mm thich chipping carpet to Kunnukuzhi-Kolloor bridge
          Providing 20mm bit chipping carpet to Thiruvananthapuram-Neyyar dam road ch 14/200 to 17/700
          Providing bit chipping carpet to Pangode - Pallimukku road.
          Providing 20mm bit chipping carpet to Opthalmic-Mulavana
          Providing bit chipping carpet to Killipalam - Iranimuttom bund road.
          Providing bit chipping carpet to Karamana- Poojappura- chilappatheruvu road.
          Providing bit chipping carpet to Jagathy bridge to Poojappura road.
          Providing bit chipping carpet to Jagathy - Poojappura - Mudavanmughal road.
          Providing bit chipping carpet to Mannanthala- Mukkola road .
          Providing bit chipping carpet to Vayalikkada-chittalloor temple road.
          T-240/Dn.2012-13.D/W.Rectification of tar cut due to laying 11kg non MS pipe from Iranimuttom tank site to Chiramukku.
          Providing bit chipping carpet to YMR - Kuravankonam road
          Providing bit chipping carpet to PMG _ TTC road.
          Providing bit chipping carpet to AKG Nagar road.
          Providing bit chipping carpet to Kudappanakkunnu - Mukkola - Mannanthala road in Peroorkada - Manna
          Providing bit chipping carpet to the road from Maruthankuzhy to Vattiyoorkavu.
          Providing bit chipping carpet to Peroorkkada - Manikanteswaram road.
          Providing bit chipping carpet to Nettayam - Malamukal road (Balance wwork)
          Providing bit chipping carpet to Pipe line road.
          Tender No.107 -Attukal Pongala 2013 - Urgent Patch works Clearing side drain and Construction of covering slab from Chiramukku to Ambalathara
          Providing bit chipping carpet to inside Jawahar Nagar road.
          Tender No.116 Attukal Pongala 2013 - Urgent Patch works from Chalai Bazar,Aryasala to Chithra Theatre road
          Tender No.108 - Attukal Pongala 2013 - Urgent Patch works from Chiramukku to Kalady
          Tender No.110 Attukal Pongala 2013 - Urgent Patch works from Karamana - Thaliyal to Kalady
          Tender No.119 Attukal Pongala 2013 - Urgent Patch works from Karamana to Poojappura
          Tender No.120 Attukal Pongala 2013 - Urgent Patch works from Housing Board to Sreekumar Theatre(S.S.Kovil road)
          Tender No.113 - Attukal Pongala Festival 2013 - Clearing side drain construction of covering slab and Foot Path from Chiramukku to Iranimuttom
          Tender No.115 Attukal Pongala 2013 - Clearing side drain and Construction of covering slab from Nedumgad to Soman Nagar
          Providing 20 mm bit chipping carpet to Sreekariyam-Akkulam road
          Providing 20mm thick chipping carpet to Thampuranmukku-RC jn
          Providing 20 mm bit chipping carpet to Killi-Thoongapara road km 0/00 to 1/200
          Providing 20mm thick bit chipping carpet to Ambalam-Vengode road 0/00 to 3/900
          Providing 20 mm thick bit chipping carpet to 16th mile TQ road to Vengode.
          Providng 20mm bit chipping carpet to Killi-Manali-Mechira road km 3/00 to 4/800
          Providing 20mm bit chipping carpet to Vilappinsala-Malappanamcode-Kattakkada km 0/00 to 2/200
          Providing 20mm bit chipping carpet to Valiyarathala-Mukkamplamoodu km 0/00 to 1/200
          Providing 20mm thick chipping carpet to Anthiyoorkonam-Thachottukavu road km 1/00 to 2/500
          Providing 20mm bit chipping carpet to Anthiyoorkonam-Thachottukavu road km 2/500 to 4/500
          Tender No.128 Attukal Pongala 2013 - Urgent rectification works to Karamana - Poojappura road drain up to Kunjalumoodu
          Tender No.117 Attukal Pongala 2013 - Urgent Patch works from Mettukada - Kannettumukku to Valiyasala
          Tender No.111 Attukal Pongala 2013-Urgent Patch works from Karamana-Soman Nagar to Kalady
          Tender No.129 Attukal Pongala 2013 - Urgent Patch works to the road Chilappatheruvu and repairs to side drain(Kunjalumoodu to Chilappatheruvu.)
          Tender No.118 Attukal Pongala 2013 - Urgent Patch works from Puthencotta to Amman Kovil Junction
          Tender No.114 Attukal Pongala 2013 - Clearing side drain and construction of covering slab from East Fort to Chalai road.
          Kalathukal-Uriyacode Road from 0/000 to 2/000
          Tender No.112 Attukal Pongala 2013 - Urgent Patch works from Killipalam - Attukal Bund road to Iranimuttom and side clearing
          Construction of concrete side drain at Kokothamangalam in Vellanadu road.
          Construction of side drain in Mampazhakkara road at ch: 0/00 to 4/200.
          Nedumangad Aruvikkara Road km 2/000 to4/000
          Karakulam-Mullassery Junction-Vengod road from KM 0/000 to 1/800
          Kudavanad Paluvalli Chellangi Road km 0/200 to 1/500
          Kattakkada-Kottoor road KM 12/600 to 14/600
          Aruvikkara to Dam site km 0/000 to 1/4000
          Kattakkada-Kottoor road from Km 8/000 to 12/600
          Vellanad Road Km 8/500 to 11/800
          Providing 20 bit chipping carpet to Kundumonkadavu bridge deck and approaches.
          Vithura-Bonaccord Road from KM 9/000 to 12/000
          T-590/Dn. Urgent rectification works to N S road bet km. 20/00 to 26/500 and 27/00 to 27/500.
          T-605/Dn. Renewal Programme 2011-12. Resurfacing to Contolment House road.
          Irumba Aruvikkara Road km 0/000 to 2/000
          Kudavanad Paluvalli Chellangi Road km 1/500 to 3/00
          Kalathukal-Uriyacode Road from KM 2/000 to 4/000
          Vattakulam Road km 0/000 to 0/670
          Puthenpalam-Venjaramodu Road 0/00 to 2/00
          Puthenpalam-Venjaramodu Road
          Vamanapuram Kalamachal road from KM 0/00to2/00
          Puthenpalam-Venjaramodu Road from KM 2/00to 4/00
          Vengavila -Moozhi road from KM 0/000 to 2/500 (retender)
          Nedumangad Karipoor Road km 0/000 to2/800
          Tender No.109 Attukal Pongala 2013 - Urgent Patch works from Kulathara to Kalady South
          Tender No.122 Attukal Pongala 2013 - Clearing chocked up side drain in Padmavilasom Road and adjacent Roads in inside Fort Road Ch.0/100 to 2/937
          Tender No.126 Attukal Pongala 2013 - Providing 20mm Bit Chipping Carpet in Perunelly-Kallummoodu in Karalkada - Subash Nagar road from Ch.1/850 to 1/975Km.
          Tender No.127 Attukal Pongal;a 2013 - Urgent Bitumen Patch repairs to Manacaud-Perunelly road(Belvan Nagar)Ch.0/000 to 1/700Km.
          Flood damages 2010-11 urgent Bit chipping carpet work from km 2/550 to 4/600 of Kilimanoor - Kadakkal (via) Adayamon
          Vamanapuram Kalamachal road
          Providing 20mm Bit- Chipping carpet toNedumangad Karipoor Road km 0/000 to 2/800
          Construction of bridge across karamana river at Pallathukadavu near Karumam - DPR Preparation
          Flood Damages 10-11 Urgent rectification to the seriosly erroded shoulders of Parippally-Madathara road Km: 10/00 to 11/270
          Tender No.123 Attukal Pongala 2013 - Urgent Patch repairs to Punnapuram road and repairs to side drain to Ch.0/150 to 1/200
          Flood damages10-11 Urgent rectification to the seriously erroded shoulders of Parippally-Madathara road Km: 8/400 to 10/00
          Construction of Aryanadu Anniyilakadavu bridge across karamana river- DPR preperation.
          .Flood Damages10-11 Urgent bit chipping carpet to Parippally-Madathara Road from Km: 9/00 to 11/270
          ,Flood Damages 10-11 Urgent bit chipping carpet to Old paripally road Km:0/00 to 2/00
          T-594/Dn Construction of Cement concrete drain in Chulliyoor Chadachimarthandam road ch 0/650 to 0/750.
          NABARD-RADF XVI- Construction of a bridge at Moonnattumukku across Neyyar River connecting Katakkada Panchayat and Aryancode Panchayat in Thiruvananthapuram District- Confirmatory soil investigation
          Re-construction of bridges(2 Nos) at Attipra across Thettiyar thodu & Tributory in Kazhakuttom Constituency -Thiruvananthapuram district- For Driving Pegs.
          T-592/Dn. Providing 40mm chipping carpet to Arattukuzhi Jn in Arattukuzhi- Amboori Neyyardam road.
          T-578/Dn. Construction of culvert and covering slab in Balaramapuram Kattakada road at Pongumoodu Jn.
          T-593/Dn. Providing bit chipping carpet to Karumam Thiruvallam road ch 3/500 to 4/500.
          T-580/Dn. R/P Providing 20mm chipping carpet to Attinpuram Perayam road from km. 4/00 to 5/00
          Reconstruction of bridge (2 Nos) at Attipra across Thettiyar Thodu and Triburory in Kazhakkuttam constituency in Trivandrum District- DPR preparation.
          Tender No.125 Attukal Pongala 2013 - Urgent Bitumen Patch repairs to Statue-Chirakkulam-Uppidamoodu road road Ch.0/00 to 0/600Km
          Flood Damages10-11 Urgent bit chipping carpet to Nagaroor Kallambalam Road Km:o/oo to 4/00
          Flood Damages10-11 Urgent bit chipping carpet toPerunthamon - Kallara Road from Km:5/500 to 7/00
          Flood Damages10-11 Urgent bit chipping carpet toThumbode-Kaithode road Km:0/00 to 2/700
          T-591/Dn. Urgent rectificatiion work to N.S road bet km. 33/00 to 35/00.
          Tender No.121 Attukal Pongala 2013 - Urgent bitumen Patch repairs to Rajadhani Road and connected roads in inside Fort Road Ch.1/350 to 2/000.
          NABARD RIDF XVIII - Construction of Ookode - Vevila Nagar - Nagarukavu- Keezhpadu - Sasthancoil road km 0/000 to 2/650
          MLA fund Construction of Waiting shed infront of Kerala university office, Palayam
          T-584/Dn. RP 2011-12. Providing 20mm chipping carpet to the existing BT surface of Chemmarathum mukku - Puthuserymukku road km 4/600 to 5/600.
          T-588/Dn.Resurfacing the road Chamavila Kudayal road
          T-581/Dn. SR2011-12. Special repairs to Pozhiyoor bridge across A.V.M Canal in Neyyattinkara taluk.
          F/D 2010-11 Reconstruction of damaged culvert and con. of CC drain in Nettayam Malamughal road Ch:0/
          T-585/Dn.RP 2011-12. Providing 20mm chipping carpet to the Chemmarathumukku - Puthusserymukku road km 5/600 to 6/600.
          T-611/Dn. Upgradation of the carriageway by providing 20mm chipping carpet to Sreekariyam (via) Kulathur Kazhakoottam road from km. 6/500 to 7/00.
          T-587/Dn.Urgent rectificatiion works to Parassala Panachamoodu road ch 12/400 to 14/855 and Chemboor road ch 9/00 to 10/400.
          T-586/Dn. Construction of culvert, CCdrain and covering slab to Neyyattinkara Poovar road near Neyyattinkara shopping complex and Amman covil.
          T-579/Dn. Improvements to Pappanamcode - Kottoor road at Industrial Estate Koliyakode km 1/00 to 1/300.
          Providing bit chipping carpet to Chayam Peringamala road from KM 4/000 to 5/000
          Extension of culverts between Km 0/600 and 1/000 of Vellanadu-Aryanadu road
          :-D/W. Urgent rectification work with Chipping Carpet, due to trenching sewerage line in Medical college-Kumarapuram road in front of Police station and Mens hostel.(Work should be complete before 201
          Palode- Braimore Road km 0/000to 2/000
          Providing bit chipping carpet to palode Brimoore road from KM2/00to4/00
          Attukal Pongala 2013 - Clearing chocked up side drain in Manacaud-Konchiravila road
          T-240/Dn. Deposit work 2012-13 - Rectification of Tar cut due to laying 11Kg non MS pipe from Iranimuttom tank site to Chiramukku under City Roads Section II
          13th Finance Commission M&R, MDR Providing 40mm C.C. to Kurissadi - Ambalathinmoola - Karimkulam road ch. 1/800 to 2/800 km.
          t-596/Dn. Deposit work 2011-12. Providing 20mm thick chipping carpet to Pothujanam road ch 0/00 to 1/200.
          Providing bit chipping carpet to vattappankadu Alumkuzhi Elavattom road from KM 1/500 to 3/00
          Providing bit chipping carpet to vattappankadu Alumkuzhi Elavattom road from KM 0/00 to 1/500
          Urgent rectification works to collapsed portion of culvert at Km 8/900 of Alamcode- Meerankadavu road
          Extension of culvert at Ch 2/700 (Manchadimoodu) of Chirayinkil- Kaniyapuram road
          T-582/Dn. Soil investigation & site survey work for the construction of bridge across Neyyar river in Thirupuram & Chenkal panchayath in Neyyattinkara constituency.
          T-606/Dn. Urgent rectification to the Pallimukku Valiiyavila road.
          Prividing Bit Chipping to Vithura Branch road 1/050 to 1/300
          Providing 20mm bit chipping carpet toCharumoodu Ayyappankuzhy (via) Marrikuzhy road from KM0/000 to 3/000
          Providing 20mm bit chipping carpet toThottumukku Memala Kalamkavu road from KM 2/500 to 4/650
          Urgent patch repairs to Vellanad Road Km 4/000 to 4/600 and km 5/600 to 6/500
          Urgent patch repairs to Kilimanoor- Madavoor road from Km 6/000 to 8/000
          T-233/Dn. 13 th Finance commission 2012-13. Side protection works and road safety measures in Varkala Vettoor Nedumkanda road.
          T-234/Dn. 13 th Finance commission 2012-13.Road safety measures in various roads in Varkala section.
          T-235/Dn 13 th Finance commission 2012-13. Side protection works -Construction of retaining wall and drain in Vilabhagom road.
          Urgent repairs to the existing side drain and providing covering slabs in Bet: KM 0/000 to 0/200 of Vithura Branch road
          Construction of Irish drain between Ch 1/000 to 1/500 of Varkala - Kallambalam road
          Construction of Irish drain between Ch 1/500 to 2/000 of Varkala - Kallambalam road
          Urgent patch repairs to Kilimanoor- Madavoor road from Km 8/000 to 10/000
          T-604/Dn Resurfacing the road from Tagore road ch 0/00 to 1/00.
          T S S Deposit work laying 250 m m dia. sewer line in place of damaged 225 mm dia sewer line in front of Anadiyil Hospital at Thekkummoodu Junction
          Urgent Patch Repair work to Ulloor Temple Road CH. 0/000 to 0/550
          B/W 09-10 Impts to Venpalavattom Anayara road - releasing water stagnation from Kallumoodu to Anayara in Petta Oruvathilkotta
          Urgent patch repairs to Nedumangad Shorlacode road fro Km 0/000 to 0/700
          Removing slipped up earth and clearing side Bet; KM 59/800 and 60/800 of Thiruvananthapuram Ponmudi road
          Urgent patch repairs to Thumbode- Kaithode road from Km 2/700 to 5/100
          Urgent repairs to parapet and hand rails to the bridges at Puravoor and Erattakalungu in Attingal- Chirayinkil road
          Clearing and repairs to drain between Kilimanoor and Puthiyakavu Jn
          Urgent patch repairs to Navaikulam -Thumbode road from Km 0/000 to 3/000
          Clearing and repairs to storm water drains in Nagaroor Jn
          T-236/Dn. Ordinary repairs 2012-13. providing 40mm chipping carpet in balaramapuram Poovar road km 5/450 to 5/700.
          T-237/Dn. Deposit work 2012-13. Urgent restoration of roadway after laying water transmission main line SAARK project (Kalippara project) at stretch in Idichakkaplamoodu (Ponvila school) Plamoottukadz
          T-238/Dn. Deposit work 2012-13. Urgent restoration of roadway after laying water transmission main line SAARK Project (Kalippara project ) at stretch in Idichakkaplamoodu (Ponvila school) Plamoottukad
          Providing 20mm bit chipping carpet to Thottumukku Memala Kalamkavu road from KM 0/00to2/500
          F/D 2010-11 Construction of side drain in between Km. 1/00 to 3/00 of Vamanapuram Kalamachal road.
          T-231/Dn. MLA's Asset Development fund 2012-13. improvements to Kunddamankadv u Puthuveerumelai (Sankaran Nair ) road.
          T-239/Dn. MLA's SDF 2012-13. Construction of new road by providing 40mm thick chipping carpet and construction of culvert in kodunganoor Alumkuzhivila road ch 0/00 to 0/145 in Kodunganoor ward.
          T-232/Dn.Disaster management Flood relief 2012-13. Resurfacing of Thiruvananthapuram Chalakuzhy to Pillaveedu Aiswarya nagar Vivekandanagar road .
          Providing 20mm bit chipping carpet to V.Kesavan Nair road from KM 0/000 to 2/000
          Providing 20mm bit chipping carpet to Muthuvila Aruvippuram Chullalam road 2/500 to 5/000
          Providing 20mm bit chipping carpet to Muthuvila Aruvippuram Chullalam road 0/00 to 2/500
          Sivagiri Festival 10-11 Urgent maintanance to Sivagiri-Sivagiri H.S road
          .Sivagiri Festival 10-11 Urgent patch repairs to Panayilkadavu Bridge approach road
          ,Sivagiri Festival 10-11 Urgent jungle clearance to Varkala-Edava-Kappil Road
          Sivagiri Festival 10-11 Urgent patch repairs to Deviation road to Onnampalam and approach road
          Improvements toKurissadi - Kavalayoor H.S road ch.0/00 to 1/500 by providing 40mm C.C.
          Improvements to the road from Attakulangara - Killipalam - (Chalai Bye pass) by providing BM and BC (ch.0/000 to 1/100 km)
          Sivagiri Festival 10-11 Urgent patch works and jungle clearance to Varkala-Mythanam to Nadayara km 0/00 to 4/300 of Varkala-Parippally Road
          Improvements to Narikkal-Vattaplamoodu road from 0/00 to 1/200 (BM&BC)
          T No.223 Tvpm City Flood -2011 Clearing and repairing side drain of Ambalathara - Poonthura road at Ch.0/300 to 0/900
          T No.224 Tvpm City Flood -2011 Clearing and repairing side drain in Padmavilasom and Adjoining roads at Ch.0/000 to 1/000
          T No.226 Tvpm City Flood -2011 Clearing and repairing side drain of Ambalathara - Poonthura road at Ch.1/350 to 1/550
          T No.228 Tvpm City Flood -2011 Clearing and repairing side drain in Beemapally - Valiyathura road at Ch.0/000 to 1/290
          T No.233 Tvpm City Flood -2011 Clearing and repairing side drain Killippalam - Attakkulangara(Chalai By passLeft side at Ch.0/000 to 1/500
          T No.232 Tvpm City Flood -2011 Reconstruction of dammaged side drain, providing covering slab and Clearing side drain in Karalkada - Subhash Nagar and Enchakkal - Poonthura road fr Ch.2/000 to 2/500
          Sivagiri Festival 10-11 Urgent patch works and jungle clearance to Narikkal road from km 0/00 to 0/200
          T No.235 Tvpm City Flood -2011 Clearing and repairing side drain of New theatre road (service road)at Ch.0/000 to 1/525
          T No.240 Tvpm City Flood -2011 Clearing and repairing side drain of Thycaud House to Keezhe Thampanoor road at Ch.0/000 to 1/000
          T No.243 Tvpm City Flood -2011 Clearing and repairing side drain of Melarannoor to CIT road at Ch.0/000 to 1/240
          Sivagiri Festival 10-11 Urgent painting guard stone.humb,parapet,electric post,telephone post etc to various roads, Varkala- Parippally, Varkala- Edava- Kappil road and Vilabhagam road etc
          Improvements to Oonnimoodu - Kalleckal - Mylavila road ch. 0/00 to 1/00 40mm premix bit maccadom
          Urgent restoration works on sinking portion of the Kadakkavoor Thode bridge approach road
          Flood Damages 10-11 Urgent bit chipping carpet to the Kilimanoor-Kadakkal(via) Adayamon road from km.0/00 to 2/500
          Construction of Protective Retaining wall in between km.3/00to4/00.in Vattappara Pothencodu Road.
          F/D 2010-11 Construction of side drain in between Km. 17/00 to 179/00 of Puthenpalam Venjarammoodu road
          D/W Rectification work from Kakkamoola pump house to Poonkulam due to road cutting.
          T No.230 Tvpm City Flood -2011 Reconstruction of dammaged side drain, providing covering slab in Ayurveda college-Kunnumpuram road from Ch.0/000to 0/500(both side)
          T No.239 Tvpm City Flood -2011 Clearing and repairing side drain of Spencer Jn. -Vazhuthacaud road at Ch.0/000 to 1/200
          T No.241 Tvpm City Flood -2011 Clearing and repairing side drain of Kunjalummoodu - Karamana road at Ch.0/300 to 0/500
          T No.242 Tvpm City Flood -2011 Clearing and repairing side drain of Thirumala - Trikkannapuram road at Ch.0/000 to 3/300
          JNNURM Rectification road cutting done by KWA for laying pipe line in Peroorkada Sasthamangalam road.
          D/W JNNURM Rectification of road cutting done by KWA for laying pipe line in Peroorkada Nettayam road
          T No.221 Tvpm City Flood -2011 Clearing and repairing side drain of Padinjarekottah -Kanjiravilakom road at Ch.0/000 to 0/500
          T No.222 Tvpm City Flood -2011 Clearing and repairing side drain of Statue - Genaral Hospital - Vanchiyoor road at Ch.0/000 to 1/500
          T No.225 Tvpm City Flood -2011 Clearing and repairing side drain of Statue - Chirakkulam - Puthen road at Ch.0/000 to 0/700
          T No.231 Tvpm City Flood -2011 Clearing and repairing side drain of Manacaud - Valiyathura road at Ch.1/450 to 1/600
          T No.236 Tvpm City Flood -2011 Clearing and repairing side drain Karamana - Soman Nagar road at Ch.0/000 to 1/780 (Balance portion)
          T No.238 Tvpm City Flood -2011 Clearing and repairing side drain of Pulimoodu - Residency road at Ch.0/000 to 1/000
          T No.229 Tvpm City Flood -2011 Clearing and repairing side drain inValiyathura -Airport road at Ch.0/000 to 1/500
          T No.227 Tvpm City Flood -2011 Clearing and repairing side drain of Manacaud - Valiyathura road at Ch.1/700 to 2/000
          T No.237 Tvpm City Flood -2011 Clearing and repairing side drain at Kalyan Hospital - Therakom road at Ch.0/000 to 1/150
          T-222/Dn.Renewal programme 2012-13. Improvements to Pulikuzhy Thalavila road km 0/00 to 0/550 with widening and providing 40mm chipping carpet under Roads section Kilimanoor.
          T No.234 Tvpm City Flood -2011 Clearing and repairing side drain Killippalam - Attakkulangara(Chalai By pass)Right side at Ch.0/000 to 1/500
          T-221/Dn. Flood damages. 2012-13.Resufacing to Vettikonam Pannikkuzhykkara Devi temple road in vattiyoorkavu ward.
          Providing bit chipping carpet to Kallara - Adappupara road from km 5/000 to 6/500
          Providing bit chipping carpet work at Muthiyavila - Ottasekharamangalam Road from KM 0/000 to 3/000
          T-219/Dn. Deposit work 2012-13. SPARK project. (Kalippara project) urgent restoration of roadway after laying water transmission main line in Thirupuram Mavilakkadavu road between km 0/00 to 3/200.
          T-225/Dn. Renewal programme 2012-13. Improvements to Palode braimore road from km 11/500 to 13/250.
          Providing 20mm bit chipping carpet in Muthiyavila - Ottasekharamangalam Road 3/000 TO 5/200
          Vamanapuram-Chittar Road km 20/000 to 21/030
          FD-Providing 20mm bit chipping carpet to Azhoor -Perumathura road km 0/00 to 1/100
          FD-Providing 20mm bit chipping carpet to General Hospital-Thampuranmukku road km 0/00 to 0/480.
          FD-Providing 20 mm bit chipping carpet to Thachottukavu-Mangattukadavu road km 0/00 to 3/050
          T-223/Dn.Renewal programme 2012-13.improvements to Thannimoodu Perayam Chellanji road from km 3/500 to 5/00.
          Providing 20mm CC to Aryanad-Palode Road from km 13/350 to 13/500
          FD-Providing 20mm bit chipping carpet to Anthiyoorkonam-Nellicaud road km 0/00 to 2/000
          FD-Providing 20mm bit chipping carpet to Peyad-Vilappinsala-Mulayara km 0/00 to 2/100
          FD-Providing 20mm bit chipping carpet to Kunnukuzhi-Kolloor bridge.
          Providing 40mm CC to Mrithanikethan Company Mukku Veliyanoor Kulakkode Road from km 1/800 to 1/900
          T-226/Dn. Renewal programme 2012-13. resurfacing in Vattiyoorkavu Vayalikkada Harithanagar roadkm 0/00 to 5/00
          FD-Providing 20mm bit chipping carpet and covering slabs to PMG-Plamoodu road.
          FD-Providing 20mm bit chipping carpet to Sreekariyam-Kazhakuttom (via Kulathoor) km 5/500 to 6/500.
          Prviding 20mm thick bit chipping carpet work in Vamanapuram-Chittar Road km20/000 to 21/030
          Aruvippuram Festival 2010 - Urgent rectification work to the R.R masonry side drain in between Arumaloor and Kandala in Balaramapuram Kattakada road Km at 7/700.
          Aruvippuram Festival 2010- Drain clearance and formation of Aruvipuram Perumkadavila road Ch: 0/00 to 2/00.
          Aruvippuram Festival 2010 - Drain clearance and formation of Perumpazhuthoor Aruvippuram road Km 0/000 to 2/000.
          Aruvippuram Festival 2010 - Urgent rectification work in Neyyattinkara Moolaikonam road Km 0/000 to 3/000.
          Construction of a bridge at 10th mile stone Killi river connecting Mulamukku to State Highway Thiruvananthapuram - Shenkotta Road
          T-224/Dn.Renewwal programme 2012-13. Providing 40mm thick chiping carpet to Nellikadu Kanjappara Santhigiri Ashramam road km. 0/00 to 1/350.
          Aruvippuram Festival 2010 - Urgent rectification works of Mampazhkara Bridge.
          Aruvippuram Festival 2010 - Clearing of side drain formation work and urgent rectification work of Aruvippuram Marayamuttom road Km 0/000 to 2/000.
          F/D 2010-11 Providing bit Chipping carpet to Aanad Branch Road from Km. 0/00 to 5/250.
          F/D 2010-11 Releasing water stagnation by Cong. Side drain Ch.4/00to4/500.in Balaramapuram Vizhinjam road.
          F/D 2010-11 Urgent rectification to the damaged R/wall & Con. of CC drain at Nagaroor Karete road Ch. 0/00 to 1/00
          F/D 2010-11 Providing bit Chipping carpet to bund portion of Vellayani Lack road Km.2/200 to2/800.
          F/D 2010-11 Providing bit Chipping carpet to Chullimanoor Panayamuttom road Km 0/00to 5/00.
          T-230/Dn. MLA's Asset Development fund 2012-13. Kattakkada constituency. Providing bit chipping carpet to kuruvimugal Manappuram Malayinkil road.
          F/D 2010-11 Rectification to the damaged Side drain in Parassala Kollamcode raod Ch. Km.0/00 to 0/150.
          T-229/Dn. MLA's Asset development fund 2012-13. Kattakkada constituency. improvements and widening Thungampara Uonampara Nellikadu Pottankavu road between km 0/00 to 3/00.
          T-228/Dn.MLA's asset Developmnt fund 2012-13 kattakada constituency. improvements to puliyarakonam mannayam road between km 0/00 to 1/300.
          mla'S sdf 2012-2013-Concreting of Thattarauparambu Devi Temple Road in VP Thampi Road(Balance portion)in Kudappanakunnu
          13th F/C Scheme - Construction of CC drain at Kiliyoor - Karamoodu road between Km 2/400 to 2/500.
          T-227/Dn. MLA's Asset Development fund 2012-13. Kattakada constituency. improvements and bit chipping carpet in Kandala Thiralikuzhi Mundukonam road bt. km 0/00 to 2/500.
          DW-Restoration of trenching due to laying UG cable along Kariyavattom-Thrippadapuram road.
          DW-Restoration of trenching due to laying UG cable along Pongummoodu-Anappadu road.
          Providing 20mm bit chipping carpet work in Vamanapuram Kalamachal road from KM 2/000 to 3/600
          FD-Construction of CC drain on Kampipalam-Puthenpalam road.
          DW-Restoration of trenching due to laying UG cable on Plamoodu-Thekkumoodu-Mulavana.
          Urgent patch works to9th Mile T S road to Aruvikkara KM 0/000 to 3/300
          T No.244 Tvpm City Flood -2011 Clearing and repairing side drain of Mudavanmugal road at Ch.0/800 to 2/000
          Flood Damages 10-11 Urgent bit chipping carpet to Krishnapuram Market to Kadinamkulam Backwaters from Km:0/00 t0 1/00
          F/D 2010-11 Releasing water stagnation and Cong. Side drain in CVR Puram Arayoor Ponvila road.
          T No.246 Tvpm City Flood -2011 Clearing and repairing side drain Vazhuthacaud - Thirumala road at Ch.0/000 to 4/500
          T No.247 Tvpm City Flood -2011 Clearing and repairing side drain from Cotton hill to Kundamonkadavu road at Ch.0/500 to 5/000
          T No.245 Tvpm City Flood -2011 Clearing and repairing side drain in Thirumala - Mangattukadavu road at Ch.0/000 to 1/500
          T No.248 Tvpm City Flood -2011 Clearing and repairing side drain Forest Office - Bakery Jn. road at Ch.0/000 to 2/000
          T No.251 Tvpm City Flood -2011 Clearing and repairing side drain of Manjalikkulam road from Ch.0/000 to 0/750
          T No.249 Tvpm City Flood -2011 Clearing and repairing side drain at Karamana - Thaliyal. road at Ch.0/000 to 1/600
          Construction of connecting road from Kerala Water Authority compound to NGO quarters road at Observatory.
          DW-Restoration of trenching due to laying UG cable on Kumarapuram Pothujanam to Green valley.
          construction of culvert in front of Kudappanakkunnu Civil station in Kudappanakkunnu road.
          Reconstruction of damaged retaining wall and cement concrete drain at Kanjirampara colony junction in Maruthankuzhy-Vattiyoorkavu road.
          Urgent rectification works to Peroorkkada- Sasthamangalam road.
          13th F/C Scheme Urgent patch repairs to Balaramapuram Vizinjam road between Km 7/200 to 8/000
          Attukal Ponkala Festival- Providing bit chipping carpet and clearing side drain in Manacaud- Konchiravila road.
          Attukal Ponkala Festival- Providing bit chipping carpet to Konchiravila - Kalladimugham- Ambalathara road.
          Attukal Ponkala festival - Painting pedastrian crossing and centre line and zeebra line using Retro reflective paint in various roads under city roads section No.I, Thiruvananthapuram.
          Urgent patch repairs to Thiruvananthapuram Vizinjam road between Km 13/200 and 13/700
          13th F/C Scheme urgent patch repairs to Aruvippuram Marayamuttam road bet Km 0/000 to 2/000
          Attukal Ponkala festival-Urgent patch work in Thirumala-Kunnappuzha road.
          Attukal Ponkala Festival- Urgent rectification works to the Paruthippara - Muttada road.
          Attukal Ponkala Festival-Reconstruction of culveert in Mannanthala-Mukkola road.
          T No.250 Tvpm City Flood -2011 Clearing and repairing side drain Aryasala road from Ch.0/000 to 0/350 (balance portion)
          T No.265 Tvpm City Flood -2011 Clearing and repairing side drain of T.K.Divakaran road at Ch. 0/000 to 1/100
          T No.277 Tvpm City Flood -2011 Clearing and repairing side drain of Museum - Nanthancodu road from Ch.0/600 to 0/900 (balance portion)
          T.No 257 - Tvpm City Flood - 2011- Clearing and repairing side drain of Golf links road at Ch.0/000 to 1/400
          T.No 255 - Tvpm City Flood - 2011- Clearing chocked up side drain and rectification of side drain in Peroorkada -Vattiyoorkavu road up to Mannarakonam Ch.0/000 to 3/000
          T.No.100 Special Development Fund for MLA's SDF 2012-13-Vattiyoorkavu L.A Constituency, Construction of Bus Shelter at Peroorkada junction in Kudappanakunnu road, Chettivilakom Ward.
          T No.252 Tvpm City Flood -2011 Clearing and repairing side drain and providing covering slab at Thampanoor fly over to Vellayambalam road from Ch.0/000 to 4/000 (balance portion)
          DW-Restoration of trenching due to laying UG cable on Ulloor-Akkulam road from Prasanth nagar to Air force gate.
          DW-Restoration of trenching due to laying UG cable on PMG-Law College road,Moolavilakom-Pattoor,Vadaikkadu-Kolloor road.
          T No.253 Tvpm City Flood -2011 Clearing and repairing side drain of Sreekumar Jn. to Nanthavanam and Museum road from Ch.0/000 to 1/400 (balance portion)
          T.No.101 Special Development Fund for MLA's SDF 2012-13-Vattiyoorkavu Constituency Construction of Bus Shelter at Peroorkada junction for Gents in T.S.Road
          T.No.102 Special Development Fund for MLA's SDF 2012-13-Vattiyoorkavu Constituency Construction of Bus Shelter at Peroorkada junction for Ladies in T.S. road
          T.No 260 - Tvpm City Flood - 2011- Clearing chocked up side drain and rectification of side drain in Madathunada MLA road Ch.0/000 to 0/300
          T No.262 Tvpm City Flood -2011 Clearing and repairing side drain of Nanthencode - Cliff House south approch road from Ch.0/000 to 1/500
          KARIKKAKAM TEMPLE FESTIVAL 2012.Urgent patch repair to Chakai- Vattathoppu road Km 2/600 to 3/200
          KARIKKAKAM TEMPLE FESTIVAL 2012.Urgent patch repair to All saints college to Veli road 1/500 to 2/750
          T.No.254 Tvpm City flood - 2011, C learing chocked up side drain and rectification of side drain in Ambalanagar road at Ch.0/000 to 0/400
          T No.270 Tvpm City Flood -2011 Clearing and repairing side drain of Moolathalakkal - Madathilnada MLA road from Ch.0/300 to 1/350
          T No.276 Tvpm City Flood -2011 Clearing and repairing side drain of YMR -Kavu - Kuravankonam road from Ch.0/300 to 0/800 (balance portion)
          T No.279 Tvpm City Flood -2011 Clearing and repairing side drain of Vattiyoorkavu - Kulasekharam road from Ch.0/300 to 3/000
          T No.282 Tvpm City Flood -2011 Clearing and repairing side drain of Nettayam Jn. at Ch.3/450
          T No.269 Tvpm City Flood -2011 Clearing and repairing side drain of Pangodu - Maruthankuzhy road from Ch.0/000 to 1/280
          T No.273 Tvpm City Flood -2011 Clearing and Choked up side drain and rectification of side drain in Peroorkada - Manikanteswaram -Nettayam road at Ch.0/000 to 3/300
          Improvements to Cherunniyoorkadavu Alumoodu road ch.0/00 to 3/500 km.
          Budget work Improvements to Thottumukku-Memala-Kalamkavu road km.0/000 to 4/650.
          Vithura-Bonaccord Road from KM 12/000 to 15/000
          D/W-Rectification of tar cut due to laying XLPE cable by KSEB for Ramachandra Textiles in Vasudevavilasom road.
          APF-Providing bit chipping carpet works to Vettimurichacotta- Padinjarekottah and Vazhappally - Azhikottah road.
          APF- Providing bit chipping carpet to Attakkulangara- Killippalam Bye pass road.(Left lane)
          T.No 259 - Tvpm City Flood - 2011- Clearing chocked up side drain and rectification of side drain in NCC road Ch.0/500 to 1/550
          D/W- Rectification of tar cut due to laying UG cable by KSEB to Thycaud-Mettukkada road for New Bharath Tyres, Althara - Vellayambalam road for Heera Blue Berry, Vanrose- Jaccob road for Chakra towera
          APF- Providing bit chipping carpet work in Aryasala and Chalai Bazar road.
          D/W-JBIC/Rectification works due to laying of pipe line for Bharathiya Vidya Bhavan in Plavodu road, Soorya Hollow bricks in Thittamangalam road near Kadayilmudambu in Kulasekharam road at Mukola junc
          T No.261 Tvpm City Flood -2011 Clearing and repairing side drain of Upper merdian road from Ch.0/000 to 1/250
          T No.263 Tvpm City Flood -2011 Clearing and repairing side drain of Maruthankuzhy- Kachani road at Ch.0/000 to 1/200
          D/W- Rectification works for laying power cable from Krishna Nagar garden structure to Shyla apartment in Golf Link in Jawahar Nagar -Kowdiar road.
          KWA-JNNRUM- Urgent rectification works due to laying of 110mm PVC pipe by KWA under JNNRUM project to the road from East Mukkola junction to Pallimukku.
          Attukal Ponkala Festival- Clearing side drain and providing covering slab in Karaman-Kalady road (via Soman nagar).
          D/W-Rectification of tar cut due to laying drainage pipe by KWA in Ayurvedacollege-Chettikulangar road.
          APF- Providing bit chipping carpet to Pulimoodu-Modelschool-DPI and around residency road.
          D./W- Rectification of tar cut by KWA for taking water connection for houses in various roads under city roads section No.II, thiruvananthapuram.
          T-618/Dn. Urgent Special repairs to the Pozhiyoor bridge across A.V.M Canal in Neyyattinkara taluk.
          T-599/Dn. Resurfacing the road Padinjare Nada to Azhicotta Jn. ch 0/700 to 1/050.
          Providing covering slabs and maintenance of side drain and allied works in Medical College – Chalakkuzy road
          Vengavila -Moozhi road from KM 2/500 to 5/000
          APF Providing bit chipping carpet to Attakkulangara- Killippalam Bye pass road ( Right Lane)
          APF- Providing bit chipping carpet work to Spencer - Bakery - vazhuthacaud road.
          D/W-TSS-Mac- Urgent rectification works due to laying of 150mm SW pipe branch sewerline from the existing Charachira sewerlinetowards YMR junction.
          D/W-Rectification of tar cut by KWA for taking water connection for houses in various roads under city road section No.I, thiruvananthapuram.
          T.No 256 - Tvpm City Flood - 2011- Clearing chocked up side drain and rectification of side drain in Kuravankonam - Maruthoor road at Ch.0/000 to 1/500
          D/W-Rectification of tar cut due to laying 200mm PVC pipe by KWA near Chakrathil Siva temple in Thirumala Trikkannapuram road.
          D/W- rectification of tar cut due to construction of overflow condut by KWA from Karimadam pond to Attakkulangara Peoples library in Killippalam - Attakkulangara road.
          D/W-Rectification of tar cut for laying Optical Fibre cable by BSNL from Poojappura Exchange to Poojappura Chithirathirunal Medical Science Institute .
          T.No 258 - Tvpm City Flood - 2011- Clearing chocked up side drain and rectification of side drain Vattiyoorkavu - Vellaikadavu road Ch.0/000 to 3/200
          T No.278 Tvpm City Flood -2011 Clearing and repairing side drain of Nettayam - Manalayam - Moonnammoodu MLA road from Ch.0/000 to 1/000
          T No.283 Tvpm City Flood -2011 Clearing and repairing side drain of Sasthamangalam - Maruthankuzhy road from Ch.0/000 to 1/000
          T No.286 Desaster Management- Flood Damage- Re-Construction of culvert at Panavila -Hantex road
          T No.287 Desaster Management- Flood Damage- Re-Construction of flood dammaged side drain frfom Puthenpalam to Ponnara bridge
          D/W-Rectification of tar cut due to laying 11KVUG cable by KSEB in Perumthanni-Padinjarekotta-Kanjiravilakom road and for sreyas Appartment in Sukumaran Nair road.
          Vithura-Bonaccord Road from KM 9/00to 12/00 ( retender)
          D/W-Rectification of tar cut due to laying 50mm PVC pipe by KWA to Kunjalummoodu to Special Sub jail in Poojappura -Kunjalummoodu road.
          T No.271 Tvpm City Flood -2011 Clearing and Choked up side drain and rectification of side drain of Vazhayila Jn.in TS road at Ch.1/000
          T No.274 Tvpm City Flood -2011 Clearing and repairing side drain of Plamoodu -Charachira-YMR road from Ch.0/000 to 1/200
          D/W-Rectification of tarcut due to laying pipe by KWA for taking water connection for houses in variouse roads under city Roads Section No.III, Thiruvananthapuram.
          KARIKKAKAM TEMPLE FESTIVAL 2012.Urgent patch repair to Veli- Venpalavattom road Clay factory to Railway station ( 0/000 to 1/000)
          T No.264 Tvpm City Flood -2011 Clearing and repairing side drain of Maruthankuzhy- Kachani road at Ch. 1/200 to 2/500
          T No.266 Tvpm City Flood -2011 Clearing Chocked up side drain and rectification of side drain in Krishna Nagar road Ch.0/000 to 2/210
          T No.268 Tvpm City Flood -2011 Clearing and repairing side drain YMR - Kuravankonam road at Ch.0/000 to 1/500
          T No.272 Tvpm City Flood -2011 Clearing and repairing side drain of Plamoodu - Marappalam Loop road from Ch.0/000 to 0/400
          A P F-Painting Pedastrian crossing, centreline using Rectro reflective paint in various roads under city roads section No.II, thiruvananthapuram.
          T No.275 Tvpm City Flood -2011 Clearing and repairing side drain of YMR -Kavu - Kuravankonam road from Ch.0/000 to 0/300 (balance portion)
          T No.280 Tvpm City Flood -2011 Clearing and repairing side drain of Nettayam - Manalayam - Moonnammoodu MLA road from Ch.1/000 to 2/500
          T No.284 Tvpm City Flood -2011 Clearing and repairing side drain of road inside Jawahar Nagar at Ch.0/000 to 5/000
          136/D/W-KSEB- Urgent rectification works due to laying 11KV XLPE cable from Manmohan structure to the Pro.RMU at Nikunjam and Avenue manor Transformer for Great India Estates Pvt. Ltd. at Jawaharnagar
          T.No.104 MLA's SDF 2012-13 Construction of Concrete road at Kuzhivila road near Plavode junction in Kodunganoor Ward of Vattiyoorkavu Constituency Ch.0/000 to 0/700
          U/R/W toVayalikkada - Choozhampala road ch1/500 to 3/00.
          T No.267 Tvpm City Flood -2011 Clearing and repairing side drain of Maruthankuzhy- Edapazhinji (Kochar road) at Ch. 0/000 to 0/500
          T No.281 Tvpm City Flood -2011 Clearing and repairing side drain of Cliff House road from Ch.0/000 to 1/200
          T No.285 Tvpm City Flood -2011 Clearing and repairing side drain of Vettamukku - Pallimukku road at Ch.0/000 to 1/200
          U/R/W toChoozhampala- Mukkola road Ch. 3/000 to 5/500.
          T-612/Dn. MLA's S.D.F - West L.A Constituency - Construction of drain and raising the road surface to avoid water stagnation from Puthenpally in Enchakkal S.M Lock road. .
          Urgent patch repairs and pot hole filling at Medical College-Chalakkuzhi road 0/000 to1/200
          F/D 2010-11 Providing Bit Chipping Carpet to Enikkara Kallayam Road Km.0/00 to 4/400.
          F/D 2010-11 Reconstruction of Side drain in Neyyattinkara Kattakada Road at Ch. 3/00 to 3/200.
          F/D 2010-11 Reconstruction of Collapsed Retaining wall at Puthenroad Jn. Ponnara Bridge.
          Upgradetion Works 2010-11 Pandakasala Thekkumbhagam Chekkalavilakam road from Km.1/400 to 2/800.
          Upgradetion Works 2010-11 Anjenjo Muthalapozhi Road from Km.1/350 to 3/500.
          Upgradetion Works 2010-11 Of Parippally Madathara road from Km.8/400 to 9/00.
          T.No.103 Special Development Fund for MLA's SDF 2012-2013-Vattiyoorkavu Constituency Construction of Bus Shelter at Kowdiar in Vellayambalam direction at T.S.Road in Kowdiar Ward.
          Upgradetion Works 2010-11 Of T.K. Divakaran road from Ch. 0/00 to 1/150.
          Upgradetion Works 2010-11 Of YMR to Kuravankonam road (Nagarukavu road) from Ch.0/00 to 0/700.
          Upgradetion Works 2010-11 Of approach road to Upper Meridian road from Kuravankonam Ch.0/00 to 0/100.
          Upgradetion Works 2010-11 Of Nagaroor Karette road from Km.5/500 to 6/100.
          Upgradetion Works 2010-11 Of Resurfesing the road from Peroorkada Vattiyoorkavu up to Mannarakonam
          Upgradetion Works 2010-11 Of Vilabhagam road Ch. from 3/900 to 4/400.
          Upgradetion Works 2010-11 Of Resurfacing to the Ambalanager road Ch. 0/00 to 1/00.
          Upgradetion Works 2010-11 Of Providing 40mm Chipping carpet in Pirappancode Pothencode road Ch.0/00 to1/00.
          F/D:- Improvements to Erappukuzhy Thekkeveettukara N.S.S Karayogam road.
          MLA-SDF- construction of RCC Bus shelter in front of CPT Nettayam.
          MLa0s-SDF-2011- Construction of RCC Bus shelter at Mukkolakkal Jn.
          SDF-MLA"S-construction of Bus shelter at Nettayam Junction in front of Panchayat Office.
          MLA Fund Improvements to Nilama road in Kalladimugham Ambalathara ward in Thiruvananthapuram East constituency.
          F/D:- Urgent re-surfaaacing the Kudappanakkunnu - thekkeveedu MLA Peravoor road.
          MLA-SDF- Construction of RCC Bus sheelter at Mannarakonam Junction.
          MLAS-SDF-Construction os Bus Shelter At Vattiyoorkavu Jn. infront of Policee station.
          Budget work 2010 Improvements to Palode junction.
          Upgradetion Works 2010-11 of Plavazhigom Anjengo road Ch.0/00 to 0/500.
          Upgradetion Works 2010-11 Of Panayilkadavu road Km.0/700 to 2/250.
          Upgradetion Works 2010-11 By providing 20mm Chipping Carpet with seal coat to Approach road from Kazhakuttom Railwaystation.
          Upgradetion Works 2010-11 By providing 20mm Chipping Carpet with seal coat toKaniyapuram Landing road 1/200 to 1/900.
          Upgradetion Works 2010-11 Of Peroorkada Mannanthala road Ch.1/00 to 2/00.
          Upgradetion Works 2010-11 By providing 20mm Chipping Carpet and drain in Thittamangalam Kochuplavodu road Ch.0/00 to 0/810.
          Upgradetion Works 2010-11 Improvements to Kulappada Panacode road Km. 3/600 to 4/00.
          T-216/Dn. MLA 's Asset Development fund 2012-13. Construction of new road from Devinagar to Edakkulam Temple road by providing 40mm chipping carpet in Vattiyoorkavu constituency.
          T-218/Dn. 13 th Finance commission 2012-13.Construction of cement concrete drain in Panachamoodu Panchankuzhy road km 0/180 to 0/400km.
          F/D/2010-UPW from Omkar Jn. -Edappazhanji-Pangode road.
          F/D/2010-UPW from Panavila-Vazhuthacaud-Edappazhanji road.
          T-215/Dn.13 th Finance commission 2012-13.Rectification of damages and providing 20mm thick bit Chipping carpet to Pongumoodu Aruvikkara road km 0/00 to 2/00.
          Construction of CC drain at Panachamoodu - Panchamkuzhi - Mullilavila road between Km 0/000 to 0/180.
          F/D-U/R construction of R/W for the collapsed embankment of Chemmaruthumukku-Puthusserimukku road ch 5/00 to 5/500 km.
          T-217/Dn.MLA"s Asset Development fund 2012-13.Construction of foot path and providing 40mm Chipping carpet to the road from Ambalamukku to Sreekrishnaswami temple oolampara road ch; 0/00 to 0/670 .
          T-214/Dn.Special repairs 2012-13.Construction of cement concrete drain in Neyyattinkara-Kattakada road ch; 4/500 to 5/00 km.
          Kovoor - Enaruvila road
          F/D 2010-2011 - Urgent rectification work in Studio road between Km 0/000 to 1/200.
          Industries dept. Access road to KINFRA ind. park THUMPA strenthening & widening & improvements of Carriage way of road from menamkulam - chittattumukku road
          Improvemnts to Arathanam - Vellumannadi-Palamkonam road km 0.00 to 11.530
          IMprovements to Vamanapuram-Chittar Road km 0/000 to 6/000
          Improvements to Traffic Island at Kanjiramkulam Junction.
          F/D 2010-2011 - Urgent bit chipping carpet work to Market Junction Vellarada in Parassala - Panachamoodu road Km 13/800 to 14/500.
          F/D 2010-2011 - Maintenance of side drain at Panachamoodu Junction in Parassala - Panachamoodu road Km 10/600 to 12/200.
          F/D 2010-2011 - Urgent bit chipping carpet work in Udiyankulangara - Kulathoor Chavady road Km 4/000 to 4/600.
          F/D 2010-2011 - Construction of Retaining wall to Balaramapuram - Vizhinjam road between Km 5/500 to 6/000.
          F/D 2010-2011 - Construction of Retaining wall to Mangalathukonam - Kottukal Ela road in between Km 1/400 to 1/600.
          F/D 2010-2011 - Urgent patch repairs to Kovalam 2nd approach road Km 0/000 to 0/800.
          144 MLA's SDF- 2010-11 Tvpm North LAC - Construction of RCC Bus Shelter at Mannarakonam Jn.
          143 SDF for MLA's - 2010-11 Tvpm North LAC- Construction of RCC Bus shelter at Vattiyoorkavu Jn in front of Police station.
          B/W Improvements to Thannimoodu - Silk farm Valliyaruppancadu road from km.5/00 to 10/000
          145 MLA's SDF - 2010 -11 Tvpm North LAC - Construction of RCC Bus Shelter in front of CPT,Nettayam.
          146 SDF - MLA -2010-11 Tvpm North LAC- Construction of RCC Bus shelter at Nettayam Jn.in front of Panchayath Office.
          147 SDF for MLA's 2010-11-Tvpm North LAC- Construction of RCC Bus shelter at Mukkolakkal jn.
          Upgradation works 2010-11 of Providing 20mm Chipping Carpet with seal coat to Kariyam Pothencodu road 0/050 to 0/300 &0/800 to 1/300.
          Upgradation works 2010-11 of Pandakasala Thekkumbhagam Chekkalavilakom road Ch. 0/00 to 1/400.
          Upgradation works 2010-11 of Kunnampuram road Ch:0/00 to 0/340.
          Upgradation works 2010-11 Providing 20mm Chipping Carpet to Neyyattinkara Railway Station Road
          Upgradation works 2010-11 of Providing 20mm Chipping Carpet to Kallara Hospital Road from Km.0/00 to 1/300.
          Upgradation works 2010-11 of Providing 20mm Chipping Carpet to Forest office Jn. to Bekary Ch.0/00 to 1/200.
          Upgradation works 2010-11 of Providing 40mm CC to Statue Chirakkulam Uppidamoodu road Ch.0/600 to 1/00.
          Upgradation works 2010-11 of Providing 20mm Chipping Carpet to Nalumukku Medical College road Ch.0/700 to 1/800.
          Upgradation works 2010-11 Providing 20mm Chipping Carpet to Barton Hill road
          Upgradation works 2010-11 Providing 20mm Chipping Carpet to Pettah Oruvathilkotta road Ch:0/00 to 0/200.
          Upgradation works 2010-11 Providing 20mm Chipping Carpet to Approach road to Veli Kadinamkulam road.
          Upgradation works 2010-11 Providing 20mm Chipping Carpet to Veli Venpalavattom Road Ch:0/050 to 0/450.
          Upgradation works 2010-11 of the road Ch.1/500 to 2/700 in Karalkada Subhash Nagar & Enchakkal Poonthura road.
          Upgradation works 2010-11 Resurfacing the road at ManalikkulamCh.0/00 to 0/750.
          Upgradation works 2010-11 Providing 20mm Chipping Carpet to Vattakulam Aruvikara road.
          Upgradation works 2010-11 of Manacaud Valiyathura road Ch.0/300 to 1/400.
          Upgradation works 2010-11 of Providing 20mm Chipping Carpet toChackai Vattathope road Ch.1/00 to 2/600.
          Upgradation works 2010-11 Impr. to Kulappada Panacode road Eassing gradient & Con. of CC side drain Ch3/600 to 4/00.
          Upgradation works 2010-11 of Providing 20mm Chipping Carpet to St.Xavier's Junction to Valiyathura via (Thaivilakom) from Ch.0/100 to1/100.
          Upgradation works 2010-11 of Resurfacing the road from Bakery Jn. to Womens College Ch 0/00 to 0/475.
          Upgradation works 2010-11 of Ayurveda College to Chettikulangara.
          Upgradation works 2010-11 of Vallakadavu Arattugate road from Ch.0/00 to 0/400.
          Upgradation works 10-11 of PTP road from Km 3/00 to 4/311
          T-212/Dn. Urgent rectification works to Pachalloor Venganoor road , Pallichal Vizhinjam road, Thennoorkonam Kottapuram road and Balaramapuram Vizhinjam road due to a KWA cutting for laying pipes for w
          MLA SDF Impro. to the road from Njalikonam to Krimkali Temple Balance Works.
          T-209/Dn. 13 th Finance commission 2012-13. Providing cement concrete drain in Pappanamcode Kotttoor road km. 1/400 to 1/900.
          Upgradation works 2010-11 of Providing 20mm Chipping Carpet toKaramana Thaliyal Road from Ch.0/00 to 0/350.
          T-213/Dn. Deposit work 2012-13. Rectification of tarcutting done by KWA due to laying pipe line for Daya Construction froam Concordiar school Peroorkada in Peroorkada Mannamoola road.
          T-210/Dn. Ordinary repairs 2012-13. Rectification of damages and resurfacing with 40mm chipping carpet to Panachamoodu Panchankuzhi Mulilavuvila road and construction of cement concrete drain between
          T-207/Dn. Urgent patch repairs to Vellanadu road from km 0/800 to 4/800, km. 5/400 to 6/500, and km.8/500 to 11/800.
          MLA SDF Con. of Side drain Culvert with covering slab in Kulathara Kalady South road in front of NSS Karayogam.
          T-208/Dn. 13 th Finance commission 2012-13. Rectification of damages and resurfacing with 20mm Chipping carpet to Mandapathinkadavu Vazhichal road between km 2/600 and 3/400.
          T-211/Dn. Deposit work 2012-13.Urgent rectification works to Muttakkadu Kovalam road due to KWA Cutting for laying pipes for water supply scheme to Vizhinjam Transshipment Terminal.
          T-205/Dn. MLAs SDF 2012-13. Vattiyoorkavu constituency. providing 20mm chipping carpet to Journalist colony road in NCC road Kudappanakkunnu and construction of aculvert.
          T-206/Dn.Upgradation 2012-13. Improvements to Kodithookiyakunnu Pongumoodu Kamukinkode road Under Roads section Venjaramoodu.
          UP 2010-11 of Tvpm Vizhinjam road Ch. 5/500 to to 7/00 & 9/00 to 10/500.
          UP 2010-11 Providing 40mm CC in Keezhaikonam Nellanad Road Km.0/00 to 1/750.
          UP 2010-11 of Nemom Punnamoodu road Ch. 0/00 to 2/650.
          UP 2010-11 Providing 20mm CC in Thakaraparambu Thattathumala Road Km.3/00 to 7/800.
          UP 2010-11 Improvements to Studio Road Ch Between 0/00 to 1/200.
          UP 2010-11 of Karakkonam Vlankulam Road Km3/500 to 5/400.
          UP 2010-11 Improvements to Aayroor Hariharapuram Nellettilkqadavu Road last reach Ch:4/400 to 5/100.
          UP 2010-11 Improvements to Cheruniyoorkadavu Branch road Ch.0/00 to 0/950.
          UP 2010-11 Providing 20mm CC in Karingal Coloney Road from Km.0/00 to 1/750.
          T.No.157,Urgent patch works to Punnakkamugal - Konkalam south road Jn.Ch.0/000 to 2/500
          T.No.159, Urgent patch works to Mannarakonam - Vellaikadavu road At Ch 0/000 to 3/700
          UP 2010-11 Navaikulam Pallickal road from km.0/00 to 3/00 (using 40mm CC.)
          T.No.160. Urgent patch works to NCC road at Ch.0/500 to 1/500
          T.No 159. Urgent patch works to Mannarakonam - Vellaikkadavu road at Ch.0/000 to 3/700
          Sanghumugham-Veli road (via) Vettukadu.
          T.No.161, D/W.KWA- rectification of tar cut due to laying SW pipe from Ayanikkadu to Kozhiyottu in West fort - Kanjiravilakom road Ch.1/440 to 1/500.
          Maintanence and repairs to Aryanad-Palode Road from KM 13/500 to 13/750
          UP 2010-11 Improvements to Aruvippuram Perumkadavila road Ch.0/00 to 2/00.
          UP 2010-11 to Vattavila Pirayimoodu road Km.0/00 to 1/00 &2/00 to 2/800.
          Urgent repairs to Aryanad Pezhumoode road from km 0/000 to 3/000
          UP 2010-11 Udiyankulangara Kulathoor Chavady road Ch.4/00 to 5/500.
          UP 2010-11 Improvements to Neyyattinkara Marayamuttom road at Ch.0/00 to 3/00.
          UP 2010-11 Providing 20mm CC in Perukavu Choozgattukotta road from Km.1/400 to 2/850.
          UP 2010-11 Providing 20mm CC in Chowalloor NSS High School Road Ch.0/00 to 2/00.
          T.No.162, D/W- APDRP-Rectification of tar cut due to laying HT Electrical cable by KSEB in East fort - Vasudevavilasom road.ch.0/000 to 0/361.
          T.No.156.Urgent patch repairs from Kumarichantha to Poonthura in Ambalathara - Poonthura road. at Ch. 0/550 to 1/950.
          T.No.158, Urgent patch works to Vattiyoorkavu - Kulasekharam road.Ch.0/000 to 2/000
          13th Finance Commission - Re-construction of Approach wall of Thottinkara Culvert at Udiyankulangara - Kulathoor chavady road.
          Urgent Patch repairs to vettinad velavoor road 4/000 to 6/000
          Maintanence and repairs to Nedumangad Aruvikkara Road km 4/900 to 5/100
          Improvements to Parottukonam - Kariyam road reach II km. 1/800 to 3/200.
          Urgent patch repaors to Panavoor Attinpuram perayam road 0/500to 2/900
          UP 2010-11 Anthiyoorkonam Thachottukavu road Providing Bit Chipping Carpet.
          Upgradation works - Improvements to Janardhanapuram Mundale road ch 0/00 to 1/200
          T.No.163.D/W.-Rectification of tar cut due to laying OFC from Attakulangara BSNL.MH to East Fort BTS. Ch.0/000 to 0/500
          T.No.155. Urgent patch repairs to Valiyathura - Shanghumugham road at Ch.2/300 to 3/000
          T No.154, Urgent patch repairs to Valiyathura - Shanghumugham road. at Ch. 0/000 to 0/700.
          Improvements to Parottukonam Kariyam road reach I km.0/00 to 1/800.
          T. No.164, D/W. Urgent rectification of tar cut due to laying UG Cable by KSEB at Pallitheruvu in Ambalathara - Poonthura road Ch.0/550 to 0/950
          Construction of CC drain to Balaramapuram - Poovar road at Ch: 11/800 to 12/000.
          Urgent Patch repairs to Vattappara - Kuttiyani road from km 0/000 to 2/500
          Urgent Patch repairs to vettinad velavoor road km 2/000 to 4/000
          UP 2010-11 Providing 40mm CC in Statue to Collectorate Road
          UP 2010-11 Providing 20mm CC in Cotton Hill to Kundamankadavu Road Ch:0/00 to 2/00.
          UP 2010-11 Providing Bit Chipping Carpet to Oottukuzhi Cherukadu road Ch. 0/00 to 2/500.
          UP 2010-11 Providing 20mm CC in Vembayam Pallippuram road Km 7/500 to 9/00 and 10/800 to 12/800.
          UP 2010-11 Providing 20mm CC in Spencer to Vazhuthacadu road Ch. 0/00 to 1/200.
          UP 2010-11 Providing 20mm CC in Pulimoodu Residency Ch.0/00 to 1/144.
          UP 2010-11 Providing 40mm CC in Valiyathura Shangumugham road Ch:0/775 to 1/500.
          UP 2010-11 Providing 20mm CC in Padinjattumukku Puthukurichy Road Km.1/700 to 2/00 &4/100 to 5/700.
          UP 2010-11 Providing 40mm CC inKilimanoor KSRTC Bus Stand Road.(Old MC road from Km 38/00 to 38/400.
          O/R 10-11 Urgent bit chipping carpet to Kilimanoor-Madavoor road from km 6/00 to 8/00
          O/R Urgent bit chipping carpet to Nagaroor-Karette road from km 0/00 to 3/00
          UP 2010-11 Providing 20mm CC in Venjaramoodu Attingal Road Ch.6/00 to 7/200.
          UP 2010-11 Providing 20mm CC in Venjaramoodu Attingal Road Ch.7/200 to 9/500.
          O/R 10-11 Urgent bit chipping carpet to Kilimanoor-Madavoor road from km 8/00 to 10/00
          O/R Urgent bit chipping carpet to policestion-Tholikuzhy road from km 0/00to 3/00
          UP 2010-11 Providing 20mm CC in Kanjiramkulam PolliceStation Road Ch.0/00 to 2/00.
          Urgent patch repairs to Muthiyavila - Ottasekharamangalam Road from km 0/000 to 3/000
          O/R Urgent bit chipping carpet to Alamcode-Meerankadavu road from km 8/00 to 9/560
          UP 2010-11 Providing 20mm CC in Venjaramoodu Attingal Road Ch.9/500 to10/460.
          UP 2010-11 to Chengavila Maradi Chakottukonam road Ch 1/00 to 3/05.
          UP 2010-11 Providing 20mm CC in Palode Barimore road from Km.0/500 to 4/500 and 12/00 to 15/030.
          UP 2010-11 Providing 20mm CC in VEmbayam Nedumangadu road from Km.0/00 to 3/00.
          UP 2010-11 Vazhayila Mukkola road (East Mukkola) Widening the road and rectification of side drain Ch 0/00 to 1/900.
          Budget Work. Improvements to the Azhikode (9th Mile T.S.Road) Aruvikkara road by providing 50 mm BM & 25 mm BC from Km 0/000 to 4/300.
          UP 2010-11 Providing 20mm CC inPeroorkada Manikanteswaram Nettayam road Ch 0/00 to 1/600.
          UP 2010-11 Providing 20mm CC inNettayam Manalayam MLA Road Ch 0/00 to 1/800.
          UP 2010-11 Providing 40mm CC in Maruthankuzhy Kanjirampara Road .
          UP 2010-11 Providing 20mm CC in Around Residency Ch:0/00 to1/140.
          Budget work Improvements toParuthippally Kottoor (via) Manthikulam ch.3/000 to 5/600 km.
          Choozhampala -Maruthur
          UP 2010-11 Providing 20mm CC in Rose house to Panavila road.
          ambalamukk -muttada
          UP 2010-11 Strengthening and providing BM and BC to the road from Muttada to Paruthippara.
          UP 2010-11 Providing 20mm CC in Kunnapuzha School to Aramada Cburch Km 0/00 to 1/250 & 2/200 to 2/500.
          Construction of new Kundamankadavu bridge in Thiruvananthapuram Kattakkada road across Karamana river.
          UP 2010-11 Providing 20mm CC in Manchavilakom Thrippalavoor road Km 0/00 to 2/900.
          UP 2010-11 Providing 20mm CC in Malamughal Kachani road Ch.0/00 to 2/500.
          UP 2010-11 Providing 20mm CC in Kesavadevu Road from Ch 0/00 to 1/100.
          UP 2010-11 Providing 20mm CC in kodithookiyakunnu Pongumoodu Kamukincode Road
          UP 2010-11 Providing 20mm CC in Peroorkada Mannamoola road At Ch0/00 to 0/450 & 2/100 to 3/200.
          UP 2010-11 Providing 40mm CC in Pulimoodu to Kaithamukku road Ch.0/00 to 0/920.
          UP 2010-11 Providing 20mm CC in Tagoor road Ch 0/00 to 1/25.
          vayalikada choozhampala
          UP 2010-11 Providing 20mm CC in Avanakuzhi Ambalam road Ch 0/00 to 2/00.
          UP 2010-11 Providing 20mm CC Thirupuram Mavilakadavu road From Km.0/00 to 3/200.
          UP 2010-11 Providing 20mm CC in Aryasala Road
          UP 2010-11 Providing 20mm CC in Chalippatheru road Ch.0/00 to 0/300.
          UP 2010-11 Providing 20mm CC in Karamana Kalady road (Via) Soman Nager .
          UP 2010-11 Providing 20mm CC in Chiramukku Kalladimugham Ambalathara Milma Jn. Ch.0/00 to 1/200.
          UP 2010-11 Providing 20mm CC in East Fort to Killippalam Road (Chala Bazzar).
          UP 2010-11 Providing 20mm CC in Perumkuzhy Perumkuzhykadavu road Ch. 0/00 to 1/00.
          Up 2010-11 Improvements to Nediyamcode Mekkola road Km.0/00 to 1/200.
          UP 2010-11 Providing 40mm CC inVazhuthacadu DPI road from 0/00 to 0/500.
          UP 2010-11 Providing 20mm CC in Nediyamkodu Panatarakkal Road Ch.0/00 to 3/00.
          UP 2010-11 Providing 20mm CC in Vakkom Panayilkadavu Road Ch. 0/00 to 1/600.
          Improvements to Kalathukal-Uriyacode Road by providing 50 mm BM & 25mm BC from km. 0/000 to 4/400
          UP 2010-11 Providing 20mm CC in Thirumala Mangattukadavu Road.
          UP 2010-11 Providing 20mm CC in Mudavanmughal Road Ch. 0/00 to 1/00.
          UP 2010-11 Providing 40mm CC inPoojappura Loop road Ch.0/00 to 0/250.
          UP 2010-11 Providing 40mm CC in New Theatre road (Service Road)from Ch.0/00 to 0/310.
          UP 2010-11 Providing 20mm CC in Althramoodu Thittayilmukku road Ch. 0/00 to 1/400.
          Improvements to Mampuzhakkara road ch. between 0/000 to 4/200.
          UP 2010-11 Providing 40mm CC in DPI Ammenkovil Road from Ch.0/00 to 0/252.
          BW 2011-12. Improvements to Chanichalkadavu-G.V Raja - Mylam School road by providing 40mm CC from km 0/000 to 2/500
          UP 2010-11 Improvements toDhanuvachapuram ITI Pongumpotta Railway Station road Ch0/00 to 2/300.
          UP 2010-11 Providing 20mm CC in Manacaud Perunally roadCh 0/00 to1/700.
          Improvements to Thevanpara Thekkummoodu Pachamala-Poriyakkadu Road by providing 40mm CC from km 0/000 to 2/200
          UP 2010-11 Providing 20mm CC in Kaliyikavila Kozhivila road Ch 0/00 to 1/600.
          UP 2010-11 Providing 40mm CC from Perumathura to Pozhikkara in Veli Kadinamkulam Road
          UP 2010-11 Providing 20mm CC in Ajentha Theatre , Centrel theatre, Kripa theatre road Ch.0/00 to 0/800.
          UP 2010-11 Providing 20mm CC in Puthenkada Karumanoor road Ch.0/00 to 1/200.
          UP 2010-11 Providing 20mm CC & Con. of side draain from St. Thomas Church to Thiruvallam road in Poonthura Ch.0/00 to 1/100.
          UP 2010-11 Providing 20mm CCto the Aryanadu Palodu Road Ch 13/500 to 16/000.
          Improvements to 8th Mile TS road(Keltron Junction) to Aruvikkara road by providing 40mm CC from 0/000 to 4/300
          UP 2010-11 Improvements to Edavacode Jn. to Edavacode Bus Station Road Ch 0/00 to0/800.
          UP 2010-11 Providing 20mm CC in Killippalam Iranimuttom Road Bund Road (Ch.0.00 to 1500 m) Total 2.15 KM.
          UP 2010-11 Providing 40mm CC in Bapuji Nager road Ch 0/00 to 1/4800.
          Providing 20mm C.C Nedumangadu - karipoor road 0.00 to 5.100
          R/P -Providing 40mm BM in Aryanad-Palode Road ch 0/00 to 5/800
          Chalakuzhy - med. college
          Upgradation phase II Renewal programme Improvements to Kallara Tholikuzhi road from km.0/000 to 5/300.
          Industrial Dept. / Access road to KINFRA Industrial Park Thumba : Strengthening, widening and improvements of carriage way of Road from Menamkulam to Thumba.
          Construction of Vallakkadavu Bridge across T.S Canal in Thiruvananthapuram.
          urgent rectification works toAryanad-Palode Roadfrom km 4/00 to 6/00
          urgent repairs toNedumangad Shorlacode Highway from km 4/200 to 5/00
          URGENT PATCH WORKS TO Nedumangad Shorlacode Highway KM 9/00 TO 12/00
          urgent repairs to Vellanadu-Aryanadu roadfrom km 1/00 to 3/00
          urgent patch worksKattakkada-Kottoor road km4/200 to 6/00
          Nedumangad Shorlacode HighwayFOMR KM 14/00 TO 16/500
          Vellanadu-Aryanadu road FROM KM 3/00 TO 4/400
          urgent repairs toAryanad-Palode Road6/800 to 9/600
          URGENT REPAIRS Kattakkada-Kottoor roadkm 0/700 to 2/00
          Urgent rectification works toNedumangad Aruvikkara Road km 1/000 to 2/000 and 4/000 to 5/100
          urgent patch works to Mrithanikethan Company Mukku veliyanoor Roadkm 1/300 to 2/500
          Urgent rectification works toPalode- Braimore Road,Balance reach km 0/000to 0/500
          Urgent rectifiation works toKalathukal-Uriyacode Road from KM 0/000 to 1/000
          urgent repairs to Mrithanikethan Company Mukku veliyanoor Roadkm 0/00 to 1/300
          Urgent rectification works toPuthenpalam-Venjaramodu Roadfrom KM10/000 to 11/500
          Urgent Bit chipping carpet works toPuthenpalam-Venjaramodu Roadfrom KM 4/000 to 5/000
          Urgent rectification works toPuthenpalam-Venjaramodu Roadfrom KM 8/000 to 9/000
          Urgent rectification works toPuthenpalam-Venjaramodu Roadfrom KM 6/500 to 8/000
          T-187/Dn.Renewal programme 2012-13. Resurfacing by providing 20mm thick chipping carpet to koduvazhannoor Panthuvila road from ch 0/00 to 2/00.
          T-190/Dn. Renewal programme 2012-13. improvements by providing 20mm chipping carpet to Ammankonam palli road km. 0/00 to 1/00.
          Urgent Rectification works to 8th Mile TS road to Aruvikkara 2/400 to 3/600
          T-192/Dn. Renewal programme 2012-13. improvemnts by providing 20mm Chipping carpet to Vallabhankunnu Karimbichimoozhi road in Pallickal gramma panchat km 0/00 to 1/00.t.
          T-193/Dn.Renewal programme 2012-13.improvements to Ambilimukku Valiyakunnu road in Madavoor gramma panchayat.km 0/00 to 1/00.
          T-191/Dn.Renewal programme 2012-13. Improvement by providing 20mm chipping carpet to Plachivila Eruthilacode road km 0/00 to 1/00 in Pallickal Gramma panchayat.
          Urgent rectification works to Kazhanad(Vattappara Nedumangad road) 2/250 to 3/00 and 3/250 to 3/800
          T.No.56 Premonsoon work 2012-13 - Clearing and repairing side drain of Moolathalakkal-Madathunada road(MLA road)at Ch.0/300 to 1/350
          Urgent Rectification works to 8th Mile TS road to Aruvikkara form KM 0/000 to 1/600
          Urgent rectificaton works to Kazhanad(Vattappara Nedumangad road) from KM 5/250 to 6/750
          Urgent rectification works to Karakulam-Mullassery Junction-Vengod road from KM 1/800 to 3/000
          Urgent Rectification works to Karakulam-Mullassery Junction-Vengod from KM 3/000 to 4/200
          Urgent rectification works to Vattappara - Kuttiyani - Pothencode road.from KM 2/500 to 4/000
          urgent bituman patch work in Vattappara - Kuttiyani - Pothencode road. from KM 2/500 to4/000
          I.T.Department Technocity-Strengthening, widening and improvements of carriage way of main approach road from N.H. towards West in Technocity at Pallippuram.
          Urgent bitumen patch works to Vamanapuram-Chittar Road from km 0/000 to 1/500
          T-203/Dn. TVM corporation works 2012-13.Strengthening,widening and improvements of carriageway of Vattavila keraladithyapuram road km 0.100 to 1/300 byproviding 25mm BC.
          T.No.95 Urgent Patch Repairs to Vattiyoorkavu - Vellaikadavu road Ch.0/400 to 1/400
          T-186/Dn. Renewal programme 2012-13.Providing 40mm Chipping carpet to Kumarapuram Sreemoolam lane ch:0/00 to 0/650.
          T-188/Dn. Renewal programme 202-13. Improvements to Poovanpara Vilappuram Kaithavanam road ch 0/00 to 0/450.
          T-200/Dn.13th Finance Commission 2012-13.Construction of side drain in Vembayam Pallippuram road km 10/200 to 10/600.
          T-202/Dn. TVM Corporation works 2012-13.Strengthening widening and improvements of carriageway of NH Kattavila Alen Head Man School road km. 0/00 to 1/300.
          Urgent bitumen patch work in Vattappara - Kuttiyani - Pothencode road.from KM 1 to 2500
          Urgent bitumen patch works to Vamanapuram-Chittar Road km 3/500 to5/500
          urgent birtumam patch work inVattappara - Kuttiyani - Pothencode road. from KM 4/00to 5/600
          T.No.93 MLA's SDF 2012-2013 TVPM LA constituency Road tarring of Azeez Nagar road in Vallakadavu - Karali road at Perunthanii Ward
          T.No.94 MLA's SDF 2012-2013 - Construction of Road at Sub lane of 11 of N.V Nagar - Peroorkada-Thiruvananthapuram.
          urgent bitumen patch work in Vembayam-Nedumangadu Road from KM 0/00 to1/200
          urgent bitmen patch work in vettinad velavoor road 0/00 to 2/00
          urgent bitumen patch work inVembayam Thalayil Thembamoodu road from KM 4/00 to 5/500
          kallara Adappupara road km 4/500 to 5/500Kallara - Adappupara road km 0/00 to 6/500
          T-182/Dn. Renewal Programme 2012-13.Providing 20mm chipping carpet to Mukkunnoor Kottukunnam Mavelinagar road ch: 0/00 to 2/00.
          T-185/Dn.Renewal programme 2012-13.Renewal programme 2012-13.Providing 40mm Chipping carpet in Kottamugal Palkunnu Chenniyodu road in Maranalloor panchayath.
          T-196/Dn.Tenewal programme 202-13. Providing 40mm Chipping carpet,contruction of drain and culvert in Peroorkada Krishnanagar road km1/00 to 2/200.
          T-201/Dn.TVM Corporation works 2012-13.Resurfacing in Nellikkuzhy Chennilodu Pothujanam road ch 0/00 to 1/500.
          T-204/Dn.Construction of culvert and resurfacing in panavila Oottukuzhy road.
          T-197/Dn.Investigation work. 2012-13.Construction of a Bridge at Thiruvallam Panathura across T.S canal in TVM district.
          T.No.54 Premonsoon work 2012-13 - Clearing and repairing side drain of Krishna Nagar road at Ch.0/500 to 2/210
          T-199/Dn. Renewal programme 2012-13. Improvements to Veli Venpalavattom road ch: 0/00 to 0/750km by providing 40mm Chipping carpet.
          chayam peringammala km 3/000 to 4/000
          Nedumangadu karipoor road km 2/000 to 4/000
          vVettinadu Velavoor road km 2/00 to 4/400
          Vettinadu Velavoor roa km 4/400 to 6/400
          chayam peringamala mroad km 3/00 to 4/00
          Premonsoon works - 2012-13 - Clearing and repairing side drain of Peroorkada-Vattiyoorkavu-Mannarakonam road Ch.0/000 to 0/400 and 0/800 to 3/000
          providing urgent bit cc to the approaches of the culvert at valicod junction at km 17 /500 in T S Road
          T-184/Dn. Renewal programme 2012-13. Providing 20mm bit chipping carpet in Elavinmoodu Pazhaveedu Velanvilakom road ch 0/00 to 0/300.
          T-189/Dn. Renewal programme 2012-13. Improvements to Punnokodam - Akkaravila road in vettoor panchayath by providing 40mm chipping carpet.
          T-195/Dn. Renewal programme 2012-13. Improvements to Elakamon post office-Mulaveedu -puthuval road from km 0/00 to 1/300 by providing 40mm chipping carpet in Elakamon panchayath.
          Premonsoon work - 2012-13-Clearing and repairing side drain of Moolathalakkal-Madathunada road(MLA road)at Ch.0/300 to 1/350
          T-181/Dn. Renewal programme 2012-13. Construction of culvert and side drain in Enikkara - Kallayam road beteen km 0/00 to 0/800 of karakulam panchayath.
          T-194/Dn. Renewal programme 2012-13. Improvements to Karippuram area in kattuvila Mukkolakkal kuttimavu road in Edava panchayath.
          Construction of a bridge at Mudavanmughal across Karamana river - Investigation and DPR preperation works..
          Urgent rectification works toPuthenpalam-Venjaramodu Roadfrom KM 5/000 to 6/500
          Urgent rectification works toPuthenpalam-Venjaramodu Roadfrom KM 12/500 to 13/000 and 13/700 to 14/500
          Urgent rectification works toPuthenpalam-Venjaramodu Roadfrom KM15/2 to 16/500
          Urgent Rectification works to Kazhanad(Vattappara Nedumangad road) form KM 3/800 to 5/250
          Urgent rectification works toAryanad-Palode Road from KM 14/000 to 15/000
          Providing 20mm Chipping Carpet to Medical Collge to Ulloor Road Ch. Km.0/00 to 0/700.
          UP 2010-11 of Manacaud Valiyathura road Ch.0/750 to 1/400 Kms.
          D/W Restoration work in Malayinkil Ooruttambalam road from Anappad bridge to Malayinkil exchange through Malayinkil Jn.
          Construction of Aryanadu-Aniyilakadavu bridge across Karamana river –Boundry stone laying
          MLA SDF for 2010 West LAC Construction of Draain at Sivaji lane in Muttathura ward.
          Re-Construction of bridge at Tennoor across Kallar River- Soil investigation works.
          R/P 2010-11 Providing 20mm CC to Kariyavattom Chengottukonam Road Ch. 1/100 to 2/400.
          UP 2010-11 of Manacaud Valiyathura road Ch.0/00 to1/750.
          F/D Con. of CC drain in Kilimanoor Alamcode Road Km. 6/500 to 7/500.
          F/D Con. of Retaining wall at eroded portion at Km5/400 of Kallara Adappupara Road.
          F/D Providing 20mm Chipping Carpet to Vithura Branch road from Km 0/400 to 1/300.
          Providing 20mm CC to Chayam Peringammala road from Km.5/200 to 6/200.
          UP 2010-11 Con. of drain at Manacaud Valiyathura road from Ch. 1/00 to 1/400.
          S/R Con. of Side drain from 17/400 to 17/600 of T.S. Road.
          R/P 2010-11 Providing 20mm CC to Kazhanad road Km 1/750 to 2/750.
          F/D Providing 20mm Bit Chipping Carpet in 9th mile T S road to Aruvikkara road.
          R/P 2010-11 Providing 20mm CC to PMG Patoor Ch.0/00 to 2/285 in portion of Thampuranmukku.
          R/P 2010-11 Providing 20mm CC to Narikallumukku Vattaplamoodu road
          O/R Works 2012-13 - Urgent rectification to Balaramapuram - Vizhinjam road between Km 0/000 to 3/300.
          O/R Works 2012-13 - Urgent rectification to Mottamoodu R.C.Church - Railway station road between Ch: 0/000 to 0/500 in Pallichal Panchayath.
          F/D 2010-11 Cieaning and chocked up Culvert and drain at Kattakada Jn.
          F/D Con. of Protection wall in vellanad Aryanad road from km 0/900 to 1/100.
          F/D Con. of Retaining wall at Km.4/00 in Vattappara Nedumangad road.
          F/D Reconstruction of Cuivert in TS road at Ch.12/500.
          F/D Con. of REtaining wall in 8th mile T.S. Road to Aruvikara Ch.2/00 to 2/200.
          F/D Con. of Culvert at km. 2/750 at Vattappara Nedumangad road .
          ARWS To Panavoor Pullampara and CembayamPanchayat laying 300mm Pumping main from WTP at Thenginkode to Aruvikara Bridge.
          Budget work - 2009-10 Improvements to Neyyattinkara Poovar road ch.0/000 to 10/000.
          F/D Con. of CC drain in to the Vembayam Junction Ch.21/00.
          F/D Con. of Side drain and Culvert in front of Mannathala Suryaprabha and Govt. press Road
          MLA-SDF-2010-11 Improvements to Channanvilakam-Kunchaluvilakam road in Edava Panchayath
          Improvements to Kattakada Kottoor road providing BM & BC from km.0/000 to 14/600.
          MLA-SDF 10-11 Improvements to Theruvumukku-Vayalazhikam road in Edava Panchayath
          MLA-SDF-10-11 Improvements to Chirayil road in Edava Panchayath
          Improvements by providing 40mm thick bitumen macadom in Chirayinkeezhu - Kaniyapuram road ch.0/00 to 4/400 km.
          Improvements to road in Pangode Military area in Edapazhinji Pallimukku road (Military area) construction of drain and foot path.
          T.No.72 D/W-Rectification of tar cut due to laying KSEB cable to Glenvalley Apartments in Mudavanmughal road and Norka centre to KSEB structure.
          35th National Games - Improvements to Vattiyoorkavu junction and Upgradation & Development of three roads viz, Vattiyoorkavu - Sasthamangalam, Vattiyoorkavu - Peroorkada, Vattiyoorkavu - Vazhayila - C
          T No.90 Disaster Management Natural calamities - providing 20mm Chipping carpet to the road inside P.T.P Nagar
          T No.92 Development of Attukal zone - Conducting total station Survey
          NABARD RIDF XVI. Construction of Moonattumukku Bridge across Neyyar river coinnecting Kattakkada and Aryancode panchayath in Thiruvananthapuram District.
          OR -2012-13: Resurfacing by providing 20mm chipping carpet to the approach road to Kadakkavoor Railway Station
          Re-Construction of a bridge at Aruvikkara Chanichal kadavu across Karamana river - Site survey & soil investigation
          Re-Construction of a bridge at Chettachal Sooryakanthi across Vamanapuram river - Site survey & soil investigation
          Re-construction of Kattumurakkal bridge in Chirayinkil-Korani road : Investigation & DPR preperation works.
          Construction of a bridge at Aruvikkara Thottinkadavu Moozhy Mylam across Karamana river - Site survey,soil investigation & DPR preparation
          Re-Construction of a bridge at Keezhpalloor in Parantode Meenankal road - Site survey & soil investigation
          Re-construction of Paruthoor bridge across Mamom river : Investigation & DPR preperation works.
          Construction of Kovilkadavu bridge across Karamana river-Site survey & soil investigation works
          Re-Construction of bridge at Kallupalam in Vilavoorkal Panchayath - Site survey & soil investigation
          Urgent repairs to Neyyattinkara - Kalluvila - Kavalakulam road between Ch: 0/000 and 1/700.
          Construction of a bridge at Anappadavu in Maranallur Panchayath - Site Survey & Soil investigation.
          Re-Construction of Puthukurichi bridge across Kadinamkulam lake-Investigation & DPR preparation works.
          T No. 89 Urgent Patch works for Manjalikulam road(from Secretariat to Sreekumar Theatre)and clearing drain at Ch.0/000 to 0/800
          B/W 2011-12 Improvements to Vattakulam - Aruvikkara road by providing 40mm CC from km 0/000 to 0/670
          Urgent rectification works- Clearing the side drain and culvert in Anjengo- Muthalapozhy road from Km 0/350 to 1/200
          Improvements to Vettappullu - Methottam - Pongod road from km. 0/800 to 1/850
          T No 87 Urgent Bit Chipping Carpet works to Indira Nagar Junction to Melathumelae road Ch.0/600 to 1/000
          T No. 88 Urgent works - Providing hand rails around Gandhi Park at East Fort
          Improvements to Kudavoor - Madanthapacha road to join Thalavila junction from km 0/000 to 3/500
          Payattuvila- Puthenvila
          O/R Works 2012-13 - Urgent rectification by providing 20mm bit chipping carpet to Karichal kayal road Km 0/000 to 2/800.
          O/R 2012-13.Urgent patch repairs and other allied works at Palayam Fly Over Ch 0/000 to 0/260(night provision)
          O/R Works 2012-13 - Urgent rectification of collapsed side drain and construction of CC drain in Neyyattinkara - Poovar road Km 1/000 to 1/500.
          O/R Works 2012-13 - Urgent rectification to Eruthavoor Mukkampalamoodu Naruvamoodu road Km 0/000 to 2/700.
          O/R Works 2012-13 - Urgent rectification to Mangalathukonam - Kottukal Ela road Km 0/000 to 1/600.
          O/R Works 2012-13 - Urgent rectification by providing 20mm bit chipping carpet to Thirupurathoor - Pulluvila road Km 3/000 to 5/100
          O/R 2012-13.Urgent patch repairs by providing 20mm bit chipping carpet with seal coat to VELI-KADINAMKULAM road from km 14/700 to 17/400
          13th F C 2012.13 works. Urgent Bit chipping carpet at OORAKOTTUKONAM-KURISHADI road
          O/R 2012-13.Urgent patch repairs by providing 20mm bit chipping carpet at KARAMOODU-PALLIPURAM road from km 0/400 to 1/400
          O/R Works 2012-13 - Urgent rectification to Mylachel - Koranamcode road Km 0/000 to 3/000.
          O/R 2012-13.Urgent patch repairs by providing 20mm bit chipping carpet to KANIYAPURAM-LANDING road km1/900 to 2/300
          O/R Works 2012-13 - Urgent rectification to Amaravila - Ottasekharamangalam road Km 7/000 to 12/200.
          O/R Works 2012-13 - Urgent rectification to Pasuvannara - Aruvikkara road Km 0/000 to 2/000.
          O/R Works 2012-13 - Urgent rectification to Neyyattinkara - Marayamuttom road Km 0/000 to 2/400.
          Up 2010-11(2) Resurfesing the road from Kuravankonam Maruthoor road (Yamuna Nagar to Maruthoor)
          Up(2) Con. of side drain in Melekadakampally Mulloor road .
          Up 2010-11 Providing 20mm Chipping Carpet to 9th mile TS road to Aruvikkara road Ch.3/400 to 4/00.
          Urgent repairs and other allied works Hand Rails at Palayam Fly Over Ch 0/000 to 0/260
          13th FC 2012-13 work. Metalling the road way and avoiding the accident in Nedumkuzhi-Thinavila-Paruthanpara-Mailadi road near MAILADI.
          Urgent patch repair 20mm bit Chipping carpet to PULAYNARCOTTA-KIMS Hospital Jn.ch 0/000 to 1/500
          T-175/Dn.ordinary repairs 2012-13. Urgent rectification to Karumam Thiruvallam road ch 0/00 to 5/600 by providing 20mm bit chipping carpet.
          T-178/Dn.13th Finance commission 2012-13.providing 40mm chipping carpet inMamam Parakkavu road ch 0/00 to 0/500.
          Urgent patch repair by providing bit chipping carpet at KILLI-MANALI-MEACHERA road ch 0/000 to 3/000
          Urgent patch repair by providing bit chipping carpet at VILAPPILSALA-MALAPPANAMCODU road ch 3/000 to 4/800
          Urgent rectification works to the surface of KOLLOMKONAM-PULIYARAKONAM road km 0/000 to 1/500
          T-173/Dn.Resurfacing in Chembaka Nagar road and connecting subroad and Officers nagar road near Bakery Jn.
          T-176/dn.Ordinary repairs 2012-13.Urgent repairs of Edackkode Mookunnimala road km. 0/00 to 2/00.
          T-180/Dn. Deposit work 2012-13.JICA Assisted Kerala water Supply Project TVM.-P 111.Rectification of taarcut along Plamoodu Thekkumoodu pottakkuzhy road due to laying of pipes by KWA.
          Improvements to Mavilamukku Karunilakode Karamukku Vallakkadavu road Ch:0/00 to 1/600.
          Up 2010-11 Nettayam Vayalikkada Papad road
          Upgradation and Improvements to Alathara Kattela Kuzhivila road.
          Up 2010-11Providing 20mm CC Mundela Kulathara Road
          Up 2010-11 Providing 40mm CC to Vellayambalam Thampanoor Fly over Balance Portion
          Up 2010-11 Arattukuzhi Amboori Neyyardam Road Ch:0/00 to 1/500.
          T-172/Dn.MPLADS. Construction drainage channel along the PWD road from Elamtheng to Kalaady South in Kalady ward.
          T-174/Dn.SDF for MLAs Resurfacing the road in front of Jas hotel Thycadu ch 0/00 to 0/135 and providing cement concrete at connecting ways.
          T-179/Dn.13 th Finance commisssion 2012-13.Providing 40mm chipping carpet in Mamam Prakkavu road ch 0/500 to 0/900.
          Up 2010-11 Providing 20mm C C to Vellanadu Kannampally Mulayara Road km 0/00 to 2/200.
          Up 2010--11 Providing 20mm CC to Manvila Puthukad Akkulam road
          Up 2010-11 Providing 20 mm CC in Chemboor road Ch:5/00 to 6/00.
          13th F C 2012.13 works. Urgent Bit chipping carpet at PARAMBITHOTTAM-OORAKOTTUKONAM road
          Up 2010-11 Provaiding 40mm BM in Kulakkode Veliyanoor Mithraniketan Road Km 2/500 to 5/600.
          T-177/Dn.Ordinary repairs 2012-13.Improvements to Ammankovil Viswabharathy municipal road.
          Urgent patch repair by providing bit chipping carpet at KILLI-MANALI-MEACHERA road ch 3/000 to 4/800
          Up 2010-11 Nalanchira Kusavarakal road
          Up.Providing 40mm CC and Removing Water stagnation at Kanjirampara Colony Raod 0/500 to 1/500.
          181-D/W-Rectification of Tarcut due to laying OFC by TATA Tele Service from Thiruvallam up to Edayar Bridge.
          183-F/D 2009-10 Providing 20mmCC to Kuruvikkadu-Ettayoorkonam road.
          169 -Rectification of tar cut due to laying 11 KV UG Cable by KSEB from Passport Office - Karalkada - Kaithathamukku in Karalkada - Irumbupalam and Karalkada -Subhash Nagar road.
          172-D/w Rectification of tarcut due to laying UG Cable buy KSEB for Keston rise appartment at Keston road - Devaswamboard Jn.
          177-D/W-Rectification of tarcut due to laying pipe by KWA along women's college -Vazhuthacaud - Bakeryroad and Ammenkovil -DPI road.
          Up 2010-11 Providing 20mm CC of Muttada Anchumukku Convent Road
          Up 2010-11 of Moonnamoodu Aruvikonam Road
          167-SDF for MLA 2010-11 Tvpm north LAC-Retarring to the Vazhavilakam - Chathanthara road in Vattiyoorkavu block.
          170 -Rectification of tar cut due to laying 11 KV Cable by KSEB for PRS Shangrila apprtment along Kunnumpuram road.
          171-Rectification of tarcut due to laying 250mm SW Pipe by KWA from Parachira jn. to Rajiv Gandi Bio Technology in Melarannoor road.
          184-Construction of cross culvert and side drain in Kuravankonam - Vayalikkada road.
          165 - SDF for MLA 2010-11 TVPM West LAC-for rectification of drain and raising the road surface near Perunelly Jn. in Karalkada -Subhash Nagar - Eanchakkal - Poonthura road.
          Up 2010-11 of Kudappanakkunnu Marygiri HArvipuram Road .
          166 - SDF for MLA - 10-11 Tvm West LAC-Mettalling and tarring of bit roads near Perunelly Jn. and Ponnara bridge in Muttathara Ward.
          182-D/W rectification of tarcut due to laying UGC by KSEB along Ayurveda college- Chettikulangara road and Pulimoodu - Uppidamoodu road.
          168-SDF for MLA 2010 11 Tvpm North LAC- Mettalling and Tarring to the Irikkunnam Mudippura road in Vattiyoorkavu block.
          173-D/w rectification iof Tar cut due to laying OF Cable along Mannanthala - Peroorkada road by Idea Cellular Ltd.
          174- D/w urgent rectification of tarcut due to laying OFC along Peroorkada - Sasthamangalam road by TATA Tele service
          T No 70 D/W-Rectification of tar cut due to laying OFC Cable laying by Vodafone at Jagathy - Kannettumukku road.
          T No 86 MLA's SDF 2012-13, Concreting of Thattarruparabu-Devi Temple Road in VP Thampi Road,Kudappanakunnu
          T-171/Dn. Construction of side drain at km. 29/00 in Thiruvananthapuram Ponmudi road under Roads section Nedumangadu.
          T No.75 --Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter at Aurveda College.
          T No 78 Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter at Manacaud High School Jn.
          T No 81 Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter at opposite side of Palayam Church.
          T No 84 Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter at wireless Jn. (G.V.Raja)
          T No.62 D/W-Rectification of tar cut for laying Pipe for Water connection by K.W.A in various roads under City Roads Section No.1, TVPM for the period from 1/2/2012 to 31/3/2012.
          T No.66 D/W-Rectification of tar cut due to providing water Supply House connection by K.W.A in various roads under City Roads Section No.3, TVPM for the period from 1/1/2012 to 31/1/2012.
          T No.69 D/W-Rectification of tar cut due to laying 11KV Under Ground Cable by KSEB at Vattiyoorkavu junction - Kuravankonam - YMR road and Nanthencode-Plamoodu road under City Roads Section No.3, TVPM
          T No.64 D/W-Rectification Works due to laying of Pipe line for domestic purpose by Kerala Water Authority during the period 1/1/2012 to 31/3/2012 under City Roads Section No.II, TVPM.
          T No.63 D/W-Rectification Works due toproviding Water Supply connection by Kerala Water Authority in various road under City Roads Section No.II, TVPM during the period from 1/11/11 to 31/12/11..
          T No.72 D/W-Rectification works due to laying 11KV Under Ground Cable by KSEB at Spencer - Punnen road.
          T-162/Dn.13 th Finance commission works 2012-13. Construcion of side drain at Andoorkonam Jn. in Vembayam Pallippuram road .
          T No 82 Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter in front of A.G's Office.
          T No.65 D/W-Rectification of tar cut due to providing Water Supply house connection by K.W.A in various roads under City Roads Section No.3, TVPM for the period from 1/11/2011 to 31/12/2011.
          T No.67 D/W-Rectification of tar cut due to providing Water Supply house connection by K.W.A in various roads under City Roads Section No.3, TVPM for the period from 1/2/2012 to 31/3/2012.
          T No.68 D/W-Rectification of tar cut due to laying K.W.A Pipe for Heera Flat from Vellayamblam - Manaveeyam road to Althara Nagar road.
          T No.71 D/W-Rectification of tar cut for laying 11KV U.G.Cable for KSEB in Pettah - Enchakkal Road.
          T No.73 D/W-Rectification works due to laying 11KV Under Ground Cable by KSEB at Spencer - Punnen road.
          T-163/Dn.Upgradation of the carriageway by providing 20mm chipping carpet to Vembayam Pallippuram road km. 6/800 to 9/00 and 11/800 to 12/800.
          T-170/Dn. Construction of culvert and leading drain at km 28/700 in Thiruvananthapuram Ponmudi road under Roads section Nedumangadu.
          T No 77 Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter at All saints College Jn.
          176- D/W Rectification of tarcut due to laying PVC Pipe line by KWA along YMR JN to Kuravankonam Jn. for HeeraCresent
          179-D/W Rectification of tar cut due to laying OFC by TATA tele service in Valiyasala - jagathy - Kannettumukku road
          T-164/Dn. Upgradation of carriageway by providing 40mm chipping carpet in Arasummoodu kuzhivila Elanthivila road km 0/00 to 2/00.
          T No 76 Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter at Chakkai Jn.
          T-167/Dn.13th Finance commission 2012-13. Providing 20mm chipping carpet to karichira kayalkadvu road km 0/00 to 1/200.
          T No 79 Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter at Xanadu Jn.
          T No 85 Special Development Fund for MLA's SDF 2012-13-Thiruvananthapuram Providing 20mm Chipping Carpet to the Journalist Colony road in N.C.C Nagar - Kudappanakunnu road.
          175-D/W-Rectification of tarcut due to laying pipe line by KWA along Sasthamangalam - Pipinmoodu road.
          178- D/W Rectification of tar cut due to laying OFc by Kerala communication in oottukuzhi - Housing board road.
          180-D/w Rectification of tarcut due to laying OFC by TATA Tele service along Vettimuricha kotta - rajadhani road.
          T No 74 D/W-Rectification of tar cut due to laying APDRP - H.T Cable maintenance from Model School juncton to Thycaud-Panavila Sastham Coil in Amman Coil - Keezhe Thampanoor road.
          Up 2010-11 Of Koothali Pannimala Road Ch 0/700 to 1/800.
          Up 2010-11 Providing 20mm CC to Muthiyavila Ottasehjaramangalam road Ch: 5/00 to 7/320.
          T-165/Dn. Upgradation of carriageway by providing 20mm chipping carpet to Veli - Kadinamkulam road from Perumathura to Pozhikkara.
          T-169/Dn.Renewal programme.2012-13. Providing 40mm chippiing carpet to Surya road from km 0/00 to 0/300 in Nedumangadu town.
          T No 80 Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter in front of Sabhalyam Complex.
          T No 83 Special Development Fund for MLA's SDF 2011-12-Thiruvananthapuram L.A Constitency Construction of Bus shelter in front of Secretariat.
          Up 2010-11 Improvements to Peringammala Kattackal Iqbal College road from Km.0/00 to 2/600.
          T No 61 D/W-Rectification of tar cut for laying Pipe for Water connection by K.W.A in various roads under City Roads Section No.1, TVPM for the period from 1/1/2011 to 31/1/2012.
          Urgent Rectification works to Aryanad-Palode Road between Km 0/700 to 0/800
          Up 2010-11 by Providing 20mm CC to Vilayilmoola Theepettimukku Jn. road from Km 0/00 to 1/500.
          Urgent patch repair works to Thekkada Seemavila road 2/000 to 3/800
          Urgent patch repair works to Muthuvila Aruvippuram Chullalam road 0/00 to 1/800
          Urgent patch repair works to Muthuvila Aruvippuram Chullalam road 1/800 to 3/600
          Urgent patch repair to Muthuvila Aruvippuram Chullalam road 3/600 to 5/600
          Urgent patch repair works to hevanpara Thekkummoodu Pachamala-Poriyakkadu road from KM 1/100 to 2/200
          Urgent patch repair works to Thekkada Seemavila road 3/800 to 5/800
          Up 2010-11 of Uchakada Cicilipuram road between Ch: 0/00 to 1/700.
          Up 2010-11 of Kachani Kallingavila Road.
          Up 2010-11 to Providing 20mm Chipping Carpet to Attuvarambu Kadakompally road
          Up 2010-11 of Vandithadam Palappur road Ch: 0/00 to 2/200.
          Up 2010 -11 of Choozhampala Pathirappally Kizhakkubhagam Ambalanada Road.
          Up 2010-11 by providing 20mm CC to Vattappankadu Alumkuzhi Elavattam Road.
          Up 2010-11 Improvements to Parappil Chevalam road from Ch: 0/00 to 1/700.
          Up 2010-11 by providing 20mm CC inAnathalavattom Kochupalam Nilakkamukku road in Km. 0/00 to 2/250.
          Up 2010-11 By Providing 20mm CC to Vakkom Market Meerankadavu road from Km 0/00 to 2/600.
          Up 2010-11 Improvements to Kallara Adappupara road from Ch: 5/00 to 6/500.
          Up 2010-11 Improvements to Parasuvaikal Goat from road 1/200 to 3/200.
          Up 2010-11 Improvements to Parasuvaikal Manivila Road Ch 1/200 to 3/200
          Up 2010-11 of Nellimoodu Marappalam Road Ch 0/00 to 3/280.
          Up 2010-11 Improvements to Manjadimoodu Kolichira Muttapalam road Ch 0/00 to 2/350.
          Urgent patch repairs toThevanpara Thekkummoodu Pachamala-Poriyakkadu road from KM 0/000 to 1/000
          Urgent patch repairs to Irumba Kachani road from KM 1/400 to 2/700
          Providing 20mm chipping carpet to Kazhanad(Vattappara Nedumangad road) from KM 0/000 to 0/150
          Urgent patch repairs to Muthuvila Parappil road 1/100 to 2/200
          Urgent Patch Repaires to Muthiyavila - Ottasekharamangalam Road from km 3/000 to 5/200
          Urgent patch repairs to Vamanapuram Kalamachal road from KM 0/000 to 3/800
          Urgent patch repairs to Vilabhagom road from Ch 2/000 to 4/000
          Up 2010-11 Improvements to Parassala Railway Station Road Ch 0/00 0/500.
          MLA SDF Con. of drain and Raising the road Surrface to avoid water stagnation from puthenpally in Eachakkal SM lock Road.
          MLA SDF Providing 20mm CC Bhagath Singh Road in Connection with Kannamoola Medical College to Anayara Road.
          MLA SDF Providing 20mm CC to Cheekode Kavuvila Road in Back of Kannamoola Medical College .
          MLA SDF Raising the road Surface to avoid water stagnation from Chithra Nager in Perumthanni ward.
          D/W JBIC Urgent restoration work due to laying of pipeline by KWA under JBIC in Kariyam Pothencode Road km 0/00 to 2/250.
          S/R 09-10 Con. of Retaining wall and Irish drain in Varkala Vettoor Nedungadam Road Ch:0/00 to 5/400.
          F/D Construction of Side drain Km 3/00 to 4/00 in Nedumangad Aruvikara Road.
          Improvements to Kalluvila Road in Varkala Municipality
          MLA SDF Improvements to Cherukunnam Palli Road in Varkala Municipality.
          MLA SDF Resurfacing to the Swathy Nager Ist street 3A & 3 Street in Peroorkada Sasthamangalam road in Kudappanakkunnu Block.
          D/W Due to Laying of GI pipe in PWD road from Choozhattukottah Jn. to Malayam Jn. 20mm Chipping Carpet and side portion Work.
          Urgrnt patch repairs to Vellanad Road Km 7/200 to 8/500
          D/W Bit Chipping Carpet and widening perukavu Choozhattukottah road from Ch: 0/00 to 1/400.
          R/P.Improvements to Vamanapuram-Kuttara-Panthaplavikonam-Melekuttumoodu road .
          T-161/Dn. MLA 's SDF Vattiyoorkavu constituency. Providing 20mm chipping carpet to Journalist colony road in NCC Nagar, Kudappanakkunnu road.
          T-159/Dn.Renewal programme 2011-12.Improvements to Paivelikonam Edamanvila road ch 0/00 to 0/750.
          T-158/Dn.Renewal Programme. 2011-12.Improvements to 28th Mile Paivelikonam road ch 0/00 to 0/650 with widening and providing 40mm chipping carpet.
          T-160/Dn.Renewal programme.2011-12. improvements to Edamanvila Punnode road km. 0/00 to 0/750.
          T-156/Dn.Ordinary repairs 2012-13. Reconstruction of culvert at ch 0/130km in Pallichalthodu Mavarathala Pakaloor road.
          O/R works 2012-13 - Urgent rectification to Mylachel - Koranamcode road between Km 0/000 to 3/000.
          O/R works 2012-13 - Urgent rectification works to Edakkode - Mookkunnimala road between Km 0/000 to 2/000.
          O/R works 2012-13 - Urgent rectification works to Eruthavoor - Mukkampalamoodu - Naruvamoodu road between Km 0/000 to 2/700.
          T-157/Dn. Construction of sie drain and retaining wall between km 3/00 to 4/00in Kaduvanadu Paluvally road.
          O/R works 2012-13 - Urgent rectification works with 20mm bit C.C to Thirupurathoor - Pulluvila road between Km 3/000 to 5/100.
          O/R works 2012-13 - Urgent rectification works to Punnamoodu - Vedivachancoil road between Km 0/000 to 0/725.
          O/R works 2012-13 - Urgent rectification works with 20mm bit C.C to Karichalkayal road Km 0/000 to 2/800.
          O/R works 2012-13 - Urgent rectification works to Mangalathukonam - Kottukal Ela road at Ch: 0/000 to 1/600.
          Vengavila Vettampally road - Upgradation from km.0/000 to 5/000.
          O/R works 2012-13 - Improvements to Passuvannara - Aruvikkara road Km 0/000 to 2/000.
          O/R works 2012-13 - Urgent rectification works to Neyyattinkara - Marayamuttom road Km 0/000 to 2/400.
          O/R works 2012-13 - Construction of C.C drain in Neyyattinkara - Poovar road between Ch: 1/000 to 1/500.
          O/R works 2012-13 - Improvements to Amaravila - Ottasekharamangalam road between Km 7/000 to 12/200.
          R/P Providing 20mm Chipping Carpet to Kudavanad Paluvally Chellanchi road from km.0/000 to 4/500
          T No.1 D/W Rec tification of tar cut due to laying 33 KV U/G Cable by KSEB along Poojappura loop road.
          Rectification of tar cutting of 33 KV UG Cable laying from Thirumala Karamana Sub station - Mudavanmugal to Poojappura Jn.
          Construction of a bridge at Panchikkattukadavu across Neyyar river - Peg marking for Land Acquisition.
          Re-construction of Moothala bridge in Chadayamangalam-Pallikkal road : Investigation & DPR preperation works.
          Reconstruction of Valicode bridge in Nedumangad Constituency-Site survey & soil investigation
          Re-construction of Ponnara bridge(Perunelli) across T S canal-Peg marking for L.A
          1.Premonsoon works 11-12 Urgent pot hole filling,drain clearing and jungle clearance to Varkala-Kallampalam road km:0/00 to 4/00
          Karkkidakavavu bali 2012- Urgent Jungle clearance, side drain clearing, earth work excavation in Janardhanapuram-Mundayil Govt.H.S.Roads
          Karkkidakavavu bali 2012- Urgent Jungle clearance and drain clearance to Guest House-Punnamoodu Road Ch. 0/00 to 3/200Km
          Karkkidakavavu bali 2012- Urgent patch repairs to Old Varkala-Parippally road (Railway Station Road) at Ch.0/00 to 1/200 Km.
          Karkkidakavavu bali 2012- Urgent works to Vilabhagom road at Ch. 0/00 to 4/400 Km.
          Karkkidakavavu bali 2012- Urgent Jungle clearance, side drain clearing, earth work excavation in Varkala-Kallambalam ch. 0/00 to 3/00
          Karkkidakavavu bali 2012- Urgent works to Vettoor-Nedunganda road at ch. 0/00 to 2/600 Km.
          Karkkidakavavu bali 2012- Urgent painting works to Varkala Mythanam and Under passage
          Karkkidakavavu bali 2012- Urgent Jungle clearance, side drain clearing, earth work excavation in Kilithattumukku - Papanasam road
          Rehabilitation of the damaged parapets and replacing the damaged foot path slabs of Irappupalam in Chirayinkeezhu-Kaniyapuram road
          Widening the carriage way and Improvements to Vilavoorkal - Pidaram road (for BM & BC)
          Repairs to protection wall between Ch 0/050 to 0/150 of Nagaroor- Karette road
          Karkkidakavavu bali 2012- Urgent Jungle clearance, side drain clearing, earth work excavation in Venkulam road 0/000 to 4/000
          Avoiding water stagnation and drain work at Panappamkunnu Junction in Thumbode-Kaithode road
          Construction of Irish drain in Manamboor-Kavalayoor-Kulamuttom road Ch.0/00 to 7/200 Km
          S/R Construction of retaining wall in Karumam Thiruvallam Road at accident prone location near Nelliyode junction ch 3/400 to 3/500.
          T-150/Dn.13 th Finance Commission 2012-13.Providing 20mm BC to Kilimanoor Alamcode road km. 4/300 to 4/800.
          Improvements to Chembara –Panayamoola road.
          Improvements to Kallara - Adappupara road from km 5/00 to 6/500
          R/P- Providing 20mm Chipping Carpet to Anad Branch road from km.0/000 to 5/250
          Premonsoon work 2012 - Clearing chockedup side drain and rectification works to damaged side drain in Thirupurathoor - Pulluvila road at Ch: 2/000 to 2/700
          O/R works 2012-13 - Patch repairs to Chemboor road between Ch: 2/000 to 5/000.
          O/R works 2012-13 - Patch repairs to Chemboor road between Ch: 6/000 to 7/500.
          O/R works 2012-13 - Urgent rectification works to Parassurama Temple road at Thiruvallam.
          T-155/Dn. Conveyance of packed bitumen emulsion from Bharath petroleum Corporation Ltd Ambalamughal to Roads Division Compound TVM for 2012-13.
          T-148/Dn. 13 th Finance commission 2012-13. M&R MDR Construction of cement concrete drain in Amaravila karakonam road km. 0/00 to 1/00.
          T-153/Dn.Conveyance of bulk bitumen in Tanker lorries from Bharath petroleum Corporation Ltd Ambalamughal to various work ite under Roads Subdivision nedumangadu.
          T No 5 Pre-monsoon 2011 - Rectification of excisting damaged drain and providing covering slabs in front of Ujjayini Ammen kovil in pulimoodu housing board road ( Press road ) at Ch.0/100 to 1/132
          T No 14 Pre-monsoon 2011 - Clearing chocked up side drain to the road from Spencer Jn to Vazhuthakkadu road at Ch 0/000 to 1/200
          T-149/Dn.13 th Finance commission 2012-13. M&R MDR Constructio of Cement concrete drain in Amaravila karakonam road km. 6/00 to 7/00.
          T No 17 Pre-monsoon 2011 - Clearing side drain to the Manjalikkulam road at Ch 0/000 to 0/750 0 to 5/000
          Pre -Mansoon works :-Clearing chocked up drain and culverts in Aryanad Pezhumoode road for KM 0/000 to 3/000
          T-154/Dn. Conveyance of bulk bitumen in tanker lorries from bharath petroleum Corporation ltd Ambalamughal to variou work site under various work site under Roads Subdivision neyyattinkara.
          T No 2 Pre-monsoon 2011 - Clearing chocked up side drain in Karalkada - Subhash Nagar road and Eanchakkal - Poonthura road. at ch 0/000 to 5/200
          T No 8 Pre-monsoon 2011 - Clearing chocked up side drain in Eanchakkal - Kanjiravilakom road at Ch.0/000 to 1/200 . al
          Pre-Mansoon works :-Clearing chocked up drain and culverts inCharumoodu Nallikkuzhy -Paruthikkuzhy road from KM 0/000 to 4/000
          T No 23 Pre-monsoon 2011 - Clearing chocked up side drain at Karamana - Kalady (Via) Soman Nagar road at Ch 0/000 to 1/780
          T-152/Dn.upgradation .Providing 40mm chipping carpet to Pirappancode Pothencode road from km 0/00 to 1/00.
          T-139/Dn Renewal programme 2012-13. resurfacing of mavarathala Pakaloor kalliyoor road bet ch 0/310 and 0/850km.
          T-143/dn. 13 th finance commission 2012-13. Urgent maintenance to poojappura Mudavanmugal road km 0/00 to 1/00(from Poojappura to Unni Nagar.)
          T No 20 Pre-monsoon 2011 - Clearing chocked up side drain at Ariyasala road at ch 0/000 to 0/350
          T-145/Dn 13 th Finance commission 2012-13. Upgradation work by providing 40mm chipping carpet in Nilakkamukku kaniyankudy- Anathalavatttom road ch 0/00 to 0/600.
          TNo.7 Pre- monsoon 2011- Clearing chocked up side drain at Poonthura - Cheriyamuttam Ch 0/000 to 1/000
          T No 28 Pre-monsoon 2011 - Clearing chocked up side drain to the road from Thirumala - Mangattukadavu road at Ch 0/000 to 1/500
          T No 30 Pre-monsoon 2011 - Clearing chocked up side drain to the road from Vazhuthakkadu to Thirumala at Ch 0/000 to 4/500
          T No 36 Pre-monsoon 2011 - Clearing chocked up side drain of road from Nanthancode Jn. - Cliff House south approach road at Ch. 0/000 to 0/500
          TNo.13 Pre- monsoon 2011- Clearing chocked up side drain to the road from Forest office Jn. to bakery Jn. at Ch 0/000 to 2/000
          T-138/Dn. Supplying of shelmac. P.R to Roads Division TVM. up to 31.3.2013.
          T-147/12./Dn. 13 th Finance commission 2012-13. Providing 40mm chipping carpet to Arayoor CVR puram road km 0/00 to 1/200.
          T-146/Dn.13 th Finance Commission 2012-13. Construction of culvert and drain at Paraniyam jn. in Balaramapuram Poovar road.
          T-151/Dn. SDF For MLA. Nemom LA Constituency. Construction of Sarada garden road ch. 0/00 and 0/165, Arathy road ch 0/00 to 0/135,kunthalam Pulluvilalane road ch 0/00 to 0/240 in nemom Dn, in TVM Corp
          T-141/Dn.Construction of kaniyapuram bridge across Neyyar river in neyyattinkara Constituency, site survey and soil investigation works.
          T No 11 Pre-monsoon 2011 - Clearing chocked up side drain from Cotton hill to Kundamonkadavu road at Ch 0/500 to 5/000
          T No 21 Pre-monsoon 2011 - Clearing chocked up side drain of Service road (New theatre road ) at Ch 0/000 to 1/525 at Ch 0/500 to 5/000
          16.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Oonninmoodu-Kadampattukonam road from km:2/500 to 7/130
          TNo.3 Pre- monsoon 2011- Clearing chocked up side drain in Padinjare kottah - Kanjiravilakom road at Ch. 0/000 to 1/850
          T No 4 Pre-monsoon 2011 Clearing chocked up side drain at road in side Fort at Ch 0/000 to 2/937
          T No 9 Pre-monsoon 2011 - Clearing chocked up side drainat Statue - Chirakkulam - Uppidamoodu road At Ch. 0/000 to 1/000
          T No 15 Pre-monsoon 2011 - Clearing chocked up side drain around residency road at Ch.0/000 to 1/000
          Pre Mansoon works :- Clearing chocked up drain and culvert inThiruvananthapuram Neyyardam road form KM 16/800 to 19/000tro 26/000
          Pre-Mansoon works :-Clearing chocked up drain and culverts in Thiruvananthapuram Neyyardam road 23/000 tro 26/000
          T-142/Dn. 13 th Finance commission work 2012-13. urgent maintenance to the road from Ambalathara to Poonthura ch 1/500 to 1/950.
          T-144/Dn.13 th Finance commission 2012-13 Upgradation work by providing 40mm chipping carpet in nilakkamukku kaniyankulam Anathalavottom road ch 0/6000 to 1/200.
          10.Premonsoon works 11-12 urgent drain clearing,and jungle clearance to Cherunniyoorkadavu -Nadayara road from km:1/200 to 7/200
          T No 35 Pre-monsoon 2011 - Urgent patch repairs to Maruthankuzhy - Kachani road at Ch. 0/000 to 0/800
          T No 18 Pre-monsoon 2011 - Clearing chocked up side drain from Sreekumar Jn. to Nanthavanam and Museum, RMS to Oottukuzhi and Gorky bhavan to bakery fly over road at Ch 0/000 to 1/400
          3.Premonsoon works 11-12 urgent pot hole filling,drain clearing and jungle clearance to Varkala-Parippally road from km 0/00 to 2/00
          7.Premonsoon works 11-12 urgent pot hole filling,drain clearing and jungle clearance to Njekkad-Chavercode road from km:0/00 to 2/00
          T No 16 Pre-monsoon 2011 - Clearing chocked up side drain from Thycaud huose to Keezhe thampano r road at ch,0/000 to 1/0000 r road at Ch.0/000 to 1/000
          T No 19 Pre-monsoon 2011 - Clearing chocked up side drainof Karamana - Thaliyal road at ch. 0/000 to 1/600 t Ch 0/500 to 5/000
          Pre-Mansoon works :-Clearing chocked up culverts and side drain in Thiruvananthapuram Neyyardam road from KM 19/000 to 22/000
          T No 26 Pre-monsoon 2011 - Clearing chocked up side drain and berm removal of Attakulangara - Killippalam road (Left side) at ch 0/000 to 0/100
          T No 10 Pre-monsoon 2011 - Clearing chocked up side drain in Thampanoor - Flyover - Vellayambalam road at Ch.0/000 to 4/000
          T No 12 Pre-monsoon 2011 - Clearing chocked up side drain to the road from Pulimoodu to Residendy at Ch 0/000 to1/000
          T No 22 Pre-monsoon 2011 - Clearing chocked up side drain of CIT road at Ch 0/000 to 1/240
          4.Premonsoon works 11-12 urgent pot hole filling,drain clearing and jungle clearance to Varkala-Parippally road from km: 2/00 to 11/600
          T No 29 Pre-monsoon 2011 - Clearing chocked up side drain of Muidavanmugal road at ch 0/000 to 2/000
          T No 34 Pre-monsoon 2011 - Urgent patch repairs to the road from Peroorkada - Oolampara in Peroorkada - Sasthamangalam road at Ch. 0/000 to 1/500
          T No 24 Pre-monsoon 2011 - Clearing chocked up side drain at Kalyan Hospital - Therakam road at Ch 0/000 to1/150
          T No 27 Pre-monsoon 2011 - Clearing chocked up side drain from Thirumala Trikkannapuram road at Ch.0/000 to 3/300
          6.Premonsoon works 11-12 urgent pot hole filling,drain clearing and jungle clearance to Attingal-Delavapuram road from km:2/800 to 8/600
          T No 25 Pre-monsoon 2011 - Clearing chocked up side drain and berm removal of Attakulangara - Killippalam road (Right side) at ch 0/000 to 0/150
          T No 32 Pre-monsoon 2011 - Urgent patch repairs from Thirumala -Thrikkannapuram road at Ch 1/800 to 3/300
          T No 33 Pre-monsoon 2011 - Urgent patch repairs to NCC road at Ch 0/050 to 1/550
          T No 101 Pre-monsoon 2011 - Providing traffic sign boards and easing the curve of road from Uppidamoodu Railway over bridge to Administrative tribunal Office At Ch 0/000 to 0/100.
          8.Premonsoon works 11-12 urgent pot hole filling, drain clearing and jungle clearance to Njekkad-Chavercode road from km: 2/00 to4/640
          11.Premonsoon works11-12 urgent drain clearance and jungle clearance to Ayiroor-Reghunathapuram road from km:0/00 to 4/520
          15.Premonsoonworks 11-12 urgent drain clearance and jungle clearance to Velliyazhchakavu road from km:0/00 to 0/800
          T No 31 Pre-monsoon 2011 - Urgent patch repairs to the road from Edapazhinji to Killippalam (Kochar Road) at Ch.0/000 to 1/ 100
          9.Premonsoon works 11-12 urgent drain clearing and jungle clearance to Bhajanamadom road from km: 0/00 to 1/00
          Urgent Patch Repair to Thiruvanathapuram Shencotta Road km 9/500 to 11/000
          urgent patch repairs to Thiruvanathapuram Shencotta Road km11/500 to 13/00
          urgent patch repairs to Thiruvanathapuram Shencotta Road km 17/600 to 19/00
          Clearing chocked up culvert and drain in Nedumangad Shorlacode Road km 9/00 to 10/00
          urgent patch repairs to Thiruvanathapuram Shencotta Road km 13/600 to 15/00
          urgent patch repairs toThiruvanathapuram Shencotta Road km 15/500 to 17/100
          Clearing chocked up culvert and drain in Nedumangad Shorlacode 0/00 to 2/00
          Clearing chocked up culvert and drain in Nedumangad Shorlacode 6/400 to 8/00
          Urgent Patch Repairs to Nedumangad Shorlacode Road km 0/00 to 0/700
          urgent patch repairs to Vellanad Road Km 4/650 to 5/100
          urgent patch repaire to Enikkara kallayam km 2/00 to 4/00
          clearing chocked up culvert and drain in Nedumangad Shorlacode km 11/00 to 14/00
          23.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Narikkal-Vattaplamoodu road from km: 0/00 to 1/200
          24.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Puthenchanda-Chilakkoor road from km:0/00 to 1/200
          26.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Varkala-Edava road from km: 0/00 to 5/00
          28.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Papanasam road from km: 0/00 to 0/600
          Improvements to Pathamkallu - Machannoor - Aravalakunnu - Prasanth nagar road (Retender).
          B/W 2011-12- Improvements to Azhoor-Perumathura road ch. 0/000 to 2/600 KM
          Construction of drain and footpath at Manacaud-Valiathura Road from ch.0/650 km to 1/000 km
          clearing chocked up culvert and drain in Nedumangad Shorlacode Road km 2/00 to 3/800
          29.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Venkulam-Kappil roar from km: 0/00 to 3/500
          27.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Edava-Kappil road from km: 0/00 to 2/00
          clearing chocked up culvert and drain in Nedumangad Shorlacode at kuttichal jn.
          clearing chocked up culvert and drain in Muthiyavila - Ottasekharamangalam Road km 0/00 to 2/500
          clearing chocked up culvert and side drain in Muthiyavila - Ottasekharamangalam Roadkm 2/500 to 5/200
          clearing chocked up culvert and side drain in Kattakkada-Kottoor roadkm1/00 to 3/00
          T No 37 Pre-monsoon 2011 - Clearing chocked up side drain of Cliff House road at Ch 0/000 to 1/000
          T No 39 Pre-monsoon 2011 - Clearing chocked up side drain of Pattam Kawdiar Loop road and Kuravankonam loop road at Ch 0/000 to 0/400
          T No 40 Pre-monsoon 2011 - Clearing chocked up side drain of Kuravankonam - Maruthoor road at Ch.0/000 to 1/500
          T No 38 Pre-monsoon 2011 - Clearing chocked up side drain of Upper merdian road at Ch 0/000 to 1/250
          T No 45 Pre-monsoon 2011 - Clearing chocked up side drain of Peroorkada - Vattiyoorkavu road up to Mannarakonam at Ch 0/000 to 3/000
          T No 65 Pre-monsoon 2011 - Clearing chocked up side drain of Peroorkada - Manikanteswaram - Nettayam road at Ch 0/000 to 3/300
          T No 49 Pre-monsoon 2011 - Clearing chocked up side drain of Peroorkada - Mannanthala at Ch 1/000 to 2/500
          T-134/Dn.RENEWAL PROGRAMME . Providing 40mm chipping carpet to kannammoola pattam road ch 0/00 to 1/00 km.
          T No 53 Pre-monsoon 2011 - Clearing chocked up side drain of Maruthankuzhy -Edapazhinji ( Kochar road) at Ch 0/500 to 1/200
          T No 57 Pre-monsoon 2011 - Clearing chocked up side drain ofNettayam - Manalayam-Moonnammodu road( MLA road) at Ch 0/000 to 3/000
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Kaniapuram Landing Road from Km 0/000 to 1/500
          T No 44 Pre-monsoon 2011 - Clearing chocked up side drain of Vattiyoorkavu - Vellaikkadavu road at Ch 0/000 to 3/200
          Road signs and markings to Navaikulam- Pallickal road from Km 3/000 to 5/800
          T No 41 Pre-monsoon 2011 - Clearing chocked up side drain of NCC road at Ch 0/050 to 1/550
          T No 43 Pre-monsoon 2011 - Clearing chocked up side drain of Golflinks road at Ch 0/000 to 1/400
          T No 47 Pre-monsoon 2011 - Clearing chocked up side drain of Maruthankuzhy - Kachani road at Ch 1/200 to 2/500
          T No 42 Pre-monsoon 2011 - Clearing chocked up side drain of Peroorkada - Sasthamangalam road at Ch 0/300 to 3/200
          T No 51 Pre-monsoon 2011 - Clearing chocked up side drain of PMG - TTC road at Ch 0/000 to 0/800
          T No 52 Pre-monsoon 2011 - Clearing chocked up side drain of PMG - TTC road at Ch 0/800 to 1/800
          T No 58 Pre-monsoon 2011 - Clearing chocked up side drain of Moolathalakkal - Madathil nada road (MLA road) at Ch 0/000 to 1/350
          45.Premonsoon works 11-12 clearing of side drain and culvert in Alamcode-Meerankadavu road in km:4/00 to 9/00
          T-127/Dn. 13 th finance commission 2012-13. providing 25mm BC to kilimanoor alamcode road km 4/800 to 5/800.
          T-129/Dn. 13 th Finance commission 2012-13. Providing 25mm BC to Kilimanoor Alamcode road km 6/800 to 7/800.
          T-132/Dn. 13 th FINANCE COMMISSION 2012-13. Providing 25mm BC to Kilimanoor Alamcode road km. 9/800 to 10/800.
          T-128/Dn. 13 th finance commission 2012-13. providing 25mm BC to Kilimanoor aalamcode road km 5/800 to 6/800.
          T-135/Dn.RENEWAL PROGRAMME. Providing 40mm chipping carpet to Kannamoola Pattom road ch1/00 to 2/00.
          T No 46 Pre-monsoon 2011 - Clearing chocked up side drain of Maruthankuzhy - Kachani road at Ch.0/000 to 1/200
          T No 56 Pre-monsoon 2011 - Clearing chocked up side drain of Museum - Nanthancode road at Ch 0/000 to0/500
          Pre-monsoon works-Urgent Side drain Cleaning- Anthiyorkonam-Thachottukavu Ch.2/000 to 3/500 km.
          Pre-monsoon works-Urgent Side drain Cleaning- Anthiyoorkonam Jn
          Urgent patch repairs to Ariyittakunnu- Kallukkadavu road from Km 0/000 to 0/600
          T No 54 Pre-monsoon 2011 - Clearing chocked up side drain of T.K.Divakaran road at Ch 0/000 to1/100
          T No 55 Pre-monsoon 2011 - Clearing chocked up side drain of road from YMR - Kuravankonam road (Nagarukavu road) at Ch 0/000 to 0/500
          T No 69 Pre-monsoon 2011 - Urgent patch repairs to Vettamukku - Pallimukk road at Ch. 0/000 to 0/900
          T- 130/Dn. Providing 25mm BC to Kilimanoor ALAMCODE ROAD KM 7/800 to 8/800.
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Ambalam Vengode Road from Km 0/000 to 3/500
          Clearing existing side drains, removing elevated berms etc in Kariyam Pothencode Road from Km 0/100 to 4/900
          Pre-monsoon works-Urgent Side drain Cleaning- Malayinkil-Oorutambalam road ch.0/000 to 1/500 km
          t-131/dn. 13 th Finance commission 2012-13. Providing BC to Kilimanoor road km. 8/800 to 9/800.
          T No 48 Pre-monsoon 2011 - Clearing chocked up drain of Peroorkada to Mannanthala road at Ch 0/000 to 1/000
          T No 59 Pre-monsoon 2011 - Clearing chocked up side drain of Pangodu - Maruthankuzhy road at Ch 0/000 to 1/280
          T No 61 Pre-monsoon 2011 - Clearing chocked up side drain of Kundamonkadavu - Vattiyoorkavu road at Ch 0/000 to 2/000
          T No 63 Pre-monsoon 2011 - Clearing chocked up side drain of Plamoodu - Marappalam - Loop road at Ch 0/000 to 0/400
          :- Pre-monsoon works-Urgent Side drain Cleaning- Anthiyorkonam-Thachottukavu Ch.3/500 to 4/500 km.
          T No 50 Pre-monsoon 2011 - Clearing chocked up side drain of Krishnanagar road at Ch 0/000 to 2/210
          clearing chocked uo culvert and drain inThiruvanathapuram Shencotta Road km 19/00 to 21/00
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Ambalam Paichira Road from Km 0/000 to 3/500
          Clearing chocked up culvert and drain in Thiruvanathapuram Shencotta Road km 18/00 to 19/00
          41.Premonsoon works 11-12 clearing of side drain and culvert in Venjaramoodu-Attingal road from km: 0/00 to6/00
          T No 62 Pre-monsoon 2011 - Clearing chocked up side drain of Vazhayila Kizhakkemukkola road at Ch 0/000 to 2/000
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Pothencode Murukkumpuzha Road from Km 6/500 to 9/500
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Kariyam Pothencode Road from Km 5/300 to 9/500
          Pre-monsoon works-Urgent Side drain Cleaning- Ooruttambalam Junction approaches
          37.Premonsoon works 11-12 avoiding waterstagnation in Old Parippally road from km:0/00 to 2/00
          T No 64 Pre-monsoon 2011 - Clearing chocked up side drain of Plamoodu -Charachira -YMR road at Ch 0/000 to 1/200
          T No 68 Pre-monsoon 2011 - Urgent patch repairs to Maruthankuzhy - Edapazhinjii road ( Kochar road) at Ch. 0/500 to 1/2000
          Resurfacing by providing 20mm cc to Nadayara Bridge approach road
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Padijattumukku Puthukurichy Road from Km 0/000 to 4/500
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Azhoor Perumathura Road from Km 0/000 to 2/500
          43.Premonsoon works 11-12pot hole filling , clearing of side drain and culvert in Chirayinkil-Kaniyapuram road in km;2/00 to 5/00
          46.Premonsoon works 11-12 clearing of side drain and culvert in Alamcode-Meerankadavu road in km:0/00 to4/00
          T-115/Dn.13 th Finance commission 2012-13.Construction of CC drain in parassala Kollamkode road km. 0/00 to 1/500
          T-118/Dn. 13 th Finance commission 2012-13. Reconstruction of cullvert and drain in Karumam Thiruvallam road km 0/00 to 0/500.
          T-119/Dn 13 th Finance commission 2012-13. Construction of culvert and drain in Karumam Thiruvallam road km. 3/100 to 3/500.
          clearing chocked up culvert and drain in Thiruvanathapuram Shencotta Road km12/700 to 14/00
          Premonsoon work- Urgent Side drain cleaning Balaramapuram Kattakada road
          Clearing chocked up culvert and drain in Kattakkada-Kottoor road km 3/000 to 5/000
          T No 70 Pre-monsoon 2011 - Urgent patch repairs to the road from Manikanteswaram - Nettayam in Peroorkada - Mamikanteswaram road at Ch. 1/500 to 3/300
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Sreekariyam Pothencode Road from Km 4/500 to 7/500
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Narickal Pullanivila Ghandhipuram Chavadimukku Road from Km 0/000 to 6/400
          Pre-monsoon works-Urgent Side drain Cleaning- Thiruvananthapuram-Neyyardam road ch.7/800 to 8/700 km
          Pre-monsoon works-Urgent Side drain Cleaning- Thiruvananthapuram-Neyyardam road Ch.9/700 to 11/000 km.
          Pre-monsoon works-Urgent Side drain Cleaning- Thiruvananthapuram-Neyyardam road Ch.15/500 to 17/800
          clearing chocked up culvert and drain in Kattakkada-Kottoor road km 5/00 to 7/00
          Clearing chocked up culvert and drain in Kattakkada-Kottoor road km 8/00 to 10/00
          T No 66 Pre-monsoon 2011 - Clearing chocked up side drain in the radial road from Sasthamagalam Jn. towards pipinmoodu ,Maruthankuzhy and Sankar road at Ch 0/000 to2/000
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Sreekariyam Pothencode Road from Km 0/000 to 4/200
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Sreekariyam (via) Kulathur Kazhakoottam Road from Km 0/800 to 5/500
          Pre-monsoon works-Urgent Side drain Cleaning- Malayinkil-Oorutambalam road ch.2/500 to 3/500 km
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Vembayam Pallippuram Road from Km 6/500 to 12/500
          Pre- Mansoon work 2011-12: Clearing existing side drains, removing elevated berms etc in Kaniapuram Chirayimkil Road from Km 0/000 to 6/000
          Pre-monsoon works-Urgent Side drain Cleaning- Pravachambalam-Oorutambalam road ch.4/500 to 5/500 km
          Pre-monsoon works-Urgent Side drain Cleaning- Pravachambalam-Ooruttambalam Ch.3/200 to 4/500 km.
          12.Premonsoonworks 11-12 urgent drain clearance and jungle clearance to Ayiroor-Hariharapuram road from km:0/00 to 5/00
          Pre-monsoon works-Urgent Side drain Cleaning- Thiruvananthapuram-Neyyardam road ch.11/500 to 12/900 km
          Pre-monsoon works-Urgent Side drain Cleaning Malayinkil Pappanamcodu road ch.2/500
          T-117/Dn.13 th Finance commission 2012-13.Providing 40mm chipping carpet to Balaramapuram Poovar road km. 7/00 to 8/00.
          clearing chocked up culvert and side drain inThiruvanathapuram Shencotta Road km 10/00 to 12/700
          T-101/Dn. 113 th Finance commission 2012-13. Providing 40mmm chipping carpet to Studio road km 0/00 to 0/500.
          T-102/Dn. 13 th Finance commission 2012-13.Construction of Cement concrete drain in Pappanamkode Kottoor road ch 0/00 to 0/750.
          T-136/Dn. 13 th Finance commission 2012-13. Maintenance and urgent works to Njekkadu Chavercode road ch 2/400 to 3/600.
          13.Premonsoonworks11-12 urgent drain clearance and jungle clearance to Vadasserikonam-Palamkonam road from km:0/00 to 5/890
          T-116/Dn. 13th Finance commisssion 2012-13.Providing 40mm chipping carpet to Balaramapuram Poovar road km. 4/600 to 5/600.
          T-137/Dn. 13 th Finance commission 2012-13.Maintenance and urgent works to Njekkadu Chavercode road ch 3/600 to 4/640.
          5.Premonsoon works 11-12 urgent drain clearing and jungle clearance to Manamboor-Kavalayoor -Kulamuttam road from km 0/00 to 7/00
          T-91/Dn. 13 th Finance commission 2012-13.Maintenance and repairs to Vencode Sannagar Mulamukku road ch 1/350 to 2/200.
          T- 92/Dn. 13 th Finance commission 2012-13. Maintenance and repairs to Nedumangadu Aruvikkara road km. 1/350 to 2/350.
          T-93/Dn. 13 th Finance commission 2012-13. maintenance and repairs to Nedumangadu Aruvikkara road km 2/350 to 3/350.
          T-94/Dn.13 th Finance commission 2012-13.Maintenance and repairs to Nedumangadu Aruvikkara road km. 3/350 to 4/350.
          T-95/Dn. 13 th Finance commission 2012-13. Maintenance and repairs to Nedumangadu Aruvikkara road km. 4/350 to 4/900.
          T-96/Dn. 13 th Finance commission 2012-13.Maintenance and repairs to Vithura Bonacadu road from km 2/500 to 3/400.
          T-97/12. 13 th Finance commission 2012-13. maintenance and repairs to Vithura Bonacadu road km 3/400 to 4/300.
          T-98/Dn. 13 th Finance commission 2012-13. Maintenance and repairs to Vithura Bonacadu road from km. 4/300 to 5/200.
          17.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Elakamon-Parippally road from Km: 0/00 to 2/440
          32.Premonsoon works 11-12 Avoiding water stagnation in Navaikulam-Pallikkal road from km: 3/00 to 5/400
          34.Premonsoon works 11-12 avoiding water stagnation in Kilimanoor-Madavoor road from km: 6/00 to 10/00
          T-99/Dn.13 th finance commission 2012-13. Maintenace and repairs to Vithura Bonacadu road km. 5/200 to 6/200.
          2.Premonsoon works 11-12 Urgent drain clearing,jungle clearance etc. to Varkala-Kallambalam road from km:4/00 to 11/400
          T-82/Dn. 13th Finance commission 2012-13.Maintenance and repairs to kazhanadu road from km. 7/7150 to 7/750.
          T-84/Dn. 13th finance commission 2012-13. providing 20mm chipping carpet to Palode brimore road km 3/00 to 3/800.
          T-88/Dn. 13 th Finance commission 2012-13. Maintenance and repairs to Mithranikethan Companymukku Veliyannoor road from km 0/800 to 1/800.
          T-89/Dn. 13th Finance commission 2012-13.Maintenance and repairs to Mithranikethan Companimukku Veliyannoor road km. 1/800 to 2/800.
          14.Premonsoonworks11-12 urgent drain clearance and jungle clearance to Sivagiri-Sivagiri H.S road from km:0/00 to 2/00
          18.Premonsoonworks11-12 urgent drain clearance and jungle clearance to Vettoor-Varkala road from km:0/00 to 2/800
          19.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Vettoor-Nedunganda road from km:0/00 to 1/500
          20.Premonsoon works 11-12 Urgent drain clearance and jungle clearance to Varkala-Ariyittakunnu road from km ;0/00 to 1/500
          30.Premonsoon works 11-12 providing water stagnation in Nagaroor-Karette road from km: 3/00 to 6/00
          31.Premonsoon works 11-12 avoiding waterstagnation in Kilimanoor -Kadakkal (via) Adayamon road from km: 0/00 to 4/600
          T-81/Dn.13 th Finance commission 2012-13. Maintenance and repairs of Old Rajapatha road km. 2/600 to 3/400.
          T-86/Dn. 13th finance commisssion 2012-13.Providing 20mm chipping carpet to Palode Brimore road km. 9/500 to 10/700.
          21.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Varkala-Ariyittakunnu road from km:1/500 to 4/400
          33.Premonsoon works 11-12 avoiding waterstagnation in Pappala-Pangalthadam road from km;0/00 to 3/00
          T-85/Dn.13 th Finance commission 2012-13.Providing 20mm chipping carpet to Palode brimore road km 3/800 to 4/500.
          T-87/Dn. 13th finance commission 2012-13.Maintenance and repairs to Mithranikethan Companymukku Veliyannoor road km. 0/00 to 1/800.
          22.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Edava-Ayiroor road from km: 0/00 to 3/800
          T-79/Dn. 13 th Finance commission 2012-13.Maintenance and repairs to kazhanadu road km.1/450 to 1/750.
          25.Premonsoon works 11-12 urgent drain clearance and jungle clearance to Plavazhikam-Anjengo road from km:0/00 to 2/252
          T-80/Dn.13 th Finance commission 2012-13. Maintenance and repairs to Old Rajapatha road from km 1/600 to 2/600.
          T-90/Dn.13 th finance commission 2012-13.Maintenance and repairs to Vencode Sannagar mulamukku road ch 0/500 to 1/350.
          35.Premonsoon works 11-12 avoiding waterstagnation in Nagaroor-Kallambalam road from km: 8/00 to 10/00
          36.Premonsoon works 11-12 avoiding waterstagnation in Parippally-Madathara road from km: 1/600 to 11/270
          Improvements to Kulappada Panacode road from km 5/100 to 5/260 ( Panacode Junction ) - Proving 40mm BM - Balance Work
          Clearing chocked up culvert and drain in Aryanad-Palode Road 0/00 to 3/00
          Clearing chocked up culvert in Aryanad-Palode Road km 3/00 to 5/550
          clearing chocked up culvert and drain in Aryanad Junction.
          Pre-monsoon work 2011-12 - Clearing side drain to Balaramapuram - Vizhinjam road between Km 0/000 to 1/000.
          47.Premonsoon works 11-12 clearing side drain in Nilakkamukku-Kaikkara road from km: 0/00 to3/00
          Pre-monsoon work 2011-12 - Clearing side drain and rectification of drain to Vellayani Lake road Ch: 0/000 to 1/000.
          Pre-monsoon work 2011-12 - Urgent rectification work and clearing of side drain in Balaramapuram - Kattakada road Ch: 0/000 to 2/000.
          Pre-monsoon work 2011-12 - Clearing of chocked up culvert and drain in Chempoor road Km 6/000 to 7/500.
          T-83/Dn.Providing 20mm chipping carpet to Aryanadu Palode road from km.16/00 to 16/900.
          T No 74 Pre-monsoon 2011 - Urgent patch repairs to the road Eanchakkal - Kanjiravilakom road at Ch. 0/000 to 1/200
          T No 78 Pre-monsoon 2011 - Urgent patch repairs to to the road from Karamana - Poojappura at Ch 0/000 to 1/500
          T No 80 Pre-monsoon 2011 - Urgent patch works to Chiramukku - Kalladimughom road at Ch. 0/000 to 2/700
          Improvements to Peyad Vellanadu Uriyacode road from KM 9/600 to 9/735 by providing 40mm cc
          Pre-monsoon work 2011-12 - Clearing chocked up culvert and drain in various roads under Roads Section, Parassala.
          38.Premonsoon works 11-12 avoiding waterstagnation in Navaikulam-Thumbode road from km: 3/00 to 6/100
          42.Premonsoon works 11-12 clearing of side drain and culvert in Venjaramoodu-Attingal road from km:6/00 to 10/460
          44.Premonsoon works 11-12 pot hole filling and clearing of side drain in Attingal-Delavapuram road from km:0/00 to2/800
          Pre-monsoon work 2011-12 - Clearing of side drain in Neyyattinkara - Kattakada road Km 0/000 to 2/000.
          Pre- Mansoon works :- Clearing chocked up drain and culvertsMuthuvila Aruvippuram Chullalam road
          Pre-monsoon work 2011-12 - Clearing of chocked up culvert and drain in Chempoor road Km 2/000 to 3/500.
          Pre-monsoon work 2011-12 - Urgent rectification and clearing chocked up drain in Eruthavoor - Mukkampala - Naruvamoodu road Ch: 0/000 to 0/800.
          Pre-monsoon work 2011-12 - Clearing of chocked up culvert and drain in N.S road between chainage 24/400 to 26/200.
          39.Premonsoon works 11-12 avoiding waterstagnation in Chadayamangalam-Pallickal road from km;6/400 to 9/800
          clearing chocked up culvert and drain in Vellanadu-Aryanadu road km 1/00 to 4/200
          40.Premonsoon works 11-12 avoiding waterstagnation in Pallikkal-Velinelloor road from km: 0/00 to6/00
          Pre-monsoon work 2011-12 - Clearing of chocked up culvert and drain in N.S road between chainage 21/700 to 23/000.
          Clearing side drain and chocked up culverts in Muthuvila Parappil road 0/000 to 2/200
          Pre-monsoon work 2011-12 - Clearing of side drain in Pappanamcode - Kottoor road Ch: 0/000 to 3/200.
          Pre mansoon works:-Clearing chocked up drain and culverts in Vembayam Thalayil Thembamoodu road from 0/000 to 5/000
          T No 85 Pre-monsoon 2011 - Urgent patch repairs to Peroorkada - Oolampara rod in Peroorkada -Sasthamangalam road road at Ch. 1/500 to 3/200
          Pre-Mansoon works:- Clearing chocked up culvert and drain inThekkada Seemavila road 0/000 to 5/800
          T No 71 Pre-monsoon 2011 - Urgent patch repairs to Karalkada - Subhash Nagar road at Ch 0/500 to 1/500 and Eanchakkal - Poonthura road Ch 2/700 to 5/200
          Pre-monsoon work 2011-12 - Clearing of side drain and rectification works near Ammancoil and K.S.R.T.C Bus stand at Neyyattinkara in Neyyattinkara - Poovar road.
          T No 79 Pre-monsoon 2011 - Urgent patch repairs to to CIT road at Ch. 0/000 to 1/500
          Pre-monsoon work 2011-12 - Clearing chocked up drain and urgent rectification work to Perumkadavila - Kunnathukal road Km 1/300 to 2/800.
          T No 86 Pre-monsoon 2011 - Urgent patch repairs Of Vattiyoorkavu - Moonnamoodu road in Vattiyoorkavu - Vellaikkadavu road at Ch 0/000 to 1/500
          Pre-monsoon work 2011-12 - Clearing of chocked up culvert and drain in N.S road between chainage 27/000 to 28/500.
          T No 73 Pre-monsoon 2011 - Urgent bitumen patch repairs to the road inside Fort Ch 0/000 to 2/937
          T No 75 Pre-monsoon 2011 - Urgent patch works to Thampanoor Fly over - Vellayambalam road at Ch. 2/000 to 3/700
          Pre-monsoon work 2011-12 - Clearing chocked up drain and rectification works to Perumkadavila - Kunnathukal road Km 7/000 to 8/700.
          T No 77 Pre-monsoon 2011 - Urgent patch works to Thaliyal - Kalady- Kulathara- Maruthoorkadavu road at Ch. 0/000 to 1/600
          T No 81 Pre-monsoon 2011 - Urgent patch works from Thirumala - Mangattukadavu road at Ch. 0/000 to 1/500
          T No 82 Pre-monsoon 2011 - Urgent patch repairs to Vazhuthacaud - Thirumala road at Ch. 0/000 to 1/500
          Pre-monsoon work 2011-12 - Clearing chocked up drain and providing R.C.C covering slab in Neyyattinkara - Poovar road Km 0/000 to 10/000.
          T No 84 Pre-monsoon 2011 - Urgent patch repairs to Jawahar Nagar road at Ch. 2/500 to 5/000
          T-70/Dn 13 th Finance commission 2012-13. Maintenance and urgent works to Nagaroor Kallambalam road km 0/00 to 0/800.
          T-71/Dn.13 th Finance commission 2012-13. Maintenance and urgent works to Nagaroor Kallambalam road km 0/800 to 1/600.
          Pre-monsoon work 2011-12 - Clearing of chocked up culvert and drain in Chempoor road between Km 7/500 to 9/000.
          T-72/Dn. 13 th Finance commission 2012-13. Maintenance and urgent works to Nagaroor Kallambalam road km.1/600 to 2/400.
          T No 72 Pre-monsoon 2011 - Urgent patch repairs to the road Valiyathura -Sangumughom at Ch. 0/000 to 0/700 and 2/300 to 3/000
          TPre-Mansoon:-Cleaaring chocked up culverts and drain inhannimmoodu Silkform Valliyaruppankadu KM 0/000 to 5/000
          T-73/Dn. 13 th finance commission 2012-13. Maintenance and urgent works to Nagaroor Kallambalam road ch 2/400 to 3/200.
          T-74/Dn. 13 th finance commission 2012-13.Maintenance and urgent works to Nagaroor Kallambalam road km. 3/200 to 4/00.
          T-75/dn. 13 th Finance commission 2012-13. Maintenance and rehabilitation of Nagaroor Karette road km 4/050 to 5/500.
          T-62/Dn. 13 th Finance Commission 2012-13.Providing 20mm chipping carpet work in Oottukuzhy Cherukad road ch 1/500 to 2/00.
          T-66/Dn. 13 th finance commission 2012-13.Providing 20mm chipping carpet and allied works in Nedumkuzhi Edamala road ch 0/800 to 1/600.
          T No 76 Pre-monsoon 2011 - Urgent patch works to the road fromCotton hill to Kundamankadavu at Ch. 2/000 to 3/700
          T-32/dn. 13 th Finance commission 2012-13.Urgent maintenance to the road from Ambalathara to Poonthura ch 1/00 to 1/500.(Kumarichantha to School Jn)
          T No 83 Pre-monsoon 2011 - Urgent patch repairs to Jawahar Nagar road at Ch 0/000 to 2/500
          T-34/Dn 13 th Finance Commission 2012-13. Urgent maintenance to the road from Pazhavangadi to East Fort ch 0/100 to 0/600.(Padmavilasom road.)
          T-61/Dn.13 th Finance Commission 2012-13 Providing 20mm chipping carpet to Oottukuzhy Cherukadu road Ch 1/00 to 1/500.
          T-63/Dn. 13 th Finance Commission 2012-13. Providing 20mm chipping carpet to oottukuzhy Cherukadu road ch 2/00 to 2/500.
          T-65/Dn.13 th finance Commission 2012-13. Providing 20mm chipping arpet in Nedumkuzhy Edamala road ch 0/00 to 0/800.
          Pre-Mansoon works :- Clearing chocked up culverts and drain inMain Central road KM 21/000 to 25/000
          T-35/Dn. 13 th Finance Commission 2012-13.Urgent maintenance to the road from Valiyathura- Sanghumugham ch 0/200 to 0/700.
          T-31/Dn. 13 th Finance Commission 2012-13. Urgent maintenance to the road from Karalkada Subash Nagar Enchakkal -Poonthura road from ch 1/00 to 1/500.
          T-42/Dn.13 th finance Commission 2012-13. Urgent maintenance to Peroorkada Manikanteswaram Nettayam road by providing 40 mm Chipping carpet from ch 1/300 to 3/300.
          T-43/Dn.13 th Finance Commission 2012-13.Urgent maintenance to the balance portion of TK Divakaran road by providing 40mm chipping carpet from ch 1/200 to 2/00.
          T-44/Dn. 13 th Finance commission 2012.Urgent maintenance to the balance portion of Golf llink road by providing 20mm chipping carpet.
          T-54/Dn.13 th Finance Commission 2012-13. Providing 20mm chipping carpet in Kaniyapuram Chirayinkeezhu road km 2/100 to 3/00.
          T-45/Dn. 13 th Finance Commission 2012-13. Urgent maintenance to the balance portion of Moolathalakkal Madathinnada road(MLA) road) by providing 40mm chipping carpet ch 0/00 to 0/600 & 0/900 to 1/350.
          T-46/Dn. 13 th Finance commission 2012-13.Urgent maintenance work to NCC road by providing 40mm chipping carpet work.
          T-64/dn. 13 th Finance Commission 2012-13. Providing 20mm chipping carpet in Ottukuzhy Cherukodu road ch 2/500 to 3/500.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Chulliyoor Chadachimarthandom road between Km 0/000 to 2/000.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Chulliyoor Chadachimarthandom road between Km 2/000 to 4/000.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Perumkadavila Kunnathukal road between Km 0/000 to3/000.
          Pre-Mansoon works :-Clearing chocked up culverts and drain inVamanapuram Kalamachal road from KM 0/000 to 3/600
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Perumkadavila Kunnathukal road between Km 3/000 to6/000.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Uchakkada Nellimoodu road between Km 0/000 to 3/000.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Thirupurathoor Pulluvila road between Km 2/000 to 2/700.
          Premonsoon work 2012 - Clearing chocked up side drain in Balaramapuram Vizhinjam road between Km 0/000 to 1/000.
          Premonsoon work 2012 - Urgent patch works to Thirupurathoor Pulluvila road between Km 3/000 to 5/100.
          Premonsoon work 2012 - Urgent rectification works to damaged side drain in Kalliyoor Kakkamoola road between Km 0/000 to 2/150.
          Premonsoon work 2012 - Clearing chocked up side drain in Balaramapuram Vizhinjam road between Km 1/000 to 6/000.
          Premonsoon work 2012 - Clearing chocked up side drain in Pachalloor Venganoor road between Km 0/000 to 7/200.
          Premonsoon work 2012 - Clearing chocked up side drain in Peringamala Kakkamoola road between Km 0/000 to 1/150.
          Clearing side drain and chocked up culvert in Vithura-Bonaccord Road km 0/00 to 3/00
          Clearing existing drain and chocked up culvert in Nedumangad Town Branch Road
          Construction of retaining wall in Irumba Kachani Road km 0/00 to 0/600
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Chulliyoor Chadachimarthandom road between Km 4/000 to 6/050.
          Construction of Retaining wall in Irumba Kachani Road Between km 0/300 to 0/600
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Perumkadavila Kunnathukal road between Km 6/000 to9/000.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Perumkadavila Kunnathukal road between Km 9/000 to10/600.
          Clearing chocked up culvert and drain in Vithura-Bonaccord Road km 4/00 to 7/00
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Vellarada Neyyardam road between Km 0/000 to 2/000.
          Premonsoon work 2012 - Urgent rectification works to damaged side drain in Nemom Punnamoodu road near Vellayani Junction.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Pallichal Vizhinjam road between Km 0/000 to 3/000.
          Premonsoonwork 2011-12. Clearing chockedup drain and culvert in Vazhichal Amboori road bet km,1/800 to3/200.
          Clearing side drain and chockedup culvert in Mandapathinkadavu Vazhichal road km 0/00 to 1/500.
          Premansoon work 2011-12. Clearing chockedup culvert and drain in Mandapathinkadavu Vazhichal road km. 3/00 to 4/400.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Pallichal Vizhinjam road between Km 3/000 to 7/000.
          Urgent Rectification works in Vamanapuram-Chittar Road km 11/000 to 1 2/000
          Pre-Mansoon works :- Clearing chocked up drain and culverts inVamanapuram-Chittar Road at High School Junction0/000 to 21/030
          Pre-monsoon work 2011-12 - Clearing chocked up drain and culvert in Parassala Panachamoodu road Km 11/000 to 12/700.
          Pre-Mansoon works:- Clearing chocked up culverts and drain in Aryanad-Palode Road form KM 14/500 to 16/000
          Premonsoon work 2012 - Urgent rectification and drain clearance in Balaramapuram Kattakada road between Km 5/600 to 8/600.
          Premonsoon work 2012 - Urgent rectification and drain clearance in Balaramapuram Kattakada road between Km 8/600 to 10/600.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert Chemboor road bet km 0/000 to 3/000
          Premonsoon work 2012 - Clearing side drain and chocked up culvert Chemboor road bet km 3/000 to 5/000
          Premonsoon work 2012 - Clearing side drain and chocked up culvert Chemboor road bet km 7/000 to 8/500
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Aruvipuram Marayamuttom Dhanuvachapuram road bet. km 0/000 to 2/000
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Koothali Pannimala road bet km 0/700 to 1/900
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Keezharoor Aruvikara road bet. km 0/000 to 1/500
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Ottasekharamangalam Olattimoodu Valiyavazhi road bet km 2/000 to 4/000
          Premonsoon work 2012 - Urgent rectification and drain clearance of Pravachambalam Ooruttambalam road between Km 0/000 to 3/200.
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Parassala Panachamoodu road bet km 5/050 to 8/000
          Premonsoonwork 2011-12 Clearing chockedup drain and culvert in Mandapathinkadavu Vazhichal road km 1/500 to 3/00
          Premonsoonwork 2011-12. Clearing chockedup drain and culvert in Chulliyoor Chadachimarthandam road km. 0/00 t0 1/800
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Parassala Panachamoodu road bet km 8/000 to 13/8000
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Keezharoor Aruvikara road bet km 1/500 to 3/400
          Premonsoon work 2012 - Clearing side drain and chocked up culvert in Aruvipuram Marayamuttom Dhanuvachapuram road bet. km2/000 to 4/000
          Premonsoon work 2012 - Clearing chocked up side drain in Vellayani Lake road between Km 0/000 to 1/000.
          Premonsoon work 2012 - Clearing chocked up side drain in Thiruvananthapuram Vizhinjam road between Km 5/000 to 8/000.
          T-41/Dn. 13 th Finance commission 2012-13.Urgent maintenance to the balance portion of Peroorkada Mannamoola Mannarakonam road by providing 40mm chipping carpet from ch; 1/250 to 2/250.
          Pre-monsoon work 2011-12 - Clearing of choked up culvert and drain in Arattukuzhi Amboori Neyyardam road between Ch: 11/000 to 12/500.
          Pre-monsoon work 2011-12 - Clearing chocked up culvert and drain in Parassala Panachamoodu road Km 5/050 to 6/800.
          Premonsoonwork 2011-12, Clearing chockedup drain and culvert in Chulliyoor Chadachimarthandam road km. 3/00 to 4/500.
          Premansoon work 2011-12. Clearing chockedup drain and culvert in N-S road km.31/500 to 32/500.
          Premonsoon work 2012 - Urgent rectification and drain clearance in Kulangarakonam Machel road between Km 0/000 to 2/000.
          Premansoon work 2011-12. Clearing chockedup drain and culvert in aruvippuram Marayamuttam road km 4/400 to 6/300.
          Pre mansoon works :- clearing chocked up culverts and drain in Anad Branch road1/000 to 4/000
          Premonsoon work 2012 - Urgent clearing silted up drain in Amaravila Ottasekharamangalam road between Km 4/000 to 7/000.
          Premansoonwork 2011-12. Clearing chockedup drain and culvert in Vellarada Neyyardam road km o.oo to1.500
          Clearing chockedup drain and culvert in N.S road km 35/00 to 37.5
          Pre-mansoon works :-Clearing chocked up clverts and drain in Aruvikkara to Dam site raod at Aruvikkara Junction
          Pre-Mansoon works :- Clearing chocked up culverts and drain in Vamanapuram-Chittar Road at Bus stand Junction
          Pre-Mansoon works :-Clearing chocked up drain and culverts in Palode- Braimore Road km 1/000to 2/500
          Pre-Mansoon works :- Clearing chocked up culverts and drain in Pangode Kizhakkumbhagam road 0/000 to 3/500
          Pre-Mansoon works Clearing chocked up culvert and drain inChullimanoor Panayamuttom 0/000 to 2/500
          Premansoon work 2011-12.Clearing chockedup culvert and drain in Chulliyoor Chadachimarthandam road km 5/00 to 6/500 .
          Pre mansoon works :-Clearing side drain and chocked up culverts in Palode- Braimore Road km 2/500 to 4/00
          Pre-Mansoon works:- Clearing chocked up culverts and drain in Aryanad-Palode Roadform KM 13/500 to 14/500
          Pre-monsoon work 2011-12 - Urgent patch repairs to N.S road between Ch: 24/800 to 26/300.
          Premonsoon work 2012 - Side drain clearing at Amaravila Karakonam road between Km 0/000 to 2/000.
          Premonsoon work 2012 - Side drain clearing at Amaravila Karakonam road between Km 2/000 to 3/000.
          Premonsoon work 2012 - Side drain clearing at Amaravila Karakonam road between Km 3/000 to 5/000.
          Premonsoon work 2012 - Side drain clearing at Amaravila Karakonam road between Km 5/000 to 7/050.
          Pre-monsoon work 2011-12 - Urgent rectification work to Udiyankulangara Kulathoor Chavadi road between Km 2/500 to 4/000.
          Pre-monsoon work 2011-12 - Urgent patch repairs to Peringammala Kakkamoola road between Km 0/000 to 1/750.
          Pre Mansoon works :- Clearing chocked up culverts and drain in Chullimanoor Panayamuttom 2/500 to 5/000
          Pre-monsoon work 2011-12 - Urgent repairs - Providing pot hole filling to Neyyattinkara Poovar road between Ch: 0/000 and 10/000.
          Pre-Mansoon works Clearing chocked up culverts and drain in Vithura Branch road 0/000 to 1/600
          T No 87 Pre-monsoon 2011 - Urgent patch repairs from Moonnamoodu - Vellaikadavu in Vattiyoorkavu - Vellaikkadavu road at Ch 1/500 to 3/200
          T No 88 Pre-monsoon 2011 - Urgent patch repairs toMaruthankuzhy - Kachani road at Ch. 1/600 to 2/500
          Premansoonwork 2011-12. Urgent rectification works to Ayira temple road (C.V,R puram road) ch 0/00 to 2/00
          Premansoonwork 2011-12. Urgent patch repairs to Peringamala Kakkamoola road bet km 1/750 to 3/270.
          Pre-monsoon works-Urgent Cleaning Chocked up Side drain and culvert In Chalakuzhi-Medical college road
          Pre-Mansoon works :-Reparing Chanichakkadavu Bridge in Kalathukal-Uriyacode Road
          Pre-monsoon work 2011-12 - Clearing side drain in N.S road Km 13/00 to 14/000.
          Pre-monsoon work 2011-12 - Urgent patch repairs to Chemboor road between Km 6/000 to 7/500.
          Pre-monsoon works-Urgent Cleaning Side drain Chocked up Side drain and culvert In Law College Thampuranmukku Mulavana road ch.0/000 to 0/500 km
          Pre-monsoon works-Urgent Side drain Cleaning and maintenance-Thachottukavu Mangattukavu road ch.2/500 to 3/050
          Urgent rectification works to Tholicode Thuruthi Bhadramvachapara road KM 4/850 to 5/350
          Pre-monsoon works-Urgent Side drain Cleaning Malayinkil Pappanamcodu road ch.2/500 to 3/500
          Pre-monsoon work 2011-12 - Clearing chocked up culvert and drain in Chemboor road between Km 9/000 to 10/400.
          Urgent patch repairs to Arumanoor Pulluvila road Km 0/000 to 2/000.
          Pre-monsoon work 2011-12 - Urgent patch repairs to N.S road between Ch: 29/000 to 30/000.
          Pre-monsoon work 2011-12 - Urgent patch repairs to N.S road between Ch: 30/000 to 31/000.
          Pre-monsoon work 2011-12 - Urgent patch repairs to Arattukuzhi Amboori Neyyardam road between Ch: 14/000 to 14/970.
          Pre-monsoon work 2011-12 - Urgent patch repairs to Vellarada Neyyardam road Km 0/000 to 2/000.
          Pre-monsoon work 2011-12 - Urgent patch repairs to N.S road between Ch: 22/000 to 23/000.
          Urgent repairs to Balaramapuram Poovar road between Ch: 0/000 and 2/800.
          Pre-monsoon works-Urgent Cleaning Chocked up Side drain Nalumukku Kannammoola road ch. 0/000 to 2/500.
          Pre-monsoon works-Urgent Cleaning Side drain Chocked up Side drain and heaped earth covering slab in Mannanthala powdikonam road ch. 0/500 to 1/500.
          Pre-monsoon works- Chocked up Side drain and Covering slab in General Hospital Thampuranmukku
          Pre-monsoon works-Urgent Cleaning Side drain and Lifting refixing covering slab in Kumarapuram Medical College
          Pre-monsoon work 2011-12 - Urgent patch repairs to Pravachambalam Ooruttambalam road Km 0/000 to 2/200.
          Pre-monsoon work 2011-12 - Urgent rectification work - Providing 20mm bit chipping carpet to Amaravila Karakonam road between Ch: 0/900 to 3/500.
          T-27/Dn. Site survey and soil investigation for the construction of a bridge at Ponnamchundu across Vamanapuram river in Chayam Peringammala road.
          T-29/Dn.Resurfacing inVettimurichakotta to Vazhappally Jn. by providing 40mm chipping carpet from km.0/00 to 0/700.
          T-30/Dn.Upgradation of Thirunagar Pangappara road km 0/00 to 1/00 by providing 40mm chipping carpet.
          T-25/Dn. TVM Corporation works. 2011-12. Resurfacing in Perunelly Jn to Paruthikuzhy road by providing BM&BC from ch 0/00 to 0/900.
          T-28/Dn.Site survey,boring and investigation for the construction of a bridge at Pannikkuzhy connecting Pattamkulichapara and Meenamkal in TVM District.
          Urgent rectification works to 9th Mile T S road to Aruvikkara KM 2/500 to 3/400
          Urgent rectification works to Tholicode Thuruthi Bhadramvachapara road KM 5/350 to 5/750
          T-26/Dn.Site survey and soil investigation for the construction of a bridge at koovakkudy across Karamana river in Nedumangadu Vellanadu road.
          Urgent rectification works to Tholicode Thuruthi Bhadramvachapara road KM 5/750 to6/100
          Urgent pot hole filling in Thiruvananthapuram-Neyyardam road
          O/R - 2011-12: Urgent repairs by providing 20 mm bit C.C to Kariyam Pothencode Road from Km 0/250 to 0/800
          O/R - 2011-12: Urgent repairs by providing 20 mm bit C.C to Arattuvazhy Road from Km 0/000 to 1/100
          O/R - 2011-12: Urgent repairs by providing 20 mm bit C.C to Kaniyapuram Chirayinkil Road from Km 3/500 to 6/000
          Urgent Patch repairs to bit chipping carpet PMG Law College Thekkummoodu Pottakkuzhi road
          Up-2011-12Resurfacing of Golf Link road
          O/R - 2011-12: Urgent repairs by providing 20 mm bit C.C to Kaniyapuram Chirayinkil Road from Km 0/000 to 2/000
          O/R - 2011-12: Urgent repairs by providing 20 mm bit C.C to Vembayam Pallipuram Road from Km 7/600 to 10/000
          O/R - 2011-12: Urgent repairs by providing 20 mm bit C.C to Vembayam Pallipuram Road from Km 10/600 to 12/600
          Urgent Patch Repairs Bit chipping carpet Mannanthala Powdikonam road from Ch.0/000 to 1/500
          O/R - 2011-12: Urgent repairs by providing 20 mm bit C.C to SreeKariyam (via ) Kulathur Kazhakuttam Road from Km 2/200 to 3/300
          Urgent Patch Repairs Bit chipping carpet Mulavana Gourissapattom Kannammoola road from Pottakkuzhi
          Urgent Patch Repairs Bit chipping carpet Mannanthala Powdikonam road from Ch.1/500 to 3/000
          Urgent pot hole filling in Thachottukavu – Mangatukadavu road
          O/R - 2011-12: Urgent repairs by providing 20 mm bit C.C to Ambalam Vengode Road from Km 1200 to 3/600
          Urgent Patch Repairs to Chalakuzhi Medical College Bit chipping carpet from ch.0/000 to 1/200 km.
          T No 59 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Upper Merdian road at Ch. 1/250 to 1/950
          O/R - 2011-12: Urgent repairs by providing 20 mm bit C.C to Padinjattumukku Stationkadavu Road from Km 3/600 to 5/600
          D/W: Urgent restoration work due to laying of U.G Cable by KSEB,KWA,TTSL in SREEKARIYAM (VIA) KULATHUR KAZHAKUTTAM Road from Km 0/650 to 4/500
          T No 50 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Ambala Nagar road at Ch. 0/500 to 1/300
          T No 49 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Tagore road at Ch.0/700 to 1/500
          T No. 55 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Kulasekharam - Vellaikkadavu road at Ch. 0/500 to 1/300
          T No. 45 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Karamana - Poojappura road from at Ch.0/300 to 0/550
          T No 46 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Killippalam - Iranimuttom bund road at Ch.0/000 to 0/350
          T No 47 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Kulathara - Kalady South road at Ch.0/000 to 0/450( Left side and balance) reach
          T No 39 Pre Monsoon Work - 2012-13 - Clearing and repairing right side drain of Manacaud - Konchiravila road at Ch. 0/000 to 1/400
          T No 41 Pre Monsoon Work -Running contract - Urgent pot hole repairing by using Pot hole filling Machine on various roads under City Roads Section No.I, for the period from 01/06/2012 to 30/09/2012
          T No 48 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Manancaud - Kalady road at Ch.0/350 to 0/800
          Urgent 20mm thick bit chipping carpet to KIMS HOSPITAL to Vayuvihar road from Ch.0/000 to /800
          D/W: Urgent restoration work due to laying of U.G Cable by BSN L in VeliKadinamkulam Road from Km 16/500 to 16/720 & Padinjattumukku Puthukurichy Road 5/630 to 6/400
          D/W: Urgent restoration work due to laying of U.G Cable by Kerala Communication Net Work in Vembayam Pallipuram Road from Km 6/400 to 10/100
          D/W: Urgent restoration work due to laying of U.G Cable by KSEB in Kariyavattom Thrippadapuram Road from Km 1/700 to 2/800
          T No 53 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Golf Links road (Right Side) Ch.0/000 to 1/000
          T No 57 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of NCC road at Ch. 0/000 to 0/500
          T No 60 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Vattiyoorkavu - Kulasekharam road at Ch. 0/000 to 0/300
          T No 38 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Manacaud - Perunelly road at ch. 0/000 to 0/400
          T No.42 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Valiyathura - Airport road at Ch. 1/500 to 1/700
          T No 44 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Karamana - Thaliyal road Ch.1/600 to 2/600
          T No.52 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Cliff House road at Ch. 1/200 to 1/900
          D/W: Urgent restoration work due to laying of U.G Cable by KSEB in veli Kadinamkulam Road from Km 1/800 to 4/000
          D/W: Urgent restoration work due to laying of U.G Cable by BSNL in16th Mile TQ Road to Vengode from Km 1/750 to 3/000
          T No.51 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Kuravankonam - Uppermerdian Approch road at Ch. 0/000 to 0/600
          T No 94 Pre-monsoon 2011 - Urgent patch repairs to the road Vattiyoorkavu - Kulasekharam at Ch 0/300 to 3/000
          T No 99 Pre-monsoon 2011 - Urent patch repairs to Kodunganoor - Plavodu road at Ch. 0/500 to 2/000
          T No 37 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Enjakkal - Kanjiravilakom road at Ch. 0/000 to 1/750
          T No 40 Pre Monsoon Work - 2012-13 - Clearing and repairing Right side drain of Manacaud - Valiyathura road at Ch. 0/700 to 1/050
          T No 43 Pre Monsoon Work - 2012-13 - Clearing and repairing side drain of Bakery junction to Womens College at Ch.0/000 to 0/400
          T No 89 Pre-monsoon 2011 - Urgent patch repairs to the road Peroorkada - Mannanthala at Ch. 0/000 to 1/000
          T No 96 Pre-monsoon 2011 - Urgent patch repairs to the road from Vazhayila - East Mukkola at Ch 0/000 to 2/000
          T No 90 Pre-monsoon 2011 - Urgent patch repairs to PMG -TTCroad at Ch. 0/000 to 1/000
          T No 91 Pre-monsoon 2011 - Urgent patch repairs from Nettayam to Malamughal road in Nettayam - Manalayam - Moonnammoodu MLA road at Ch. 0/000 to 1/500
          T No 92 Pre-monsoon 2011 - Urgent patch repairs from Malamughal to Moonnamoodu road in Nettayam - Manalayam - Moonnammoodu MLA road at Ch.1/500 to 3/000
          T No 95 Pre-monsoon 2011 - Urent bitumen patch repairs to Kundamonkadavu - Vattiyoorkavu road(Balance reach) at Ch. 0/500 to 2/000
          T No 60 Pre-monsoon 2011 - Clearing chocked up side drain of Vattiyoorkavu - Kulasekharam road at Ch 0/300 to 3/000
          T No 93 Pre-monsoon 2011 - Urgent patch repairs to the road from Moolathalakkal - Madathilnada MLA road at Ch 1/000 to 1/350
          T No 67 Pre-monsoon 2011 - Urgent patch repairs to Maruthankuzhy - Kachani road at Ch. 0/800 to 1/600
          T No 97 Pre-monsoon 2011 - Urgent patch repairs to Plamoodu - Marappalam Loop road at Ch. 0/000 to 0/400
          T No 98 Pre-monsoon 2011 - Urgent patch repairs to Maruthankuzhy - PTP road ( Pipe line road) at Ch 0/200 to 1/100
          T No 100 Pre-monsoon 2011 - Urgent patch repairs to Kulasekharam- Vellaikadavu road at Ch 0/000 to 1/300
          R/P 2011-12 Widening and Improvements to Pallimukku- Vilayilmoola -Thinavila road Change : 3/000 to 3/775
          Tender No.37 Pre-monsoon 2011- clearing side drain of Cliff House road at Ch 0/00 to 1/00
          O/R 2011-12 Widening and Improvements to Pallimukku- Vilayilmoola -Thinavila road Chainage : 3/775 to 4/400.
          Tender No.35 Pre-monsoon 2011- Urgent patch repairs to Muruthenkuzhy to Kachani road at Ch 0/00 to 0/800
          Tender No.51 Pre-monsoon 2011- clearing side drain of Cliff House road at Ch 0/00 to 0/800
          Tender No.52 Pre-monsoon 2011- clearing side drain of PMG - TTC road at Ch 0/800 to 1/800
          Tender No.57 Pre-monsoon 2011- clearing side drain of Nettayam - Manalayam - Moonnammoodu ML A road at Ch 0/00 to 3/000
          Tender No 67 Pre-monsoon 2011- Urgent patch repairs to Muruthenkuzhy to Kachani road at Ch 0/800 to 1/600
          T No 102 D/W - Rectification of tar cut for laying U.G. Cable by KSEB in Jagathy - Poojappura road Near women's college along Vazhuthacaud - Thycaud road and Thycaud guest house - thycaud Jn road
          Improvements to Vlathankara Avanakkinvila Road (Ch. 0/000 to 2/950)
          T No 104 D/W Rectification of tar cut due to laying pipe line by KWA along Kunjalumoodu to Melarannoor Housing board Flat.
          T-18/Dn.Conveyance of bulk bitumen in tanker lorries from Bharath petroleum Corporation Ltd ambalamughal to various work site under Roads subdivision neyyattinkara.
          T-20/Dn.Conveyance of packed bitumen from Bharath petroleum corporation Ltd Ambalamughal to Roads Division Compound Thiruvananthapuram. for the year 2012-13.
          T No 167 SDF for MLA- 2010 -11 -Tvpm North Constituency - Retarring to the Vazhavilakam - Chathanthara road in Vattiyoorkavu Block.
          T-15/Dn.Conveyance of bulk bitumen in tanker lorries from Bharath Petroleum Corporation Ltd. Ambalamughal to various work site under City roads Subdivision TVM..
          T-16/Dn.Conveyance of bulk bitumen in tanker lorries from Bharath petroleum corporation Ltd Ambalamugal to various work site under Roads subdivision Thiruvananthapuram.
          T-17/Dn.Conveyance of bulk bitumen in Tanker lorries from Bharath petroleum Corporation Ltd.Ambalamugal to various work site under ATTINGAL Roads subdivisionfor 2012-13.
          T-19/Dn.Conveyance of bulk bitumen in tanker lorries from Bharath petroleum corporation Ltd Ambalamugal to various work site under Roads subdivision NEDUMANGADU for 2012-13
          T-21/Dn.Conveyance of packed bitumen emulsion from Bharath petroleum corporation Ltd. Ambalamugal to Roads Division Compound Thiruvananthapuram.
          T No 103 D/W - Rectification of tar cut for laying pipe line by KWA along Vellayambalam - Vazhuthacaud road and Melarannoor -Parachiora to Rajeev gandhi Bio tech road
          Tender No.60 Pre-monsoon 2011- Clearing side drain of Vattiyoorkavu - Kulasekharam road at Ch 0/300 to 3/000
          T No 183 FD- 2009-10 Providing 20CC to Kuruvikkadu - Ettayoorkonam road
          T.No.168 SDF for MLA-10-11 -TVPM North LAC- Metalling and tarring to the Irukunnam Mudippura road in Vattiyoorkavu Block.
          Construction of side drain for releasing water stagnation to Balaramapuram Poovar road between Ch: 3/700 to 3/800.
          Urgent rectification works to Poozhikkunnu Mavilakkadavu road between Km 0/000 to 2/200.
          Urgent rectification works - Providing 20mm bit chipping carpet to Parassala Panachamoodu road Km 5/050 to 13/800.
          Urgent rectification works to Balaramapuram Kattakada road Km 0/000 to 2/200.
          Urgent patch repairs to Balaramapuram Poovar road Ch: 2/800 to 5/000.
          Urgent rectification works to Udiyankulangara Kulathoor Chavadi road between Km 5/500 to 7/000.
          Urgent rectification works to Balaramapuram Kattakada road Km 5/000 to 7/000.
          Urgent patch repairs to Balaramapuram Poovar road Ch: 5/000 to 7/000.
          Urgent rectification works to Udiyankulangara Kulathoor Chavadi road between Km 7/000 to 8/200.
          Providing 20mm thick bit chipping carpet works to Culliyoor Chadachimarthandom road Km 0/000 to 6/048.
          Urgent patch repairs to Balaramapuram Poovar road Ch: 8/000 to 9/000.
          Urgent patch repairs to Chempoor road beween Ch: 3/000 to 6/000.
          Urgent rectification works to Uchakkada Pozhiyoor road between Km 0/000 to 2/206.
          UP 11-12 Imp. to Aruviyod Thuruthimoola road
          UP 11-12 Providing 20mm CC 8th mile TS road to Aruvikkara Km 1/00 to 4/350.
          R/P 11-12 Providing 20mm CC to Mandapathinkadavu Munnara road Ch:3/827 to 4/400 (Balance portion)
          UP 11-12 Providing 20mm CC to Vithura Bonacaud road Km 15/00 to 19/00.
          Urgent special repairs to Pozhiyoor bridge in Uchakkada Pozhiyoor road between Km 2/150 to 2/206.
          Pre-monsoon work 2011-12 - Urgent patch repairs to Peringammala Kakkamoola road between Km 0/000 to 1/750.(Retender of tender No.35)
          Pre-monsoon work 2011-12 - Urgent patch repairs to Arattukuzhi Amboori Neyyardam road between Ch: 14/000 to 14/970. (Retender of tender No. 46)
          Up-11-12 of Road in Darsan Nagar Road
          R/P 11-12 Providing 20mm CC to Kovalam beach Jn. in Kovalam Ist Approach to Kovalam Guest House
          R/P 11-12 Providing 20mm CC to Kovalam Guest House to Palace Road
          UP 11-12 by providing 20mm CC to 16th Mile TQ road to Vengodu Km 1/500 to 3/00.
          UP 11-12 Imp. to Chamavila Thettikala Elamthottam Kudayal road Ch Km.0/00 to 3/00
          UP 11-12 Providing 20mm CC to Channankara Kochu Kodungallore road in Kadinamkulam
          Filling up of pot holes using pot hole filling machine in Various roads under venjaramood section
          UP 11-12 by providing 20mm CC to Cliff House Road Ch: Km.0/00 to 0/700
          UP 11-12 by providing 20mm CC to Kalayuil Ambaithala road
          UP 11-12 by providing 40mm CC to Kanjirampara Kachani road Km 1/250 to 2/250
          UP 11-12 by providing 20mm CC to Karamoodu Plavara Chambala Andoorkonam road
          Filling pot holes with pot hole filling machine in Various Roads under palode section
          UP 11-12 by providing 40mm CC to Kaito office Ashamukku Choolapura road Ch from 0/00 to 2/100.
          Filling up pot holes with pot hole fillining machine in variuos roads under aryanad section
          Filling up of pot holes using pot hole filling Machine Various roads under nedumangad section
          T No 89 Pre-monsoon 2011 - Urent patch repairs to the road Peroorkada - Mannanthala at Ch. 0/000 to 1/000
          Up-11-12 Improvements to Manchavilakom Variyankuzhi road Ch:0/00 to 2/500.
          Clearing side drain and berm at Kanjiramkulam Junction.
          Up-11-12 Improvements to Kiliyoor Kallimoodu road Km.0/00 to 3/500.
          Clearing side drain in Balaramapuram - Poovar road between Km 2/800 and 5/500.
          Up-11-12 Providing 20mm CC to Nedumangadu Aruvikara road Ch km.0/00 to 1/500.
          Up-11-12 Providing 20mm CC toVenkode Sun Nagar Mulamukku road from Km 0/00 to 0/550.
          Up-11-12 Providing 20mm CC to Kunnampara Kuruvimughal Machel road
          Up-11-12 Providing 20mm CC to Kazhanad road
          Up-11-12 Improvements to Pattom Kowdiar Loop road
          Pre-monsoon work 2011-12 - Urgent patch repairs to Chemboor road between Km 3/000 to 6/000.
          Up-11-12 Improvements to Kovoor Varaikonam road i Ch0/00 to 2/930 Providing 40mm CC
          Up-11-12 Improvements to Olathanni Irivikonam Manaveli road Ch0/00 to 1/300.
          Up-11-12 Improvements to Mukkolavila Pulinghudy Edukkaravila Chemboor road Ch. 0/00 to 3/500.
          T No 106 Running contract - Urgent pot hole filling( using pot hole repairing machine ) on various roads under City Roads Section No. II Thiruvananthapuram for the period from 1/6/2011 to 30/9/2011
          T No 105 Running contract - Urgent pot hole filling( using pot hole repairing machine ) on various roads under City Roads Section No. I, Tvpm. for the period from 1/6/2011 to 30/9/2011
          T No 107 Running contract - Urgent pot hole filling( using pot hole repairing machine ) on various roads under City Roads Section No. III,Tvpm. for the period from 1/6/2011 to 30/9/2011
          T No 109 Painting pedestrian crossing, Central line marking etc. using Retro Reflective Paint and Painting Kerb,median etc using synthetic enamal paint in various roads under City Roads Section No 2
          T No.33 Pre-Monsoon-2012-13 Clearing and repairing side drain of Udarasiromani road (Reach 1) at Ch.0/000 to 1/100
          T No.34 Pre-Monsoon-2012-13 Clearing and repairing side drain of Vattiyoorkavu - Vellaikkadavu road at Ch.0/800 to 3/200
          T No.35 Pre-Monsoon-2012-13 Clearing and repairing side drain of Muttada - Paruthippara road at Ch.0/000 to 1/200
          T No 108 Painting pedestrian crossing, Central line marking etc. using Retro Reflective Paint and Painting Kerb,median etc using synthetic enamal paint in various roads under City Roads Section No 1
          T No.26 Pre-Monsoon-2012-13 Clearing and repairing side drain of Cotton Hill - Kundamonkadavu road at Ch.2/500 to 3/500
          T No.27 Pre-Monsoon-2012-13 Clearing and repairing side drain of Kannettumukku - Mettukkada road at Ch.0/000 to 0/400
          T No.28 Pre-Monsoon-2012-13 Clearing and repairing side drain of DPI - Ammenkovil road at Ch.0/000 to 0/400
          T No.29 Pre-Monsoon-2012-13 Clearing and repairing side drain of Chiramukku - Kalladimughom road at Ch.0/000 to 0/400
          T No.30 Pre-Monsoon-2012-13 Clearing and repairing side drain of Forest Office Junction - Bakery junction road at Ch.0/100 to 0/200
          T No.31 Pre-Monsoon-2012-13 Clearing and repairing side drain of Nanthencode Jn. - South Aproach road to Cliff House at Ch 0/000 to 0/200 and Road Inside Jawahar Nagar at Ch.0/900 to 3/000
          T No.32 Pre-Monsoon-2012-13 Clearing and repairing side drain of T.K.Divakaran road (Reach 1) at Ch.0/000 to 1/200
          T No 110 Painting pedestrian crossing, Central line marking etc. using Retro Reflective Paint and Painting Kerb,median etc using synthetic enamal paint in various roads under City Roads Section No 3
          T No.24 Pre-Monsoon-2012-13 Clearing and repairing side drain of Jagathy - Killippalam( Kochar road) at Ch.0/000 to 0/600
          T No.22 Pre-Monsoon-2012-13 Clearing and repairing side drain of Padinjarekottah - Kanjiravilakom road at Ch.0/000 to 1/850
          T No.20 Pre-Monsoon-2012-13 Clearing and repairing side drain of Valiyathura - Sanghumughom road at Ch.0/000 to 1/750
          Up-11-12 Providing 20mm CC toPravachambalam Railway Station Road 0/00 to 0/450.
          Up-11-12 of Poonthura St. Thomas Church road.
          Up-11-12 Improvements to Poovathoor Muverikara Road
          Up-11-12 of Pallichal Vizhinjam Road Ch:8/00 to 9/00.
          Up-11-12 to Providing 20mm CC Padinjattumukku Station Kadavu road km 2/200 to 3/600.
          Up-11-12 of PMG TTC Road
          Up-11-12 Improvements to Panayara Chavarcode road in Tvpm Ch0/00 to 2/930 Providing 40mm CC.
          Up-11-12 od Puthenkada Planthottam Arumanoorkada road Km. 0/00 to 1/700.
          UP 11-12 Providing 20mm CC to Policestation Tholikuzhi road Ch 3/00 to 5/200.
          T No.21 Pre-Monsoon-2012-13 Clearing and repairing side drain of Vallakkadavu - Arattugate road at Ch.0/000 to 0/300
          T No.25 Pre-Monsoon-2012-13 Clearing and repairing side drain of Kunnappuzha School to Aramada Church road at Ch.0/000 to 0/850
          T No.36 Pre-Monsoon-2012-13 Clearing and repairing side drain of Vettamukku - Pallimukku road at Ch.0/000 to 1/800
          T No.23 Pre-Monsoon-2012-13 Clearing and repairing side drain of Padinjarekottah - Puthenroad Junction at Ch.0/700 to 1/400
          T No.14 Pre-Monsoon-2012-13 Clearing and repairing side drain of Elippodu - Arappura road at Ch.0/000 to 1/400
          T No.15 Pre-Monsoon-2012-13 Clearing and repairing side drain of Karavila road and Kadayilmudambu road at Ch.0/000 to 1/800
          T No.17 Pre-Monsoon-2012-13 Clearing and repairing side drain ofMaruthankuzhy -Kachani Road at Ch.2/700 to 4/500
          Premonsoon works- Urgent repairs to clearing blockage of culverts, side drain, removal of silt, mud etc. from B.T surface in Varkala-Vettoor road Ch. 0/00 to 2/800
          T No.19 Pre-Monsoon-2012-13 Clearing and repairing side drain ofPlamoodu - Marappalam Loop Road at Ch.0/000 to 0/400 and road around M.G.College at Ch.0/000 to 2/000
          T No.2 Pre-Monsoon-2012-13 Clearing and repairing side drain in Ayurveda college to Chettikulangara road at Ch.0/000 to 0/400
          T No.4 Pre-Monsoon-2012-13 Clearing and repairing side drain of road Iside Fort at Ch.0/000 to 2/937
          Premonsoon works - Urgent drain clearance, culvert, construction of covering slab in Sivagiri-Sivagiri H.S Road
          Premonsoon works - Urgent drain clearance, culvert in Punnamoodu-Guest House road Ch. 0/00 to 5/000
          T No.18 Pre-Monsoon-2012-13 Clearing and repairing side drain of Nettayam - Manalayam-Moonnammood road (MLA road reach-1) at Ch.2/700 to 4/500
          T No.6 Pre-Monsoon-2012-13 Clearing and repairing side drain to the road around Residency at Ch.0/000 to 0/300
          T No.13 Pre-Monsoon-2012-13 Clearing and repairing side drain of Ambalamukku - Oolampara road at Ch.0/000 to 0/600
          T No.9 Pre-Monsoon-2012-13 Clearing and repairing side drain to the Kalyan Hospital - Therakom at Ch.0/000 to 0/650
          T No.3 Pre-Monsoon-2012-13 Clearing and repairing side drain in Pulimoodu - Kaithamukku road at Ch.0/00 to 0/950
          T No.11 Pre-Monsoon-2012-13 Clearing and repairing side drain of Karamana - Jagathy road (via) Parachira at Ch.0/600 to 1/500
          T No.1 Pre-Monsoon-2012-13 Clearing and repairing side drain in Airport to Cheelanthiimukku road at Ch.0/000 to 1/450
          T No.12 Pre-Monsoon-2012-13 Clearing and repairing side drain of Kesavadev road at Ch.0/700 to 1/760
          T No.8 Pre-Monsoon-2012-13 Clearing and repairing side drain of East Fort -Killippalam road at Ch.0/000 to 0/200
          T No.16 Pre-Monsoon-2012-13 Clearing and repairing side drain ofMaruthankuzhy -PTP Road (Pipe line road) at Ch.0/000 to 1/200
          Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs etc in Padinjattumukku – Puthukurichy road km0/000 to 6/400
          Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs etc in Kariavattom - Chengottukonam road km 0/000 to 2/800
          Pre monsoon works 2012-13.Urgent patch repairs to Law college-Pottakuzhi road ,Law college Thekkumoodu road ch 0/000 to 0/800.
          Premonsoon works: Clearing berm, drain and culverts in Kilimanoor-Madavoor road Km. 0/000 to 6/000
          Premonsoon works: Clearing berm, drain and culverts in Kilimanoor-Kadakkal(Via Adayamon) road Km. 0/000 to 4/600
          Premonsoon works- Urgent pot hole filling and clearing drain and culvert in Varkala-Edava-Kappil road
          Premonsoon works - Urgent drain clearance, culvert in Ayiroor-Hariharapuram road Ch. 0/00 to 5/000 Km
          Premonsoon works- Urgent repairs to clearing blockage of culverts, side drain, removal of silt, mud etc. from B.T surface in Plavazhikom-Anjengo road Ch. 0/00 to 2/252
          T No.10 Pre-Monsoon-2012-13 Clearing and repairing side drain of Karamana road (via) Soman Nagar at Ch.0/150 to 0/450
          :- Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs etc in Kaniyapuram-Chirayinkil road km 0/000 to 6/000
          Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs etc in Veli -Kadinamkulam road km0/000 to 6/000.
          Premonsoon works: Clearing berm, drain and culverts in Police Station- Tholikkuzhy road from Km 3/000 to 5/200
          Premonsoon works: Clearing berm, drain and culverts in Ponganad- Puthusserymukku road from Km 0/000 to 5/400
          Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs etc in Kariavattom-Thrippadapuram road km 0/000 to 2/800
          Premonsoon works: Clearing berm, drain and culverts in Nagaroor- Karatte road from Km 0/000 to 5/000
          Premonsoon works: Clearing berm, drain and culverts in Nagaroor- Kallambalam road from Km 0/000 to 8/000
          Premonsoon works: Clearing berm, drain and culverts in Navaikulam-Pallickal road Km. 0/00 to 3/0
          Premonsoon works- Urgent pot hole filling,clearing blockage of culvert, side drain, removal of silt, mud from BT surface etc. in Varkala-Parippally road Ch. 0/00 to 5/000
          T No.7 Pre-Monsoon-2012-13 Clearing and repairing side drain of Aryasala road at Ch.0/000 to 0/250
          Premonsoon works - Urgent drain clearance, culvert, construction of Venkulam-Kappil H.S road Ch. 0/00 to 3/500
          Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs etc in Kaniyapuram-Landing road km0/000 to 1/900
          Up-11-12 Construction of Foot Path in left side of Upper Meridain road.
          Up-11-12 od Thirupurathoor Pulluvila road between Ch:0/00 to 2/900 Km.
          Up-11-12 of Spencer to Gas House Junction road at Ch.0/00 to 0/222.
          Up-11-12 of Santhamoola Machel road
          Up-11-12 of Udarasiromoney road 0/00 to 1/100.
          Up-11-12 Improvements to Vadasserykonam Chemmaruthy LPS Ch: 0/00 to 2/500.
          Up-11-12 Providing 20mm CC toV.Kesavan Nair road from Km 0/00 to 2/00.
          Up-11-12 of Puthukurichy Convent Kottaramthuruthu road
          Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs etc in Sreekariyam - Pothenkodu road km 4/800 to 7/500
          Pre monsoon work 2012-13. Clearing side drain and culvert in PMG – Plamoodu road Ch 0/00 to 0/550
          Pre monsoon works 2012-13.Urgent patch repairs to PMG- Law college-Pottakuzhi road between ch 0/000 to 0/600
          Premonsoon works: Clearing berm, drain and culverts in Kilimanoor-Alamcode road Km. 5/000 to 10/800
          Premonsoon works- Urgent pot hole filling,clearing blockage of culvert, side drain, removal of silt, mud from BT surface etc. in Varkala-Parippally road Ch. 5/00 to 11/400 Km
          Premonsoon works - Urgent drain clearance, culvert in Njekkad-Chavercode road Ch. 2/00 to 4/640
          Premonsoon works- Urgent repairs to clearing blockage of culverts, side drain, removal of silt, mud etc. from B.T surface in Cherunniyoorkadavu-Nadayara road and Cherunniyoor kadavu Branch road Ch. 0/
          Premonsoon works- Urgent repairs to clearing blockage of culverts, side drain, removal of silt, mud etc. from B.T surface in Manamboor-Kavalayoor-Kulamuttom road ch. 0/00 to 7/200
          :- Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs etc in Pothenkodu - Murukkumpuzha road km 6/600 to 10/000
          Pre-monsoon woks-2012-13. Running Contract -Filling up pot holes at various roads under Cantonment Section TVPM
          Premonsoon works: Clearing berm, drain and culverts in Kilimanoor-Alamcode road Km. 0/000 to 5/000
          Premonsoon works: Pot hole filling using pot hole repairing machine along various Roads under Roads Section, Kilimanoor
          T No.5 Pre-Monsoon-2012-13 Clearing and repairing side drain of Chilappatheruvu road at Ch.0/000 to 0/200
          Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs etc in Vettu road-St.Andrews road km0/000 to 2/800
          Premonsoon works- Claering berm, drain and culverts in Parippally- Madathara road from Km 1/600 to 5/000
          Premonsoon works: Clearing berm, culvert and drain to Parippally- Madathara road from Km 8/400 to 11/270
          Premonsoon works: Clearing berm, drain and culverts to Pallickal- Velinalloor road Km 0/000 to 6/000
          Premonsoon works: Clearing berm, drain and culverts in Pallickal- Moothala- Edavelickal road from Km 0/000 to 3/000
          Providing road marking and sign boards to Chirayinkil- Kaniyapuram road Km 0/000 to 3/500
          Providing road markings and sign boards to Chirayinkil- Kaniyapuram road from Km 3/500 to 7/000
          Pre-monsoon woks-2012-13. Side drain Cleaning in Peyadu – Vilappilsala – Mulayara road ch 0/000 to 1/000
          Premonsoon works- Clearing side drain, culvert and berm in Nilakkamukku- Kaikara road from Ch 0/000 to 2/850
          Premonsoon works- Clearing side drains and culverts in Pandakassala- Thekkumbhagom- Chekkalavilakom road from Ch 0/000 to 2/800
          Pre-monsoon woks-2012-13. Urgent Patch Repair to various road in Malayinkil Section
          Pre-monsoon woks-2012-13. Side drain Cleaning in Ooruttambalam-Pravachambalam road ch 3/200 to 5/500
          Premonsoon works- Clearing drain and culverts in Anjengo- Muthalapozhy road from Km 0/000 to 3/000
          Pre-monsoon woks-2012-13. Side drain Cleaning in Peyadu – Vilappilsala – Mulayara road ch 2/000 to 3/000
          Pre monsoon work 2012-13. Clearing side drain and culvert in General Hospital Thanpuranmukku road Ch 0/00 to 0/450
          Pre monsoon work 2012-13. Clearing earthen drain and removing the raised berm in Veli Venpalavattom road Ch 0/00 to 1/950
          Pre-monsoon woks-2012-13. Side drain Cleaning in Anthiyoorkonam - Thachotukavu road ch 3/500 to 4/500
          Pre monsoon works 2012-13. Clearing existing side drain, removing elevated berms etc in Kariyam- Pothenkodu road km3/500 to 10/000.
          Pre-monsoon woks-2012-13. Side drain Cleaning in Anthiyoorkonam - Thachotukavu road ch 2/500 to 3/500
          Pre monsoon works 2012-13. Clearing existing side drain, cutting of jungles , surface repairs etc in Ambalam - Vengode road km0/000 to 3/800
          Pre-monsoon woks-2012-13. Side drain Cleaning in Malayinkil - Pappanamcode road ch 0/000 to 3/200
          Pre-monsoon woks-2012-13. Side drain Cleaning in Pongumoodu - Anappadu road ch 2/000 to 3/000
          Premonsoon works- Clearing side drain, culvert and berm levelling to Kollampuzha landing Avanavanchery road from KM 2/200 to 4/200
          Pre monsoon works 2012-13.Cutting jungles, clearing side drain , surface repairs Sreekariyam- Pothenkodu road km 0/000 to 4/500.
          Urgent rectification works- Clearing side drain, culverts and berm levelling in Chirayinkil- Kaniyapuram road from Km 4/000 to 7/000
          Pre-monsoon woks-2012-13. Urgent patch repairs to Thachottukavu –Mangattukadavu road ch 1/500 to 3/050
          Pre monsoon works 2012-13. Clearing existing side drain ,cutting of jungles, surface repairs etc in Sreekariam – Kulathoor- Kazakuttom road km0/000 to 4/500
          Pre monsoon work 2012-13.Clearing Side drain and reconstruction of culvert at Chakkai Vattathoppu road Ch 0/100.
          Pre monsoon work 2012-13.Clearing Side drain and culvert at Law College Pattoor Road Ch 0/00 to 1/000
          Pre-monsoon woks-2012-13. Side drain Cleaning in Thiruvananthapuram - Neyyardam road Ch 9/700 to 10/700
          Pre-monsoon woks-2012-13. Side drain Cleaning in Thiruvananthapuram - Neyyardam road Ch 16/100 to 17/300
          Pre-monsoon woks-2012-13. Side drain Cleaning in Malayinkil - Pappanamcode road ch 3/200 to 4/200
          Pre-monsoon woks-2012-13. Side drain Cleaning in Thiruvananthapuram - Neyyardam road Ch 7/800 to 8/700
          Pre-monsoon woks-2012-13. Side drain Cleaning in Anthiyoorkonam junction
          Pre monsoon works 2012-13. Clearing existing side drain ,cutting of jungles, surface repairs etc in Pothenkodu – Murukkumpuzha road km 0/000 to 6/500
          Pre monsoon works 2012-2013. Clearing existing side drain ,cutting of jungles, surface repairs etc in 16th mile T Q to Vengode- road km0/000 to 3/000
          Pre monsoon work 2012-13.Cleaning side drain and culvert in front of Police Station Ch 2/000 to 2/500
          Pre monsoon work 2012-13. Clearing side drain and culvert in Nalumukku Medical College road 1/500 to 2/300
          Pre-monsoon woks-2012-13. Side drain Cleaning in Thiruvananthapuram - Neyyardam road Ch 10/700 to 12/000
          Pre-monsoon woks-2012-13. Side drain Cleaning in Thiruvananthapuram - Neyyardam road Ch 12/000 to 16/100
          Pre-monsoon woks-2012-13. Side drain Cleaning in Thiruvananthapuram - Neyyardam road Ch 8/700 to 9/700
          Providing road markings and sign boards to EHS- Kalamachal road from Km 0/000 to 4/200
          Pre monsoon works 2012-2013.Cutting jungles, clearing side drain , surface repairs Vembayam-Pallipuram road km 6/500 to 12/800.
          Pre monsoon works 2012-13. Clearing existing side drain, cutting of jungles etc in Ambalam - Paichira road km0/000 to - 4/500
          Pre monsoon work 2012-13.Maintanance and clearing side drain Nalumukku-Medical college road Km 0/000 to 0/500
          Up-11-12 Construction of Retaining wall in Thakaraparambu Thattathumala road Km.5/500 to6/500
          JNNURM D/W Rectification of Trenched portion of Shanghummugham Veli road Portion from Vettukadu School to Veli.
          Clearing chocked up drain and culverts in Vembayam Thalayil Thembamoodu road from KM 5/000 to 7/500
          Improvements to Moolayambalam - Aliyad - Chellayam Road
          Clearing chocked up drain and culverts in Vamanapuram-Chittar Road km 6/000 to 9/00
          Clearing chocked up drain and culverts in Kulappada Panacode Mannoorkkonam road from KM 0/000 to 5/000
          Clearing Chocked up Culvert and drain in Muthiyavila - Ottasekharamangalam Road 0/000 to 5/200
          Clearing Chocked up culvert and drain in Vamanapuram-Chittar Road km 9/000 to 11/200
          Clearing chocked up drain and culverts in Uzhamalakkal Parantode Road 0/000 to 4/250
          Clearing Chocked up culvert and drain in Nedumangad Shorlacode road from km 9/000 to 11/000
          Clearing Chocked up culvert and drain in Vembayam Thalayil Thembamoodu road 2/500 to 5/000
          Clearing chocked up culvert and drain in Charumoodu Ayyappankuzhy road from km 0/000 to 5/500
          Clearing chocked up drain and culverts in Plavoor Keezharoor road from KM 0/000 to 2/500
          Clearing Chocked up culvert and drain in Kalathukal-Uriyacode Road 0/000 to 2/000
          Clearing Chocked up culvert and drain in Vembayam Thalayil Thembamoodu road 0/000 to 2/500
          Clearing Chocked up culvert and drain in Kalathukal-Uriyacode Road 2/000 to 4/000
          Clearimg chocked up drain and culverts in 8th Mile TS road to Aruvikkara o/ooo to 2/400
          Clearing chocked up drain and culverts in Vamanapuram Kalamachal road from KM 0/000 to 3/600
          Up 11-12 Providing 40mm BM in Vellanadu road from Km 0/00 to 1/00.
          Up 11-12 Formation Metalling tarring and concrete paving of Kaithottukonam Aramada MAlakal Devi Temple road.
          D/W T.92 Rcetification of Tar cut due to laying TTSL of cable along Jagathy Poojappura Road
          D/W T.88 JNNURM Rcetification of Tar cut due to laying Pipe line by KWA Unser JNNURM Scheme in Vli Kadinamkulam road Km.4/900 to 6/00.
          D/W T.91 JNNURM Rcetification of Tar cut due to laying Pipe line by KWA in Karumam Thiruvallom road Km 3/500 to 5/600.
          Widening and improvements to the road from Kalady to Maruthoorkadavu - providing BM & BC.
          Clearing Chocked up culvert and drain in Muthuvila Aruvippuram Chullalam road 2/700 to 5/00
          Clearing Blocked up culvert and drain in Vithura Branch road 0/000 to 1/300
          Clearing Chocked up culvert and drain in Thannimmode Perayam Chellanchi KM 0 000 to 2.00
          D/W T-133 Rectification of tar cut for 33KV UG cable laying from Thirumala Sub station to proposed Karamana Sub Station.
          Up 11-12Improvements to Vattappullu Methottam Pongod road from Km 0/800 to 3/100.
          D/W T-89 Rectification of tar cut forOFC cable laying from Peroorkada to Civil Station
          Clearing Chocked up Culvert and drain in Thannimmode Perayam Chellanchi KM 2/000 to 4/000
          Clearing chocked up culvert and drain in Thannimmode Perayam Chellanchi KM 4/000 to 6/000
          Up 11-12 Providing 40mm Chipping Carpet to Plamoodu Nanthancodu road
          Clearing chocked up drain and culverts inVattappara - Kuttiyani - Pothencode road from KM 2/000 to 4/000.
          Clearing chocked up drain and culverts in Thekkada Panavoor road from KM 2/500 to 5/000
          Clearing chocked up drain and culverts in Vembayam-Nedumangadu Road from KM 1/000 to 3/000
          Up 11-12 Raising the road surface to avoid water stagnation of NSS Karayogam Nandiram
          Up 11-12 Providing 20mm Chipping Carpet to the road from Thamalam Ch0/00 to 1/850
          Clearing chocked up drain and culverts in Thiruvanathapuram Shencotta Road 33/000 to 35/000
          Providing 50mm BM and 25mmBC to Karakulam-Mullassery Kummippally road from km 0/000 to 4/000
          BM & BC works to Balaramapuram – Vizhinjam road from km. 5/000 to 6/700.
          Clearing chocked up culverta and drain in Karingal Colony Deviation road (PSLV) from KM 0/000 to 1/400
          Clearing chocked up drain and culverts in Irumba Kachani road from km 0/000 to 2/000
          Clearing chocked up drain and culverts in Thottumukku - Erappil Anapetty Chayam Road from KM 0/000 to 4/100
          Clearing Chocked up culvert and drain inThiruvanathapuram Shencotta Road 23/800 to 25/300
          Providing 50mm BM and 25mm BC to Vamanapuram - Chittar Road from km 8/500 to 10/500
          Clearing chocked up drain and culverts in Thekkada Panavoor road KM 0/000 to 2/500
          Clearing chocked up culverts and side drain in Chullimanoor Panayamuttom 0/000 to 2/500
          Clearing chocked up drain and culverts in Chullimanoor Panayamuttom 2/500 to 5/000
          Providing 50mm BM and 25mm BC to Vithura-Bonacaud Road from km 0/000 to 2/500
          Clearing Chocked up culvert and drain in hiruvanathapuram Shencotta Road 40/500 to 43/200
          MLA SDF Con. of Box Culvert and approach road across Ambalathara thodu in Ambalathara ward.
          Up 11-12 of road along pipeline road KWA, Narmatha Jn to Sri Krishnaswamy Temple road.
          Up 11-12 Providing 20mm CC to Aiswarya Gardens road along Peroorkada Vazhyila road.
          Construction of retaining wall on Sivagiri –Sivagiri H.S road, in front of Sivagiri Mutt in Thiruvananthapuram district – Balance work.
          Upgradation. Providing 20mm chipping carpet to Vithura-Bonacaud Road at km. 9/000 to 12/000
          Improvements to Panchamoodu - Panchamkuzhi- Mullilavuvila road between ch.0/000 to 2/300
          Construction of drain and footpath at Manacaud-Valiathura Road from ch. 0/650 to 1/000
          Clearing chocked up culverts and side drain in Vattappara - Kuttiyani - Pothencode road.from KM 0/000 to 2/000
          Upgradation - Providing BM and BC to Maruthankuzhy - Vattiyoorkavu Road km.1/035 - 1/535
          Improvements to Kiliyoor Karamoodu road ch 0/000 to 2/600
          Up 11-12 Providing 20mm to the road from Killippalam Iranimuttom bund road Ch 1/500 to 2/150.
          Clearing chocked up drain and culverts in Vattappara - Kuttiyani - Pothencode road.from KM 4/000 to 6/000
          Improvements to Balaramapuram – vizhinjam road km. 3/300 to 5/000 BM & BC work.
          Clearing Chocked up culvert and drain inThiruvanathapuram Shencotta Road 38/000 to 40/500
          Improvements to Pathamkallu - Machannoor - Aravalakunnu - Prasanth nagar road.
          Clearing Chocked up culvert and drain inThiruvanathapuram Shencotta Road 35/000 to 38/000
          Clearing chocked up culverts adn drain in Kallara - Muthuvila road km 3/00 to 5/000
          Resurfacing of Pappanamcode - Kottoor road km. 0/000 to 3/000 by providing BM&BC
          Clearing chocked up drain and culverts in Vithura-Bonaccord Road from KM 4/000 to 9/000
          Clearing Chocked up Culvert and drain inAryanad-Kottakkakom Road from Km 0/000 to 3/000
          Clearing Chocked up culvert and drain in Pattakulam Pezhumoode road Km 0/00 to 5/600
          MLA SDF Con. of drain and tarring the Manacadu Konchiravila road Ch 0/7 to 1/700 Km.
          Pre-monsoon works-Urgent Cleaning Side drain and removal of heaped earth in Mannanthala powdikonam road ch. 0/000 to 0/500
          Clearing chocked up drain and culverts inKallara - Muthuvila road km 1/00 to 3/000
          Clearing Chocked up culvert and drain in Vellanad Branch Road km 0/000 to 0/430
          Clearing Chocked up culvert and drain inNedumangad Aruvikkara Road km 1/600 to 3/500
          Clearing Chocked up culvert and drain in Aryanad Pezhumoode road from km 0/000 to 3/000
          Clearing Chocked up culvert and Drain in Tholicode Thuruthi Bhadramvachapara road KM 0/000 to 3/00
          Running contract- Urgent rectification of pot holes using pot hole repairing machine along various roads under Roads Section, Cantonment, Thiruvananthapuram for period from 1/7/2011 to 31/10/2011.
          Running contract- Urgent rectification of pot holes using pot hole repairing machine along various roads under Roads Section, Kazhakuttom, Thiruvananthapuram for period from 1/7/2011 to 31/10/2011
          Clearing Chocked up culvert and drain in Muthuvila Aruvippuram Chullalam road 0/00 to 2/700
          Clearing Chocked up culvert and drain in Thiruvananthapuram Neyyardam road 25/000 to 27/200
          Improvements ro Palamoodu - Eeanthivila - Katta Cheeranikkara road.
          Clearing Chockedup culvert and drain in Kuttichal -Kottoor roadfrom km 1/900 to 3/700
          Clearing chocked up culverts and drain in Nedumangad Town Branch Road from KM 0/000 to 1/800
          Clearing chocked up drain and culverts in Vithura-Bonaccord Road km 2/500 to 4/000
          Clearing chocked up drain and culverts inThiruvananthapuram Ponmudi road KM 29/000 to 34/000
          Clearing chocked up drain and culverts in Thiruvananthapuram Ponmudi road KM 34/500 to 36/000
          Clearing chocked up drain and culverts in Vembayam-Nedumangadu Road KM 3/000 to 7/150
          Up 11-12 Improvements to Kavalayoor Perungulam road in Thiruvananthapuram Dist. Ch: 0/00 to 1/600.
          Up 11-12 of Moozhy Bhagavathypuram road from Km 0/00 to 1/00.
          Up 11-12 Improvements to Manavari Vallichira road in Kunnathukal Panchayat Ch. 0/00 to 1/100.
          Up 11-12 of Koyikal lane in Kannammoola Kalakaumudi road.
          Urgent rectification of pot holes using pot hole repairing machine along various roads under Roads Section, Malayinkil, Thiruvananthapuram,Running contract for period from 1/7/2011 to 31/10/2011.
          Up 11-12 of Azhicode 101 acre Alummoodu road bet.0/00 to 1/130.
          Up 11-12 Improvements to Chavadi Kallarathala road Km 0/00 to 2/00
          Up 11-12 Improvements to Maninadu Chemmandy road in Km 0/00 to 2/175.
          Up 11-12 Improvements to NH Ambadi Thettiyode road Km 0/00 to 0/450 from NH Ambadi to thettiyode road.
          Up 11-12 ofProviding 20nn CC& Construction of Side drain in Mookkunnimala road Km 0/00 to 1/200.
          T - 1/Dn. Ordinary Repairs.2012-13.Urgent rectification to Ayira road km.0/00 to 1/900.
          T - 12/Dn. Renewal programme 2012-13.Providing 40mm chipping carpet to Mampazhakkara road km.0/00 to 1/00.
          T -13/Dn.Flood damages. Reconstruction of the side drain from Vazhappally Jn. to Azhicotta Jn.
          T- 14/Dn. Flood damages.Reconstruction of damaged retaining wall in Thakaraparambu road.
          T - 4/Dn. Ordinary repairs 2012-13. Urgent rectification to Poozhikkunnu Mavilakkadavu road km.0/00 to 2/200.
          T - 5/Dn. Ordinary repairs 2012-13. Urgent rectification to Udiyankulangara Dhanuvachapuram road km. 0/00 to 1/140.
          T - 6/Dn. Ordinary Repairs 2012-13. Providing RCC covering slabs to various roads under Roads section Neyyattinkara.
          T - 7/Dn. 2012-13. Providing 40mm chipping carpet to Balaramapuram - Poovar road ch. o/oo to 0/900km.
          T - 8/Dn. renewal programme. 2012-13. Providing 20mm chipping carpet to Balaramapuram Poovar road km.0/900 to 1/800.
          T - 9/Dn. Renewal programme 2012-13. Providing 40mm chipping carpet to Balaramapuram Poovar road ch 1/800 to 2/800.
          T - 3/Dn. Ordinary repairs. 2012-13.Urgent rectification to Uchakkada Pozhiyoor road km. 0/00 to 2/200.
          T- 10/Dn.Renewal programme. 2012-13. Providing 40mm cchipping carpet to Neyyattinkara Kacheri road km.0/00 to 0/400.
          T - 11/Dn.Renewal programme 2012-13.Providing 40mm chipping carpet to Udiyankulangara Kulathoor Chavady roadkm. 7/500 to 8/200.
          Providing 20mm chipping carpet to Karakulam-Mullassery Junction-Vengod junction road from km 1/800 to 4/200
          Providing 20mm chipping carpet to Attinpuram-Perayam Road from km 2/000 to 4/000
          Providing 20mm chipping carpet to 9th Mile T S road to Aruvikkara KM 1/600 to 3/200
          T - 2/Dn. Ordinary repairs. 2012-13.Urgent rectification to Idichakkaplamoodu-Plamoottukada roa.
          Providing 20mm chipping carpet to 9th Mile T S road to Aruvikkara KM 0/000 to 1/600
          Bit chipping carpet at Thachottukavu – Anthiyoorkonam road between ch 0/600 to 1/075
          Rectification of pot holes using pot hole filling machine in Various roads under nedumangad section
          Rectification op potholes using pothole filling machine in Various Roads under palode section
          Up 11-12 Improvements to Onamkodu Nadoorkolla road in kollayil Pt. between Ch.0/00 to 1/200.
          Up 11-12 Improvements to Vengakkala Thettiyodukonam road in Kunnathukal Grama pt.
          Rectification of potholes using v pothole filling machine in Various roads under venjaramood section
          Urgent Patch works Enikkara kallayam km 2/000 to 4/000
          Up 11-12 Improvements to Pliyode Mancala road Ch: 0/00 to 1/100.
          Up 11-12 Improvements to Palukal Malayaadi road from Km0/00 to 1/200.
          Up 11-12 of Resurfacing the road from Radhakrishna Lane at Vazhayila
          Ractification of pothole using pothole fillin machine in variuos roads under aryanad section
          Up 11-12 Improvements to Parassala Hospital Jn. Chandanakatti road bet. Km.0/00 to 0/600.
          Up 11-12 of Puthenpalam Murinjapalam Kalakaumudi road.
          Ottasekharamangalam - Olattimoodu - Veliyavazhi Road km.4/000 to 9/650.
          R/P Providing Bit CC to Kulappada Panakkodu road Km 3/900 to 4/600 to 5/100..
          MLA SDF Providing 20mm CC and fresh drain for the Vrindavan road side of Chakkai Vattathope road
          S/R Con. of Foot path in Edapazhinji jn.
          S/R Con. of Foot path at Left side of Museum Nanthancodu road
          Urgent rectification of damaged culvert and clearing chocked up side drain in Balaramapuram Poovar road between Km 11/000 and 12/400.
          Rectification of pot holes using pot hole filling machine in various roads under Roads Section, Kunnathukal.
          Up 11-12 Improvements to Mannammoola Murikalil road at ch: 0/00 to 0/500.
          Supplying Shelamc PR at roads Division Thiruvananthapuram up to 31-3-2012
          Up 11-12 of Kowdiar Narmada pipe line road Ch:0/00 to 0/400.
          Rectification of pot holes using pot hole filling machine in various roads under Roads section Neyyattinkara.
          Rectification of pot holes using pot hole filling machine in various roads under Roads Section, Parassala.
          Rectification of pot holes using pot hole filling machine in various roads under Roads Section, Kanjiramkulam.
          2.Running contract Urgent Rectification of pot holes (using pot hole repairing machine) along various roads under Kilimanoor section
          1.Running contract urgent rectification of pot holes (using pot hole repairing machine) along various roads under Attingal section
          3.Running contract Urgent Rectification of pot holes (using pot hole repairing machine) along various roads under Varkala section
          Russalpuram - Punnakkad roadProviding 40mm C.C. to Russalpuram – Punnakkad road km. 0/800 to 1/800.
          urgent rectification works to various roads under aryanad section
          T-662/Dn. Maintenance works to Adimalathura bridge in Kovalam Assembly Constituency.
          T-664/Dn. Urgent rectification to lourdippupram Chinnamarthandam road ch 0/00 to 1/250
          T-658/Dn. Deposit work.KWA. Urgent restoration work due to laying of pipe line by KWA for Oceanus Dwelling in Kariyavattom Thrippadapuram road from Arasumoodu to Thrippadapuram.
          T-645/Dn. Construction of CC drain in Ottasekharamangalam - Olattimoodu - Valiyavazhy road near Plampazhanji school.
          T-654/Dn. 13 th Finance commission 2011-12. Resurfacing by providing 50mm BM and BC to Vembayam - Nedumangadu road km. 0/00 to 0/300.
          T - 655/Dn R/P 13th Finannce commission 2011-12. Resurfacing by providing 50mm BM and 25mm BC to Vembayam - Nedumangadu road 0/300 to 0/600.
          Budget work-11-12. Improvements to Deveswaram – Angemelethil road km. 0/00 to /700.
          Providing 20mm bit chipping carpet in Vamanapuram- Kalamachal road from Km 4/200 to 4/800
          T-659/Dn. Renewal programme. 2011-12. Providing 20mm chipping carpet to 16 th Mile TQ road to Vengodu, km. 1/100 to 1/700.
          Urgent rectification and patch repairs to Nilakkamukku- Kaikara road from Km 0/000 to 2/880
          Perunthamon - Kallara Road
          Avoiding water stagnation and clearing the blocked culvert and side drain at Nilakkamukku Junction in Alamcode- Meerankadavu road
          T-642/Dn. Construction of culvert and Cement concrete drain in Neyyattinkara Old Aanchel office road at km.1/200.
          T-643/Dn. Construction of side drain and providing covering slabs at Poovar in Neyyattinkara Poovar road bet ch 9/800 and 10/00.
          T-646/Dn.Urgent rectification works to Vattavila Pirayimmoodu road between km. 1/00 to 2/00.
          T-660/Dn. R/P. Providing 20mm chipping carpet to Puthumana - Attukadavu road.
          T-656/Dn. 13th Finance commission 2011-12. Resurfacing by providing 50mm BM and BC to Vembayam - Nedumangadu road, km. 0/600 to 0/900.
          T-663/Dn.Reconstruction of Ponnara bridge (Perunelli) across T.S Canal in TVM district - Investigation works.
          Providing 40mm chipping carpet to Pappala Pangal thadam road km.2/00 to 3/00.
          R/P Widening surface renewal with 40mm. chipping carpet from Ch 6/00 to 6/800 of Nagaroor-Karette road.
          T-640/dn. Construction of side drain and rectification works to Parassala Panachamoodu road km.9/050 to 12/800.
          T-641/Dn. Construction of CC drain across Chaikottukonam branch channel at ch 1/980km. (Near Manchavilakom road crossing)
          T-639/Dn. Urgent rectification works to Chemboor road ch 0/00 to 2/00.
          T-650/Dn.TVM Corporation works. Resurfacing the road by providing 20mm chipping carpet to inside Rose garden residence Association near Mukkolackal in Nettayam ward ch 0/00 to 0/600.
          T-637/Dn. Road safety. Improvements of school Zone. L>P School Jn. at Vattappara in MC road.
          T-648/Dn. Providing an opening in the road in front of main gate of Police head quarters vazhuthacaudu and providing hand rails in both side of Head qurters.
          Providing 40 mm thick chipping carpet to Udiyankulangara - Kulathur - Chavadi road km.6/500 to 7/500
          R/P – Widening and surface renewal with 40mm CC from ch.3/00 to 4/00 of Nagaroor Karette road.
          Providing 20mm bit chipping carpet in Vamanapuram- Kalamachal road from Km 3/600 to 4/200
          T-661/Dn. Renewal programme. 2011-12. Providing 20mm chipping carpet to Vembayam Pallippuram road km.10/800 to 11/800.
          T-644/Dn. Special repairs .Construction of Protective walls along the culvert at Koliyoor in Pachalloor Venganoor road.
          T-638/Dn. Ordinary Repairs. Improvements to Pallichalthodu - Mavarathala - Pakaloor road ch 0/00 to 0/310km.
          T-657/Dn. 13 th Finance commission 2011-12. Resurfacing by providing 50mm BM and BC in Vembayam - Nedumangadu road, km. 0/900 to 1/100.
          Providing 40mm thick chipping carpet to Udiyankulangara Kulathoor Chavadi road km.5/500 to 6/500
          Providing 40mm chipping carpet to Pappala - Pangathadavu Road from km 1/00 to 2/00
          T-649/Dn. Special repairs. Construction of protective walls to Karumam Thiruvallam road from km. 2/400 to 3/00.
          T-652/Dn. Flood damages. Reconstruction of damaged side drain from Vazhaappally Jn. to Azhikotta jn.
          T-653/Dn. Flood damages. Reconstruction of retaining wall in Thakarapparambu road.
          T-651/Dn. Flood damages. Rectification of side drain and covering slab from Hantex Jn. to Fire force office.
          Urgent rectification to retaining wall at Madhupalam Bridge and clearing the side drain (between Km 0/000 to 0/900) in Karumam - Thiruvallam road.
          T-632/Dn. Deposit work. Restoration work due to laying KWA 63mm PVC pipe at CSMF lane from Marappalam to Artech Relators in TKD road.
          T-636/Dn. Construction of side drain and foot path in Manikanteswaram in Peroorkada - Nettayam road ch 2/400 to 2/600.
          T-633/Dn. Construction of side drain and footpath in Museum - Nanthencode road ch 0/400 to 0/600 (Right side)
          T-634/Dn. Construction of side drain and foot path in Museum - Nanthencode road ch 0/00 to 0/750 (Right side)
          T-635/Dn. Construction of side drain and foot path in Manikanteswaram in Peroorkada - Nettayam road ch 2/200 to 2/400.
          T-629/Dn. Special repairs. Providing RCC covering slab over drain of Pappanamcode Kottoor road km.2/00 to 2/700.
          T-628/Dn. Special Repairs. Construction of Protective walls to Karumam Thiruvallam road from km. 2/400 to 3/00.
          T-619/Dn. Special repairs 2011-12. Construction of drain and Foot path from Maruthankuzhy to Omkar Jn. ch 0/00 to 0/150, RHS.
          T-621/Dn Construction of drain and foot p;ath from maruthamkuzhy to Omkar Jn. ch 0/300 to 0/500 RHS
          T-620/Dn. Special repairs. Construction of side drain and foot path from Maruthumkuzhy to Omkar Jn. ch 0/150 to 0/300 RHS
          T-631/Dn. O/R Urgent patch repairs to Balaramapuram Vizhinjam road between ch 4/00 to 6/500.
          T-627/Dn Special repairs. Construction of drain in Pappanamkode Kottoor road km 1/300 to 1/900.
          T-624/Dn. O/R. Reconstruction of damaged culvert at km.0/00 of Vithura Branch road.
          T-625/Dn. Deposit work 2011-12 Rehabilitation of RWSS to Kollamkonam Vallakadavu road.
          R/P Providing 20mm CC to Easwaravilasam road by lines.
          T.No.288 - Painting pedestrian crossing centre line marking etc using Retro reflective paint and painting kerb, median etc using synthetic enamel paint in various roads under City Roads Section No.I,
          Up-2011-12 Improvements to Anjumukku Odayam Masjid road Km. 0/00 to 1/500.
          R/P Providing 20mm CC & Clearing the side drain at Kothuval street and Sabapathy Coil street near Chali Bazar.
          T.No.289 - Painting pedestrian crossing centre line marking etc using Retro reflective paint and painting kerb, median etc using synthetic enamel paint in various roads under City Roads Section No.2
          T-622/Dn. Special repairs 2011-12 Construction of tiled foot path0 from Maruthamkuzy to Omkar Jn. 0/00 to 0/500 LHS (Balance portion of RHS)
          T.No.290 - Painting pedestrian crossing centre line marking etc using Retro reflective paint and painting kerb, median etc using synthetic enamel paint in various roads under City Roads Section No.3
          T-623/Dn. Construction of tiled foot path from Maruthankuzhy to Omkar Jn. 0/00 to 0/500 RHS
          T.No 292 - Providing earth filling and rolling in sunken berm of the Vazhuthacaud - Poojappura road by earth filling including consolidation. Ch.0/000 to 2/000
          T.No 291 - Proving earth filling and rolling in sunken berm of the Vazhuthacaud - Pangodu road by earth filling including consolidation. Ch.0/000 to 2/000
          Urgent rectification works due to laying of water supply pipeline in 17th mile TQ road to join 3rd mile Venjaramood- Attingal road from Ch 5/400 to 6/200
          O/R 2011-12 - Urgent patch work to Uchakkada - Karichalkayal road Km 0/000 to 2/000.
          O/R 2011-12 - Urgent patch work to Vellarada - Neyyardam road Km 2/000 to 3/000.
          F/D 2011-12 - Urgent rectification to culvert and drain in Chulliyoor - Chadachimarthandam road Km 1/100 and 3/000.
          S/R 2011-12 - Construction of C.C drain in front of Panchayat office Vellarada in Parassala - Panachamoodu road bet Km 10/200 and 11/000.
          O/R 2011-12 - Urgent patch work to Kurissadi - Ambalathinmoola - Karumkulam road Km 1/800 to 3/000.
          S/R 2011-12 - Urgent repairs to damaged drain and clearing chocked up drain in Nemom - Punnamoodu road between Km 0/000 and 0/500.
          F/D 2011-12 - Releasing water stagnation, construction of side drain in Amaravila - Karakonam road at Km 0/900 (bet Km 0/900 to 1/000).
          O/R 2011-12 - Urgent patch work to Uchakkada - Nellimoodu road between Km 0/000 to 2/000.
          O/R 2011-12 - Urgent patch work to Kurissadi - Ambalathinmoola - Karumkulam road Km 3/000 to 4/500.
          O/R 2011-12 - Urgent patch work to Kurissadi - Ambalathinmoola - Karumkulam road Km 4/500 to 6/000.
          T-528/Dn. TVM Corporation Works 2011-12. Improvements to PMG Brigadiar lane University road BM&BC
          T-514/Dn. Maitenance of Poovar bridge in Neyyattinkara Constituency in TVM District.
          T-517/Dn. NABARD - RIDFXVII - Construction of bridge at Panchikattukadavu in Thirupuram and Chenkal Grama panchayath across Neyyar river in Neyyattinkara(Soil investigation & site survey works)
          T-516/Dn Investigation works to Keezharoorkadavu bridge across Neyyar river in TVM District.
          T-515/Dn Investigation works to Changadakadavu bridge in Amboory Grama panchayath across Karippayar river inside Neyyar resorvoir in Parassala constituency in TVM District.
          T-525/Dn. TVM Corporation Works 2011-12. Strenthening of carriageway by providing 40mm maccadam to Kariyavottom Viyyattukonam Chirayil road km 0/00 to 1/250, Chempazhanthy Aniyoor Temple road km 0/00
          T-529/Dn TVM Corporation Works 2011-12. Resurfacing to Ayoorkonam Madaathuvilakom road ch 0/00 to 0/700 and Shasthanagar - Kunnumpuram road 0/00 to 0/800
          T-530/Dn TVM Corporation Works 2011-12. Resurfacing to Panchami lane Mathavilakom road ch 0/00 to 1/200
          T-521/Dn. TVM Corporation Works 2011-12. Strengthening of carriageway by providing 40mm Meccadam to Mele Chanthavila Annoor Mangattukonam road km 0/00 to 1/250 and Ullorkonam Nalumukku road 0/00 to 1/
          T-524/Dn. TVM Corporation Works 2011-12. Providing BM&BC to Ravoorkonam - Edavacoce - East road km.0/00 to 0/600
          T-531/Dn TVM Corporation Works 2011-12. Resurfacing to Mullanchani Kadilmadampu road 0/00 to 1/500 and Pularinagar Thattassery Thittamangalam road 0/00 to 0/600.
          T-522/Dn TVM Corporation Works 2011-12. Strengthening of carriageway by providing 40mm maccadam to Manvila Ambedkarpuram colony road 0/00 to 1/400 and Pangappara Muttalumoodu - Perunthara road km. 0/0
          T-520/Dn. Widening of road from Kannamoola to Medical college road ch 0/00 to 1/600 (Up to Kumarapuram Jn.)
          T-523/Dn. TVM Corporation Works 2011-12. Strenthening of carriageway by providing 40mm maccadam to Melechanthavila -Murappankode -Andoorkonam road km 0/00 to 1/150, Kattaikonam -Ariyottukonam road km.
          T-526/Dn. TVM Corporation Works 2011-12. Strenthening of carriageway by providing 40mm maccadam to Powdikonam Panavila Subhash Nagar road km. 0/00 to 1/700, Mukkilkada Avukkulam Valiyavila road km 0/0
          T-532/Dn TVM Corporation Works 2011-12. Resurfacing the road from Nethaji Chengaloore- Vedankonam road ch 0/00 to 1/400 and Sasthanagar - Vevekananda Nagar road ch 0/00 to 1/00.
          MLA-Fund 21010-11-Formation and Tarring of Sree Krishna Lane Pongummoodu Division
          OR-Urgent pot hole filling in Thachottukavu – Mangatukadavu road
          F.D. –Providing 20mm chipping carpet to Sasthan Covil lane road and Puthenpalam Colony road ch.0/000 to 0/100 & ch.0/000 to 0/190
          T-534/Dn. TVM Corporation Works 2011-12. Resurfacing of Valiyasala gramam road 0/00 to 0/475, Thamaravel Kannavila road 0/00 to 0/825 and Valiyasala City road 0/00 to 0/910 by providing 40mm chipping.
          T-533/Dn TVM Corporation Works 2011-12 Resurfacing the road by providing 20mm chipping carpet in Chadiyara - Nagarukavu road km 0/00 to 0/9000 and Nethaji Nagar km 0/00 to 0/800.
          T-535/Dn. TVM Corporation works 2011-12. Resurfacing the Kalpalayam road ch 0/00 to 0/565), HSLPS road (ch 0/00 to 0/230) and the Sasthry Nagar road (ch 0/00 to 0/800) by providing 40mm chipping carpe
          T-536/Dn. TVM Corporation Works 2011-12. Resurfacing the road by providing 40mm chipping carpet over BT surface to the road from Vatttavila ch 0/00 to 0/800 and ch 0/00 to 1/200 in Lanka road.
          T-538/Dn TVM Corporation Works 2011-12. Resurfacing of Nellikkunnu - Plavilakode temple road by providing 40mm chipping carpet ch 0/00 to 1/230 and Thulavila Kaikulam Narayil Nagar road ch 0/00 to 1/1
          T-539/Dn TVM Corporation Works 2011-12. Resurfacing by providing chipping carpet to Vizhinjam market -Chennavilakom - Ramankulam road ch 0/00 to 0/900, Township Madrassa Vaduvachal road 0/00 to 0/7000
          T-540/Dn. TVM Corporation works 201-12 Harbour ward. Resurfacing by providing 40mm chipping carpet to Vizhinjam Harbour Light house road ch 0/00 to 0/550, Township Vaduvachal road 0/00 to 0/850,Kovala
          T-537/Dn Improvements to TVM Corporation roads (Ponnumangalam ward) Nemom TP Lane Plavila road, Pazhaya Karakkamandapam Ponnumangalam Transformer road 0/00 to 0/500, Karakkad Lane road 0/00 to 0/500.
          T-541/Dn. 13 th Finance Commission M&R MDR 2011-12. Providing 20mm CC to Vengodu - Mangottuoola road from 0/000 to 1/500
          T 542/Dn 13 m&R MDR. 20111-12 Providing 20mm chipping carpet to Vengodu Mangottumoola road from km 1/500 to 3/00
          O/R 2011-12 - Urgent rectification to N.S road Km 36/800 to 37/500.
          O/R 2011-12 - Urgent patch work to Arumanoor - Pulluvila road Km 2/000 to 3/750.
          O/R 2011-12 - Urgent rectification to culvert and CC drain in Perumkadavila - Kunnathukal road Km 7/200 to 7/700.
          O/R 2011-12 - Urgent patch work to Thirupurathoor - Pulluvila road Km 3/750 to 5/600.
          T-511/Dn SR Construction of CC drain bet km 3.300 to 3/700 of Ponganadu Puthussrimukku road.
          O/R 2011-12 - Construction of CC drain in front of Mahila Samajam in Perumkadavila - Kunnathukal road Km 4/300 to 4/700.
          O/R 2011-12 - Urgent patch work to Nemom - Punnamoodu road Km 2/800 to 4/000.
          O/R 2011-12 - Urgent patch work to Lourdipuram - Chinnamarthandom road Km 0/000 to 1/000.
          O/R 2011-12 - Urgent rectification to N.S road Km 36/000 to 36/800.
          O/R 2011-12 - Urgent patch work to Thirupurathoor - Pulluvila road Km 2/900 to 3/250.
          T-495/Dn Urgent side drain construction to avoid flood damages in Malayam Mottamoodu road ch 0/00 to 1/00.
          T-512/Dn SR Construction of retaining wall and drain in Manamboor Kavalayoor Kulamuttom road km.1/500 to 2/800.
          T-499/Dn. R/P Providing 20mm chipping carpet to Nedumaangadu - Karipoor road km 0/00 to 3/00 & 5/750 to 5/950.
          T-498/Dn R/P Providing 40mm chipping carpet to Nedumangadu Shorlacode road from km 14/200 to 14/700.
          T-508/Dn. S/R Construction of masonry retaining wall at km 1/500 of Muthiyavila Ottasekharamangalam road (near Viswadeepthy school)
          T No 111 Urgent patch repairs to Puthen road from Ch. 0/000 to 1/950
          T No 112 Urgent patch repairs to West Fort - Kanjiravilakom road from Ch. 0/000 to 1/850
          T No 113 Urgent patch repairs to Radhapura Junction in Peroorkada - Sasthamangalam road at Ch. 3/300 to 1/850
          T No 114 Construction of culvert and side drain at Kuntdamankadavu Junction in Vattiyoorkavu - Kundamankadavu road at Ch.2/000to ad at Ch. 3/300 to 1/850
          T No 119 Raising of road surface in front of Hindustan Limited at Oolampara 0/000 to 0/125
          T-503 /Dn R/P Providing 20mm chipping carpet to Chayam Peringamala road from km 4/100 to 5/200.
          T-504/Dn R/P Providing 20mm chipping carpet to Vellanadu road km 4/600 to 5/600.
          T-505/Dn R/P Construction of foot path in Kuravankonam loop road at ch 0/00 to 0/350.
          T-506/Dn S/R Construction of retaining wall at km 2/00 of Charumoodu Ayyappankuzhy road near ISRO Compound
          T-494/Dn Urgent side drain construction to avoid flood damage in Malayam Mottamoodu road ch 2/00 to 3/00.
          T-496/Dn Construction of side drain and retaing wall at Kuzhakkad temple road.
          T-497/Dn Central line and Zebra line marking in Peyad Vilappilsala Mulayara road and allied works.
          T-500/Dn Improvements to Thekkada Panavoor road from km 5/00 to 6/100.
          T No 118 Construction of leading drain to Thodu at Kuntdamankadavu in Vattiyoorkavu - Kundamankadavu road at Ch.1/950
          T-501/Dn. Improvements to Thekkada Panavoor road from km 6/100 to 7/200.
          T-502/Dn. R/P Providing 20mm chippin carpet to Chayam Peringamala road from km 3/00 to 4/100.
          T-507/Dn SR Construction of side drain bet km 1/500 to 2/00 in Kallra Muthuvila road.
          Urgent patch works to Perumpazhuthoor Aruvipuram road from km 0/000 to 2/000
          Urgent rectification works to Aruvippuram Marayamuttom road from km 0/000 to 2/000
          T No 115 Urgent patch workrs to the road from Ramachanvila to parachira Ch. 0/000 to 0/800
          T No 117 Urgent patch works to to Jagathy - Parachira road.at Ch. 0/000 to 1/000
          T No 120 Urgent patch workrs to the Vettamukku - Pallimukku road9Balance portion) road in beween Thirumala - Pangodu and Thirumala - Poojappura, and the road behind the Mazjith at Pallimukku Jn
          T-493/Dn. SR Extension of culvert, Repairs in Kaniyapuram Puthenthope and Padinjattumukku Puthukurichy road.
          Urgent patch works to Aruvipuram Perumkadavila road from km 0/000 to 2/000
          T No 116 Urgent patch workrs to the road from Mudavanmugal to Kongalam Ch. 0/000 to 1/500
          T No 122 Special repairs - Providing missing covering slab to drains in various roads under City Roads Section No 1 Tvpm 0/000 to 0/125
          T-489/Dn R/P 2011-12 Providing 40mm maccadam to Padinjattumukku Stationkadavu road Km. 4/800 to 5/600.
          T No 121 Construction of side wall and providing existing covering slab in Amayizhanjan thodu at Thakaraparambu
          T-491/Dn Sr Construction of side drain in Kaniyapuram landing road between km 0/900 to 1/200.
          T-486/Dn R/P Providing 20mm chipping carpet with seal coat to Ambalam Vengode road from km 0/00 to 1/200
          T-487/Dn R/P Providing 20mm chipping carpet with seal coat to Caniyapuram Chirayinkil road km 0/00 to 1/200.
          T-490/Dn R/P Providing 20mm chipping carpet with seal coat to Veli Kadinamkulam road from km 2/800 to 3/640
          T-492/Dn SR Construction of side drain in Padinjattumukku Puthukurichy road km 1/400 to 1/900.
          Sivagiri Festival 2011-12: Providing hump and jungle clearance to Cherunniyoorkadavu road from Km 0/000 to 7/200
          Sivagiri Festival 2011-12: Painting works to Nadayara, Ayroor and Villikkadavu Bridges
          T-477/Dn Construction of side drain and foot path to the road from Mudavanmugal Co- operative bank ch 0/600 to 0/750.
          T-480/Dn SR Construction of side drain and foot path to the road from Hantex to Fire force office ch 0/00 to 0/200.
          Sivagiri Festival 2011-12: Jungle clearance and drain clearance to Varkala- Kallambalam road from Km 5/000 to 11/400
          Sivagiri Festival 2011-12: Jungle clearing and drain clearing to Sivagiri- Sivagiri H S Thoduway road
          T No 123 Re-Construction of island at Sreemoolam club Junction in Vazhuthakkadu
          T No 125 Construction of culvert ,side drain and providing covering slabnear poojappura round road.
          T No 124 Providing missing covering slab to drains in various roads under City Roads Section No 2 Tvpm
          T No 126 Rectification of rain cut berm by providing concreat to the road vazhuthacaud to DPI
          T No 127 Providing missing covering slab to drains in various roads under City Roads Section No 3 Tvpm
          T No 129 Construction of CC drain at Kuruvikkadu Junction in Vattiyoorkavu - Kulasekharam road
          T No 130 Construction of side drain in Plamoodu - Marappalam road
          T-481/Dn. SR REctification of side drain and foot path to Mettukada Music college road ch 0/00 to 0/200
          Sivagiri Festival 2011-12: Urgent repairs to Vilabhagom road Ch 0/000 to 3/900, Narikkal road Ch 0/000 to 1/200 and Puthenchanda- Chilakkoor road from 0/000 to 1/200
          Sivagiri Festival 2011-12: Urgent jungle clearing and drain clearing in Varkala- Parippally road from Km 0/000 to 5/000
          Sivagi Festival 2011-12: Urgent jungle clearing and drain clearing in Varkala- Parippally road from Km 5/000 to 11/600
          T No 132 D/W. Rectification of tar cut due to laying water supply pipe line by KWA along Plamoodu -Marappalam road.
          T-478/Dn. SR Construction of side drain and foot path to the nearest road from Kunjalimoodu Jn at ch 0/00 to 0/300
          T-473/Dn SR Construction of drain and foot path from St. Xaviers church road ch 0/500 to 1/100
          T-475/Dn SR Construction of drain from West Fort to Kanjiravilakam
          T-474/Dn. SR Resurfacing and side drain in Manacadu Valiyathura road ch 2/100 to 2/500
          Sivagiri Festival 2011-12: Jungle clearing and drain clearing to Varkala- Kallambalam from 0/000 to 5/000
          Sivagiri Festival 2011-12: Painting works to Kappil Bridge
          T No 133 D/W. Urgent Rectification works due to laying 11 KV UG cable by KSEB at Thoppuimukku Junction near Vattiyoorkavu .
          T No 131 D/W. Rectification of tar cut for laying 11 KV UG cable by KSEB from Cordial RMU unit to Vellayambalam along Vazhuthacaud - Vellayambalam road
          S/R- Construction of covering slabs on the existing drain at Keleswaram in Pallichal Vizhinjam road from ch: 1/500 to 2/000
          T-479/Dn. Construction of side drain and foot path to the road from DPI Womens college road ch 0/250 to 0/550
          T-476/Dn. SR Construction of side drain and foot path to the nearest road from LPS Thamalam ch 0/600 to 0/800
          T No 128 Re-Construction of dammaged culvert at Nanthencode junction in PMG - TTC road
          Providing 20mm bit Chipping carpet to Thiruvananthapuram-Vizhinjam road near Vizhinjam bus stand (old road)
          T-483/Dn. SR 2011-12. Construction of side drain and foot path at Cliff house road
          Reconsrtuction of damaged culvert in Pallichal Vizhinjam road at ch 8/600 to 8/700
          Urgent rectification work to Vattavila Pirayinmoodu road from ch: 1/000 to 2/000
          T-485/Dn. SR 2011-12- Construction of side drain and foot path in AKG Nagar at ch 0/00 to 0/450
          T- 482/Dn. Rectification of side drain and foot path to the road from Edapazhanji - Pangodu road ch 0/050 to 0/400.
          T-484/Dn.Construction of side drain and foot path near Nirmalabhavan school in PMG TTC road
          Sivagiri Festival 2011-12: Road marking to various roads
          T No 193 Urgent patch works to the road arround M.G.College.
          T No 190 D/W. Rectification works due to providing Water supply house connection by KWA in various roads under CRS No.1,Tvpm.for the period from 1/8/2011 to 30/10/2011..
          T No 191 D/W. Rectification works due to providing Water supply house connection by KWA in various roads under CRS No.2, Tvpm.for the period from 1/8/2011 to 30/10/2011..
          T No 192 D/W. Rectification works due to providing Water supply house connection by KWA in various roads under CRS No.3, Tvpm.for the period from 1/8/2011 to 30/10/2011..
          T.No.184 D/W Rectification of tar cut due to laying pipe lines by KWA in SS Kovil road and Vazhuthacaud - Thycaud road.
          T No 185 D/W. Rectification of tar cutdue to laying KWA pipe line in Jagathy - Edapazhinji and Jagathy - Poojappura road.
          T No 186 D/W. Rectification works due to laying 11 KV UG Cable by KSEB at Elamthengu - Cheriyadi and Cheriyadi -Chettiyarumukku (Attupuram) road in Kalady south road road.
          T No 188 D/W. Rectification of tar cut due to providing 11 KV UG Cable by KSEB to Spencer - Punnen road and Pulimoodu - Govt.Press road. Kalady south road road.
          T No 189 D/W. Rectification works due to Providing HT Cable by KSEB to the road from Nandhavanam in front of LBS Centre.
          T No 183 D/W. Rectification of tar cut for laying 11 KV XLPE Insulated UG Cable by KSEB at Technical Education Structure road along Padmavilasom road.
          T-466/Dn. Deposit work. Thachottukavu - Mangattukadavu road due to laying of GI clean water pipe by KWA.
          T-451/Dn. Upgradation of carriageway by providing 20mm chipping carpet to Karamoodu Plavara Thiruvalloor Andoorkonam road from 0/00 to 2/800
          T-445/Dn 13 th Finance commission M&R MDR Providing 20mm chipping carpet with seal coat to Vembayam Pallippuram road 9/00 to 10/100.
          T-446/Dn. 13 th Finance commission 2011-12. M&R MDR Providing 20mm CC with seal coat to Azhoor Perumathura road km 0/00 to 1/600
          T-458/Dn. Reconstruction of damaged culvert in Vithura - Bonacadu road at km 7/400.
          T-454/Dn. Upgradation. Providing 20mm chipping carpet to Vithura Bonacaud road km 15/00 to 19/00
          T-464/Dn. Construction of CC drain in Priyadarsini Prasanth Nagar road ch 0/00 to 1/500.
          O/R 2011-12 Urgent patch repairs to Mannanthala-Powdikonam road ch 0/000 to 3/000 km.
          T-443/Dn.!3 th Finance commission M&R MDR Providing BM& BC to road around Gandhi park
          T-455/Dn. Providing 20mm bit chipping carpet to Ambalab Vengode road km 3/600 to 3/960.
          T-459/Dn SDF for MLA 2011-12. Nemom Assembly constituency. Construction of Melamcode Karumam road.
          O/R 2011-12 Urgent patch repairs to Sreekariyam- Akkulam road ch 1/500 to 3/500km.
          O/R 2011-12 Urgent patch repairs to VELI – VENPALAVATTOM road ch 0/000 to 1/500 km
          T-452/Dn. Upgradation.Providing 20mm chipping carpet to Kazhanadu road (Nedumangadu Vattappara road km 0/00 to 5/00)
          T-450/Dn Upgradation of carriageway of Thirunagar Pangapara road km. 0/00 to 1/00
          T-456/Dn Construction of cement concrete drain between km 7/500 to 8/200 of Nagaroor Kallambalam road.
          O/R 2011-12 Urgent patch repairs to Sreekariyam- Akkulam road ch 0/000 to 1/500km
          T-460/Dn. Releasing water stagnation - Constructing drain in Udayankulangara Kulathoor - Chavady road bet km 5/500 and 7/00
          Construction of New Kundamankadavu Bridge across Karamana River.
          O/R 2011-12 Urgent patch repairs by providing 20mm bit chipping carpet to CHEKKALAMUKKU- SOCIETY Jn
          T-444/Dn13 th Finanance Commission 2011-12. M&R MDR Providing 20mm chipping carpet with seal coat to Azhoor Perumathura road km 1/600 to 2/600.
          T-448/Dn-Upgradation of Chittalloor road
          T-465/Dn. Deposit work Rectification works at PMG Nalanda road for laying SW pipe by KWA.
          Rectification of damages in existing masonry drain and replacing damaged cover slabs at Chakkalavilakom Junction
          T-457/Dn. Reconstruction of damaged culvert in Vithura Bonacaud road at km 14/500.
          T-425/Dn. TVM Corporation Works 2011-12. Resurfacing to Vayyamoola road ch 0/00 to 1/200 and Thazhasheri road ch 0/00 to 0/500.
          Urgent patch repairs to Vettoor- Panayilkadavu - Vilabhagom- Thannimood road from 0/000 to 3/500
          Varkala- Kappil road from Ch 0/000 to 5/000
          Police Station - Tholikkuzhy road from Ch 0/000 to 2/600
          Edava- Kappil road Ch 0/000 to 2/000
          T- 449/Dn.Improvements to Vanchiyoor Njarakattuvila road (Karavaram road) km 0/00 to 2/00
          T-436/Dn. TVM Corporation Works 2011-12. Improvement to Ayyankali Nellikuzhy road ch 0/00 to 1/250 and Arapura lane 0/00 to 1/250.
          Urgent rectification works to Chempoor road from km 7/500 to 10/000
          Urgent patch repairs to Chempoor road from km 7/500 to 10/000
          Urgent patch works to Mandapathinkadavu Vazhichal road between km 2/800 to 3/200
          Urgent patch repairs to Chulliyoor Chadachmarthandam road Ch 5/200 to 6/050
          Urgent patch works to Pongumoodu Aruvikara temple road km0/000 to 2/000
          Urgent patch repair works to Amaravila Karakonam road Km 5/000 to 7/050.
          Urgent rectification to Ottasekharamangalam-Olattimoodu-Valiyavazhi road bet. ch.1/500 to 3/000
          Urgent Bit Chipping carpet works to N.S road between km 35/000 to 36/000
          Urgent patch repairs to Mandapathinkadavu Vazhichal road km 3/200 to 3/600
          Urgent patch works to Mandapathinkadavu -Vazhichal road Km 3/600 to 4/000
          Urgent patch repair works to Mandapathinkadavu Vazhichal road km 4/000 to 4/340
          Urgent patch repairs to Muttakad Kovalam road between km 0/000 to 1/600
          T- 428/Dn. TVM Corporation Works 2011-12. Resurfacing to Kannamoola community hall to All Saints Veli road km 0/00 to 0/500 , Vettucadu St. Sebastian church road km. 0/00 to 0/400.
          T-442/Dn.TVM Corporation Works 2011-12.Resurfacing to Chithra Nagar ch 0/00 to 0/300 & Santhosh Nagar road ch 0/00 to 1/00.
          T-441/Dn. TVM Corporation Works 2011-12.Resurfacing in Stationkadavu Meenakshikovil FCI road and Stationkadavu Santhynagar Attinkuzhi road.
          Urgent patch repairs to Balaramapuram Vizhinjam road kn 0/000 to 2/000
          Urgent rectification work to Amaravila Ottasekharamangalam between 11/600 to 12/200
          Urgent patch repairs to Aithiyoor Balaramapuram road between km 0/000 to 2/000
          Rectification of damages to Koliyakode culvert in Pappanamcode - Kottoor road
          Urgent patch repairs to Pappanamcode Kottoor road 0/000 to 3/200
          Urgent B.T patch work to Kachery road , Court road and Neyyattinkara Moolaikonam road
          Urgent patch repairs to Aithiyoor Balaramapuram road between km 2/000 to 4/000
          Urgent patch repairs to Vellayani Lake road between km 0/000 to 1/500
          Urgent rectification to Ottasekharamangalam-Olattimoodu-Valiyavazhi road bet. ch.0/000 to 1/500
          T- 423/Dn. TVM Corporation Works 2011-12.Resurfacing of road connecting Enchakkal via Crime branch offfice to Palkulangara ch 0/00 to 1/200, NH bye pass opposite to Ananthaputi Hospital and Manava Nag
          T-422/Dn TVM Corporation works 2011-12. Resurfacing of Sreekanteswaram Temple ground surrounding road NSS Karayogam road ch 0/00 to 0/475, Arakkadamukku to Pandarathoppu road ch 0/00 to 0/235, Passpor
          T- 424/Dn. TVM Corporation Works 2011-12. Resurfacing to the Meppally garden lane ch 0/00 to 0/270,Thulayil lane road and Madhava mangalam road ch 0/00 to 0/580 by providing 40mm chipping carpet.
          T-427/Dn. TVM Corporation Works 2011-12. REsurfacing to the road from NS Depot to Puthepalam ch 0/00 to 0/4800, Market road , Bye road and road from Market Jn to Puthen road ch 0/00 to 0/900, St Xavie
          T-429/Dn. TVM Corporation Works 2011-12. Resurfacing to Vettukadu church Premeier Jn.Providing BM&BC from ch 0/00 to 0/850.
          T-431/Dn TVM Corporation Works Resurfacing to Karikkakaom Kolaperuvazhi Kavinkulangara road 0/00 to 1/350.
          T-438/Dn. TVM Corporation Works 2011-12. Strengthening of carriage way and providing 40mm maccadam to Rajeev Nagar road & Manvila Irappinmukkham Aluvila Highway road.
          T-439/Dn. TVM Corporation Works 2011-12.Resurfacing work to Kallingal Kallupalam Attinkuzhi road & Attipra Melekonam Madathivila road
          T-434/Dn. TVM Corporation Works 2011-12.Resurfacing to Pettaha Railway palam road ch 0/00 to 0/600, Mutharamman covil road Kerala Kaumudi road ch 0/00 to 1/00 providing 40mm chipping carpet.
          T-433/DnTVM Corporation works 2011-12.Resurfacing to Esalayam Marakavilakom road 0/00 to 0/750
          T-437/Dn TVM Corporation Works 2011-12. Resurfacing to Prasanth Nagar Housing Colony road km 0/00 to 2/00.
          T-432/Dn TVM Corporation Works 2011-12.REsurfacing in Thoppil lane,Anayara road km 0/00 to 1/00.
          T-430/Dn TVM Corporation Works 2011-12. Resurfacing to Vettukadu BalaNagar Beach road km. 0/00 to 0/800.
          T-435/Dn TVM Corporation Works 2011-12.Resurfacing to Kannammoola Vidhyadiraja school road 0/00 to 0/900, Swathy Nagar road km 0/00 to 0/800 and Pattoor EMS Nagar Vazhappana road km 0/00 to 0/650 by p
          T-440/Dn. TVM Corporation Works 2011-12.Resurfacing to ChithraNagar Smasanam Highway road & Karimanal Koralamkuzhy Bypass road
          T-426/Dn. TVM Corporation Works 2011-12.Resurfacing inLeena road ch 0/00 to 0/250 by providing 40mm chipping carpet.
          T-421/Dn. TVM Corporation Works 2011-12. REsurfacing of Kuthiravattom road km 0/00 to 0/275, Chettikulangara temple road 0/00 to 0/185, Pullani lane and Rishimangalam temple road 0/00 to 0/485, KSFE J
          T-405/Dn. TVM Corporation Works 2011-12. Resurfacing to Aryankuzhy Nalanda road ch 0/00 to 1/050, Aryankuzhy Sreesastha- Erakulangara Temple road ch 0/00 to 1/00 by providing 40mm chipping carpet.
          T- 415/Dn. TVM Corporation Works 2011-12. Resurfacing to the Thaikapally road in ch 0/00 to
          T-404/Dn TVM Corporation works 2011-12. REsurfacing in V Man Nagar to Pazhanchira road and Bilal Nagar road by providing 40mm chipping carpet.
          T- 419/Dn. TVM Corporation Works 2011-12. Resurfacing the road South Nada and Thamman Street km. 0/00 to 0/570.
          T - 406/Dn. TVM Corporation Works 2011-12. Resurfacing to Konchiravila school to Kamaleswaram school connected byeroad bye road by providing 40mm chipping carpet.
          T-420/Dn TVM Corporation works 2011-12. Resurfacing the road from Hantex jn to Panavila road ch 0/00 t0 0/300, Thyvila Dharmalayam road km 0/00 to 0/300, Marakkada Aristo road.
          T-417/Dn TVM Corporation Works 2011-12. REsurfacing to the Vallakadavu Puthenpalam road ch 0/00 to 0/400, Sreevarahanagar road 0/00 to 0/355, Thavalode lane- Parambil Nagar road ,Sreenagar 2 nd Cross
          T- 414/Dn TVM Corporation Works 2011-12. Resurfacing of Noorul Islam Arabic college to Azad Nagar road ch 0/00 to 0/480 and MSS Jn to Milk colony road via High School ch 0/00 to 1/060 by providing ch
          T-418/Dn. TVM Corporation Works 2011-12. Resurfacing the East Nada of Padmanabhaswamy temple by providing BM& BC at ch 0/00 to 0/165 Kallampally to Garage road ch 0/00 to 0/625 providing 40mm chipping
          T- 416/Dn TVM Corporation works 2011-12. Resurfacing the Perunelly Jn to paruthykuzhy road by providing BM & BC ch 0/00 to 0/165.
          T-412/Dn TVM Corporation Works 2011-12Resurfacing the Puthenpally Jn SM Lock road by providing BM& BC ch 0/00 to 0/165.
          T- 410/Dn. TVM Corporation works 2011-12. Resurfacing of Kuttikkal Sastha temple road 0/00 to 1/400 by providing 40mm chipping carpet
          T-413/Dn TVM Corporation works 2011-12.Resurfacing work Sastha Nagar - Manilkyavilakom JN - Azad Nagar road by providing 40mm chipping carpet
          T- 409/Dn. Resurfacing the road around Manacaud market by providing 40mm chipping carpet.
          T- 411/Dn TVM Corporation Works 2011-12. Resurfacing the road from Kuriyathi Sreenagar road and Pavithra Nagar road by providing 40mm chipping carpet
          T-403/Dn. TVM Corporation works 2011-12. Resurfacing to Soorya Recidence Association road ch 0/00 to 1/100,by providing 40mm chipping carpet.
          T-407/Dn. TVM Corporation Works 2011-12.Resurfacing in Mangottukadavu -Meleppuram road 0/00 to 0/215, Palathukadavu road 0/00 to 0/300, Panthaplavu road 0/00 to 2/00 Attukal Keezhanpukadavu road km 0e
          T-402/Dn TVM Corporation works 2011-12.Resurfacing to Poonthura xchool Jn to Cheriyamuttom market road 0/00 to 0/900 and Madhavan road 0/00 to 0/360 by providing 40mm chipping carpet
          (City) Conveyance of Bulk Bitimen from BPCL Ambalamughal to various work site under the Roads City Sub Dn. Tvpm for 2011 - 12.
          (NDD) Conveyance of Bulk Bitimen from BPCL Ambalamughal to various work site under the Roads Sub Dn.Nedumangadu for 2011 - 12.
          (ATL) Conveyance of Bulk Bitimen from BPCL Ambalamughal to various work site under the Roads Sub Dn.Attingal for 2011 - 12.
          (Tvpm) Conveyance of Bulk Bitimen from BPCL Ambalamughal to various work site under the Roads Sub Dn. Tvpm for 2011 - 12.
          T- 408/Dn. Resurfacing in Power house Marakkada road ch 0/00 to 0/400, SKP Timbers Manacaud market road ch 0/00 to 0/400, Killipalam - Karuppattikada market road 0/00 to 0/800 by providing 40mm chipp
          Urgent patch repair works to Chanichakkadavu Mylam Aruvikkara road KM 0/000 to 2//000(Re tender)
          Urgent patch repair works to Chanichakkadavu Mylam Aruvikkara road KM 2/000 to 4/000(RE tender)
          Re construction of damaged c c drain at Kacheri junction in Nedumangad Town Branch Road(re tender)
          (NTA) Conveyance of Bulk Bitimen from BPCL Ambalamughal to various work site under the Roads Sub Dn.Neyyattinkara for 2011 - 12.
          T-390/Dn. Resurfacing the road from Popular Kuzhal Jn 0/00 to 0/400, Thaliyal Santhiyan Nagar road 0/00 to 0/350, Sivankovil road o/oo to 0/450, opposite road of Thaliyal Mahadeva temple .
          T-391/Dn. TVM Corporation works 2011-12.REsurfacing the road from Kulathara Puliyarathoppu road ch 0/00 to 0/950, Kavali Jn,Maruthoorkadavu road 0/00 to 0/625,Vazhavilakom Madathuveetil temple 0/oo to
          T-394/Dn TVM Corporation works 2011-12 .Resurfacing work in Vandithadam Pappanchandi road bet ch 0/00 to 1/223 and Poonkulam KS road bet ch 0/00 to 0/810.
          T-395/Dn TVM Corporation Works 2011-12.Resurfacing in Venganoor Neelakeshi- Mullumukku road ch 0/00 to 1/500.
          T-396/Dn. TVM Corporation Works 2011-12 Resurfacing the road in Kidarakuzhy Santhipuram road ch 0/00 to 1/650 and providing 40mm chipping carpet in Mukkola - Dweep - Panchavadi- Payarummoodu road km 0
          T-393/Dn. TVM Corporation works 2011-12. Resurfacing in Menilam Punjakkari -Vandithadam road km 0/00 to 2/300.
          T-397/Dn TVm Corporation works 2011-12.Kottappuram ward. Resurfacing of Nellikkunnu - Plavilakodu temple road by providing 40mm chipping carpet ch 0/00 to 1/230 and Thulavila Kaikulam Marayil Nagar ro
          T-398/Dn. TVM Corporation Works 2011-12.Resurfacing by providing 40mm chipping carpet to Vizhinjam market- Chennavilakom Ramesankulam road ch 0/00 to 0/900, Township Madrassa Vaduvachal road 0/00 to 0
          T-399/Dn. TVM Corporation Works 2011-12.Harbour ward. Resurfacing by providing 40mm chipping carpet to Vizhinjam Harbour Light house road 0/00 to 0/850, Township Vaduvachal road 0/00 to 0/800.
          T-400/Dn. TVM Corporation works 2011-12. Resurfacing the road by providing 40mm chipping carpet in Idavilakom Panamthura road 0/00 to0/425, Pachalloor Kuppichivila road 0/00 to 0/410, Nedumam Kannamko
          T-401/Dn.TVM Corporation Works 2011-12. Thiruvallom ward. Resurfacing in Thiruvallom Theatre Mannam Nagar Kumily road 0/00 to 1/700, Pachalloor LPS Thonikkadavu road Kavinpuram road 0/00 to 1/00 by p
          T-392/Dn.TVM Corporation works 2011-12.Resurfacing work in Amalakkunnu- Chemmannuvila Thoppumukku, Sakalanthi road 0/00 to 1/800,Ambalakunnu- Edagramam road-Melamcode road 0/00 to 0/370..
          T-388/Dn.TVM Corporation works 2011-12. Resurfacing work in Pappanamcode Pourasamithy road, Sainagar road, Mangarathoppu road, Kalpaka gardens road 0/00 to 1/500,Neeramankara- Panayaravila Anandh na0
          T-384/Dn TVM Corporation works 2011. Resurfacing the road from Kunnupuzha Das Nagar road ch 0/00 to 0/900
          T-389/Dn. TVM Corporation Works 2011-12. Resurfacing work to Sathyan Nagar road, Stadium road 0/00 to 1/510,PappanamcodeParayilkadavu road 0/00 to 0/300, Koliyakkode culvert Jn Elavilnvila road km 0/0
          T-385/Dn TVM Corporation works 2011-12. Resurfacing in Thampuran Nagar Althara road km 0/00 to 1/00 , Karaikamadapam Ammaveedu road 0/00 to 0/400, Nemom police quarters road 0/00 to 0/200, Kollamkonam
          T-386/Dn. TVM Corporation Works 2011-12.Resurfacing in Nemom JP lane Plavila road 0/00 to 0/500,Old Karaikkamandapam-Ponnumangalam-Transformer road km 0/00 to 0/400,Nemom police quarters road 0/00 to
          Conveyance of Packed Bitimen from BPCL Ambalamughal to Roads Division Tvpm for 2011 - 12.
          Conveyance of Packed Bitimen emulsion from BPCL Ambalamughal to Roads Division Tvpm for 2011 - 12.
          Up-11-12 of Carriageway of Thirunagar Pangappara Road Km.0/00 to 1/00.
          Up - 11-12 of Carriage way of Pullukad Colony Pullukad Quarry - NH Bye pass road Km 0/00 to 1/200.
          T-382/Dn. TVM Corporation Works 2011-12. REsurfacing the road by providing 40mm chipping carpet over BT surface to the road from Vattavila ch 0/00 to 0/800 and ch 0/00 to 1/200 in Lanka road.
          T-383/Dn. TVM Corporation Works 2011-12. Resurfacing the road from Trivikramangalam Methodukuzhi road ch 0/00 to 0/700.
          T-387/Dn. TVM Corporation Works 2011-12. Resurfacing the road from Vattavila MSP Nagar road ch 0/00 to 0/900 and Pulluvila road ch 0/00 to 1/300.
          T-468/Dn. Widening of road in Kannamoola Medical college road 0/00 to 1/600.
          Urgent patch repairs to 9th Mile T S road to Aruvikkara KM 0/000 to 1/200 (re tender )
          T-472/Dn. 13 th Finance commission 2011-12. M&R MDR Providing 20mm bit chipping carpet to Parippally Madathara road km 7/100 to 8/400.
          T-471/Dn 13 th Finance commission 2011-12.M&R MDR providing 20mm chipping carpet to Parippally Madathara road km 6/00 to 7/00.
          T-469/Dn. Widening of road from Kannamoola to Mulavana road ch 0/00 to 1/00.
          T-470/Dn.13 th Finance commission 2011-12.M&R MDR Providing 20mm chipping carpet from km 5/00 to 6/00 of Paripplly Madathara road.
          T-467/Dn K R F Board Reconstruction of bridge at Murinjapalam. Widening of Pallimukku Kannamoola road ch 0/00 to 0/600
          U rgent patch repairs to 9th Mile T S road to Aruvikkara KM 2/400 to 3/400 ( re tender )
          O/R urgent Bit CC to Malayinkil – Pappanamcodu road 0/000 to 2/500 km
          Up gradation of Carriage way by providing 20mm bit CC to Azhoor-Perumathura road
          O/R 2011-12. Urgent repair by providing 20mm bit CC to Karamoodu – Plavara – Thiruvalloore – Andoorkonam road Km 0/200 to 2/000
          O/R 2011-12. Urgent repair by providing 20mm bit CC to Karamoodu – Plavara – Thiruvalloore – Andoorkonam road Km 2/200 to 3/400
          O/R urgent Bit CC to vilavoorkal- Pidaram Road ch 1/800 to 3/000 km
          13th Fin - Providing 20mm CC to Vamanapuram Chittar road from Km 11/200 to 12/00.
          13th Fin - Providing 20mm CC toKulappada Panacode Mannoorkonam road from Km 3/600 to 4/00.
          13th Fin -Resurfacing Balance work of Manacadu Konchiravila road
          13th Fin - Providing 20mm CC toPazhavangadi Uppidamoodu road
          13th Fin -Resurfacingthe road from Nandavanam to Panchapura Jn.
          13th Fin -Resurfacingthe road fromHousing board to Oottukuzhy
          13th Fin - Providing 20mm CC toAryanadu Kottakkakom road from Km.2/900 to 3/400.
          13th Fin - Providing 20mm CC to Irumba Kachani road km 0/00 to 1/300.
          13th Fin - Providing 20mm CC toVettamukku Pallimukku road Ch:0/00 to 0/90
          T-370/Dn. Resurfacing to roads inside PTP Nagar o/oo to 1/500.
          T-371/Dn Tvm Corporation.works 2011-12. Resurfacing to Padayani road ch; 0/00 to 1/200.
          T-374/Dn TVM Corporation Works 2011-12. Resurfacing of Kusakkodu- Ambalam East, West, South road ch 0/00 to 0/650.
          T-375/Dn. TVM Corporaation Works 2011-12. REsurfacing to Elangath Nagar Valiyavila road 0/00 to 0/550 and Ettayooorkonam Kuruvikkadu Karimankulam road 0/00 to 1/800.
          T-376/Dn. TVM Corporation Works 2011-12.Resurfacing the road from Nethaji Chengalloor- Vedankonam road ch 0/00 to 1/400 and Sasthanagar- Vevekanada Nagar road ch 0/00 to 1/00.
          T-378/Dn TVM Corporation Works 2011-12.Resurfacing of Valiyasala Gramam road ch 0/00 to 0/475, Thamaramel Kannavila road ch 0/00 to 0/825, and Valiyasala city road
          T-379/Dn TVM Corporation Works 2011-12.Resurfacing the road opposite Krishnankovil ch o/oo to 0/850 and the road in front of Jagathy EB and Thycaud SBT ch 0/00 to 0/900 by providing 40mm CC
          T-381/Dn TVM Corporation Works 2011-12. REsurfacing the road by providing 40mm chipping carpet over BT surface to the road from NSS Jn Jagathy road ch 0/00 to 0/600,Suryanagar and Judi road.
          Clearing chocked up drain and clearing light jungle in Thiruvanathapuram Shencotta Road form KM 26/000 to 28/000
          T-363/Dn TVM Corporation Works 2011-12. REsurfacing to Rani lane , MG Nagar Road Winners Nagar road 0/00 to 1/700
          T369/Dn TVM Corporation Works 2011-12 Resurfacing to Mullanchani Kadayilmdampu road 0/00 to 1/500 and Pularinagar Thattassery Thittamangalam road 0/00 to 0/600
          T-366/Dn. TVM Corporation 2011-12. Resurfacing to Kalingavila Punnamkonam Kachni road km 0/00 to 0/750.Sree Ramakrisna Asramam lane 0/00 to 0/700.
          Urgent patch repair to Kazhanad(Vattappara Nedumangad road) 5/400 to 6.750
          T-367/Dn. TVM Corporation 2011-12. Resurfacing to Panchami lane - Mathavilakom road ch 0/00 1/200.
          Resurfacing the road providing 20mm chipping carpet over BT surface to the road from Chadiyara Nagarukavu 0/00 to 0/900 and Nethaji Nagar 0/00 to 0/800.
          13th Fin - Providing 25mm BC to TS road from km.17/00 to 18/200.
          T-372/Dn Resurfacing to Kattachal road & Iruvarthala road km 0/00 to 1/200.
          T-373/Dn. Resurfacing to Udiyannoor Thampuran road km 0/00 to 0/850.
          T-380Dn TVM Corporation Works 2011-12. Resurfacing of Kalpalayam road ch 0/00 to 0/565, HSLPS road ch 0/00 to 0/230 and Sasthrinagar road ch o/oo to 0/800.
          Urgent patch rep-air works to Kazhanad(Vattappara Nedumangad road) from KM 4/100 to 5/400
          T-368/Dn TVM Corporation. Works 2011-12. Resurfacing to Eswariyammancovil road Krishnapillaa Nagar road 0/00 to 0/950 and Kaavalloor- Road behind the Vattiyoorkavu Govt HS 0/00 to 1/500.
          urgent patch to 9th Mile T S road to Aruvikkara KM 0/000 to 1/200
          Urgrnt repairs to Vamanapuram-Chittar Road km 7/600 to 8/800
          T-362/Dn. TVM Corporation Works 2011-12. Resurfacing to Ayoorkonam Madathuvilakom road ch 0/00 to 0/700 and Sasthanagar Kunnumpuram road 0/00 to 0/800.
          T-364/Dn. TVM Corporation Works 2011-12. Resurfacing to Nettayam Puthoorkonam - Melathumele road 0/00 to 1/600 and Srenagar- Vettikonam road 0/00 to 0/700.
          Re construction of damaged c c drain at Kacheri junction in Nedumangad Town Branch Road
          Re construction of damaged Retaining wall at KM 0/700 of Karakulam-Mullassery Junction-Vengod
          Urgent patch repair works to Karingal Colony Deviation road (PSLV) from KM 1/750 to 2/200
          T-365/Division. Resurfacing to Manikanteswaram- Kailasanagar- Melathumele road km 0/00 to 1/600 and Irukunnam Mudippura road 0/00 to 0/650.
          Urgent patch repair works to Kazhanad(Vattappara Nedumangad road) from KM 2/750 to 4/100
          Urgent repairs to Vamanapuram-Chittar Road km 6/000 to 7/500
          Urgent repairs to Vamanapuram-Chittar Road km 8/900 to 10/100
          Urgent patch repairs to Vamanapuram-Chittar Road km 10/100 to 11/200
          T-355/Dn. TVM Corporation Works 2011-12. Resurfacing the road (Thycaud Ward) Governtment Arts College, sasthan Kovil C.V Raman Grandhasala road at ch 0/00 to 0/500 and NC Hospital to Muslim school jun
          Urgent patch repairs to 9th Mile T S road to Aruvikkara KM 1/200 to 2/400 ( Re Tender )
          Urgent Patch repairs to Thannimmode Perayam Chellanchi Road KM 0 /000 to 1/500
          Urgent repairs to Thannimmode Perayam Chellanchi KM 1/500 to 3/000
          Urgent patch repairs to Chayam-Peringamala Road km 6/200 to 8/500
          T-353/Dn TVM Corporation 2011-12. Improvements to Varambasseri Vikas Lane ch 0/00 to 0/650
          T-356/Dn.TVM Corporation Works 2011-12.Resurfacing the road from Vazhuthacadu Ward CSm Nagar Thampuran Nagar ch 0/00 to 0/700, Chembaka Nagar road ch 0/00 to 0/600 ) and the road behind Womenss colleg
          T-358/Dn TVM Corporation 2011-12. Resurfacing to Maruthenkuzhi Market- Thachankara road km0/00 to 0/750.
          T-359/Dn. TVM Corporation Works 2011-12. Resurfacing to Banglavila road ch 0/00 to 1/600
          T-360/Dn. TVM Corporation works 2011-12. Resurfacing to Oolampara-Abhayanagar road km 0/00 to 0/900 and GG nagar km 0/00 to 0/850
          Urgent patch repair works to Kalathukal-Uriyacode Road form KM 2/000 to 4/000
          T-351/EE/2011-12. TVM Corporation Works 2011-12. Resurfacing to Nanthencode Baence compound ch; 0/00 to 0/800
          T-347/Dn. TVM Corporation Works 2011-12. Resurfacing the road Vazhuthacadu Ward CSM Nagar road (ch 0/00 to 0/600) and MP Appan road (ch;0/00 to 0/500) By providing chipping carpet
          T-361/Dn TVM Corporation Works 2011-12.Resurfacing toDevapalan Nagar Masjid road ch 0/00 to 0/700
          T-35/Dn. TVM Corporation Works 2011-12. Resurfacing of Nanthancode Wats lane km 0/00 to 0/750 and Manjadivila road km 0/00 to 0/650.
          T- 352/Dn TVM Corporation Works 2011-12. Improvement to PMG - Brigadiar lane University road BM&AC .
          Reconstruction of retaining wall at Ambalathinkala Thoongapara road km 1/150
          T-354/Dn. TVM Corporation Works 2011-12. (Vazhuthacadu ward ) road from KBAC Junction - Lenin Nagar at ch; 0/00 to0/900 and Naduvanam Bodheswaram road at ch 0/00 to 0/900 and Nandavanam Bodheswaram ro
          Urgent patch repairs to Nedumangad Shorlacode Road from km 14/700 to 16/500
          T-342/Division. TVM Corporation Works.2011-12. Resurfacing to Harvipuram 1 st and 2 nd reach 0/00 to 0/800, Jayaprakash lane Pullukulam road ch; 0/00 to 1/000, Dershan Nagar and AKG nagar road.
          T-346/Dn.TVM Corporation Works 2011-12 REsurfacing road around Sasthamangalam Mahadevashethram and Kaduvetti -Surya Nagar road km 0/00 to 1/200, Sreerangam lane and connected roads km 0/00 to 1/00.
          T-347/Dn TVM Corporation Works 2011-12.Resurfacing to Panickers lane - MLA road km 0/00 to 1/500 and Swathy Nagar 2nd street to SAP camp km 0/00 to 1/000.
          T-348/Dn. TVM Corporation Works 2011-12. Resurfacing to Bhagavathy Nagar road km. 0/00 to 2/100.
          T- 349/Dn TVM Corporation Works 2011-12.Resurfacing Panddit Colony-Kuravankonam road 0/00 to 1/700 and Muthuswamy lane 0/00 to 0/450.
          Urgent patch repair works to Chanichakkadavu Mylam Aruvikkara road KM 0/000 to 2/000
          T- 345/Dn TVM Corporation Works 2011-12. Resurfacing to NCC road - Maruppancode bye road km 0/00 to 1/300
          Urgent patch repair works to Vithura-Bonaccord Road from KM 4/000 to 5/800
          T-344/Dn TVM Corporation Works 2011-12. Resurfacing to Bhagathsingh Nagar to Majinadu Puliyambikonam road ch; 0/00 to 1/300.
          Urgent patch repair works to Nedumangad Aruvikkara Road km 1/700 to 3/400
          Urgent patch repair works to Vithura-Bonaccord Road form KM 0/000 to 1/800
          Urgent patch repairs to Nedumangad Shorlacode Road from 8/500 to 10/000
          Urgent patch repairs to Nedumangad Shorlacode Road from 0/700 to 2/200
          Urgent patch repairs to Nedumangad Shorlacode Road from 2/600 TO 3/800
          Urgent patch repair works to Vithura-Bonaccord Road 2/000 to 3/700
          Urgent patch repair works to Vithura-Bonaccord Road 6/000 to 8/000
          Urgent patch repair works to vettinad velavoor road 4/400 to6/400
          Urgent patch repair works toKalathukal-Uriyacode Road from KM 0/000 to 2/000
          Urgent patch repair works to 8th Mile TS road to Aruvikkara o/ooo to 1/000
          Urgent patch repair works to Chanichakkadavu Mylam Aruvikkara road KM 2/000 to 4/000
          T-343/Dn TVM Corporation Works 2011-12.Resurfacing to Kudappanakunnu Devi temple to St. Thomas School ch 0/00 to 1/200.
          Urgent patch repair works to Nedumangad Aruvikkara Road km 3/400 to 5/100
          13th Finance Providing Bit CC to Parippally Madathara road Km 9/00 to 9/800
          Urgent patch repairs to Nedumangad Shorlacode Road from 10/300 to 12/500
          Urgent patch repairs to Nedumangad Shorlacode Road from 3/800 to 5/000
          Providing Bit-chipping carpet works to Main Central road KM 23/500 to 25/000
          13th Finance Providing Bit CC to Parippally Madathara road Km 6/00 to 7/100.
          Urgrnt patch repairs to Vellanad Road Km 1/200 to 3/900
          Urgent patch repairs to Vellanad Road Km 8/800 to 11/500
          Urgent patch repairs to Muthiyavila - Ottasekharamangalam Road Km 0/000 to 3/000
          13th Finance Providing 20mm CC toNjekkad Chavarcode road Km 1/500 to 3/00.
          13th Finance Providing Bit CC to Parippally Madathara road Km 7/100 to 8/400.
          13th Finance Providing 20mm CC toKannanmoola CSI Church to Kumarapuram in Nalumukku Medical College road
          13th Fin. Providing 20mm CC to Njekkad Chavercode road Km 3/100 to 4/460.
          13th Finance Providing 20mm CC toNedumangadu Karipoor road from Km5/100 to 5/950.
          13th Finance Providing 20mm CC toJawahar Nagar Road.
          13th Finance Providing Bit CC toParippally Madathara road Km 5/00 to 6/00.
          13th Finance Providing 20mm CC toThanpuranmukku Moolavilakom Pattoor road Including allied works.
          13th Fin. Improvements to Killi Thoongumpara road Ch 0?00 to 0/600.
          13th Fin - Providing 20mm CC toVembayam Pallipuram road Ch9/00 to 10/100.
          13th Fin. Const. of side drain for releasing water stagnation in Balaramapuram Vizhinjam road Ch:2/500 to 3/000.
          13th Fin - Providing 20mm CC to Ambalam Vengodu road Km 1/200 to 2/400.
          13th Fin. Con. of CC drain leading to Meerankadavu Bridge in almcodu Meerankadavu road.
          13th Fin - Providing 20mm CC to Azhoor Perumathura road Ch:1/600 to 2/600.
          KUNDAMANKADAVU STEEL BRIDGE-
          13th Fin 11-12 Raising the nExisting Carriage waybetweenKm1/00 and 2/00 in Eruthavoor Naruvamooduroad
          13th Fc.Con. of foot path by providing hand rails in front of Taluk Office Neyyattinkara Kaacheri road.
          13th Fin. Providing road Marking and sign board along Attingal Chirayinkil & Chirayinkil Korani road.
          13th Fin. Const. of side drain in Balaramapuram Poorar road between Km.12/00 to 12/400.
          T-341/Dn TVM Corporation Work 2011-12. Resurfacing by 40mm BM to Nethaji Boss Nagar road ch 0/00 to 1/400 and Kairali Nagar road 0/00 to 1/00
          T-339/Dn TVM Corporation Works 2011-12 Providing 40mm BM inPoonthu Kurukkan temple road ch 0/00 to 0/400
          T-340/Dn TVM Corporation Works 2011-12 Improvements to SCT Nagar - Chalakuzhi road km 0/00 to 0/900 and Puthenpally -Kunnamkulam road
          CULVERT near MARUTHANKUZHY BRIDGE
          T-335/Dn TVM Corporation Works 2011-12 Improvements to S N Nagar Choozhampala road BM&BC work
          T-336/Division. TVM Corporation Works 2011-12. Improvements to KJK Hospital Thattinakom road km 0/00 to 1/200 BM&BC WORK
          T-337/Dn TVM Corporation Works 2011-12. Resurfacing by providing 40mm BM to LIC lane Lekhsmi Nagar ch 0/00 to 1/400
          T-338/Dn TVM Corporation Works 2011-12 Improvements to Kumarapuram-Chitra Quarters Akkulam road ch 0/00 to 1/00 BM&BC
          T-332/Dn TVM Corporation works 2011-12. Strengthening of carriageway by providing 40mm maccadom to Powdikonam Panavila Subhash Nagar road km 0/00 to 1/700, Mukkilkada Avukkulam Valiyavila road km 0/00
          T-331/Dn TVM Corporation Works 2011-12 Strengthening of carriageway by providing 40mm maccadam to Kariyavattom Viyyattukonam Chirayil road km 0/00 to 1/250, Chempazanthy Aniyoor Temple road km 0/00 t
          T/334/Dn TVM Corporation Works 2011-12. Resurfacing to Udiyannoor Temple to Madathunada ch 0/00 to 1/200, Parakkodu Mundayakkadavu Madankovil road ch 0/00 to 1/00
          T-330/Dn TVM Corporation Works 2011-12 Strengthening of carriageway by providing 40mm maccadam to Chellamangalam Udayagiri Janatharoad km 0/00 to 1/300,Kariyam Market Randanchira road km 0/00 to 1/300
          T-333/Dn TVM Corporation Work 2011-12. Strengthening of carriage way by providing 40mm maccadam to Maruthumoodu Aruvikkarakonam Vattakkarikkakam road km 0/00 to 1/650 and Anandeswaram Edathara road km
          T-326/Dn TVM Corporation Works 2011-12 Improvements to Babuji Nagar Ayodhya Nagar road ch 0/00 to 1/050 BM&BCWORK.
          T-327/Division TVM Corporation Works 2011-12 Providing BM&BC Wwork in Kochulloor Pongumoodu road km 0/00 to 1/050.
          T-328/Dn TVM Corporation Works 2011-12. Providing BM& BC Work to Edavacodu Vallunni road km 0/00 to 1/00
          T-329/Dn TVM Corporation Works 2011-12. Providing BM& BC Work to Ravoorkonam Edavacode east road.
          13th Fin - Improvements to Valiyarathala Mukkumpalamoodu road Ch:0/00 to 0/600.
          13th Fin - Improvements to Valiyarathala Mukkumpalamoodu road Ch:0/600 to1/200.
          13th Fin - Providing 20mm CC to Veli Kadinamkulam road Km 0/00 to 1/100.
          JNNURM Rectification of trenched portion in Shanghumugham Veli road road from Kochuveli palli to Taitanium Factory Near Boat Club(IInd reach)
          TVM Corporation works 2011-12. Strengthening of carriage way by providing 40mm meccadam to Kazhakuttom Railway gate to Vettu road km 0/00 to 1/350, Nettyoorkonam LNCPE road km 0/00 to 1/3000
          T-323 TVM Corporation works 2011-12 Strengtening of carriage way by providing 40mm meccadam to Mele Chanthavila Annoor Mangattukonam road km 0/00 to 1/250 and Ullorkonam Nalumukku road km 0/00 to 1/20
          T-324 TVM Corporation works 2011-12. Strengthening of carriage way by providing 40mm maccadam to Manvila Ambedkarpuram colony road 0/00 to 1/400 and Pangappara Muttlumoodu Perunthara road km 0/00 to 1
          T-325 TVM Corporation works 2011-12 Strengthening of carriage way by providing 40mm Meccadam to Mele Chanthavila Marappancode Andoorkonam road km 0/00 to 1/150, Kattaikonam Ariyottukonam road km 0/0,
          13th Fin - Providing 20mm CC toAmbalam Vengode road Km2/400 to 3/600.
          13th Fin - Providing 20mm CC to Kaniyapuram Chirayinkil road Km 1/200 to 2/100.
          13th Fin - Improvements toKilli Thoonganpara road Ch:0/600 to 1/200.
          Urgent patch repairs to Mandapathinkadavu -Vazhichal road Km 2/800 to 3/200
          Urgent patch repairs to Pongumoodu - Aruvikara Temple road Km 0/000 to 2/000
          Urgent patch repairs to Mandapathinkadavu -Vazhichal road Km 3/200 to 3/600
          Urgent patch repairs to Mandapathinkadavu -Vazhichal road Km 4/000 to 4/340
          Urgent patch repairs to Mandapathinkadavu -Vazhichal road Km 2/400 to 2/800
          Urgent patch repairs to Chulliyoor Chadachimarthandam road Km. 5/200 to 6/050
          13th Fin.Providing 20mm CC to Azhoor Perumathura road Km.0/00 to 1/600.
          Urgent bit.chipping carpet to Thattamukku Mayam road bet ch. 1/800 to 2/600
          Urgent patch repairs to Mandapathinkadavu -Vazhichal road Km 3/600 to 4/000
          Urgent patch repairs to N-s road bet. Ch. 27/500 to 29/000
          Urgent patch repairs to N-s road bet. Ch. 26/500 to 27/000
          Urgent patch repairs to N-s road bet. Ch. 35/000 to 36//000
          R/P. Providing 20mm chipping carpet to Palode - Anad Branch road from km. 0/000 to 5/250.
          Ordinary repairs to Panayara- Chavercode road from Km 0/000 to 1/200
          13th Fin. Avoiding water staganation by road raising and Const. of drain in Sreekariyam Kulathoor Kazhakuttam road km.0/350 to 0/650.
          Ordinary repairs to Panayara- Chavercode road from Km 1/200 to 2/950
          13th Fin.Providing 20mm CC to 16th mile TQ road to Vencodu road Km 0/00 to 1/200.
          Ordinary repairs to Venjaramood- Attingal road from Km 3/500 to 5/000
          Urgent patch works to Muttakkad Kovalam road bet. ch 0/000 to 1/600
          Urgent rectification works to Vlathankara Avanakinvila road at ch. 0/000 to 1/500
          Urgent patch works to Vellayani Lake road bet. km 0/000 to 1/500
          13th Fin. Providing 20mm CC to Kaniyapuram Puthenthoppu road km 1/600 to 3/00.
          Urgent rectification works to Vlathankara Avanakinvila road bet ch 1/500 to 2/950
          Urgent patch repairs to Ottasekharamangalam-Olattimoodu-Valiyavazhi road bet. ch.0/000 to 1/500
          13th Fin.Providing 20mm CC to Kariyavattom Chengottukonam road Km1/100 to 2/200.
          Reconstruction of drain at Neyyattinkara Moolaikonam road ch. 1/200 to 1/300
          Constructin of drain at Idagramam in Karumam Thiruvallam road
          Reconstruction of Canal culvert in Kamukincodu- Venpakal road at Kusavoorkottukonam
          Removal of silt and dumped waste at Karumam Thiruvallam road bet. km 0/000 to 3/000
          Urgent patch repairs to Ottasekharamangalam-Olattimoodu-Valiyavazhi road bet. ch.1/500 to 3/000
          Urgent rectification of side drain in Kalliyoor Kakkamoola road bet. ch 0/000 to 2/000
          SDF for MLA's - Improvements to Chirayil road in Edava Panchayath
          Reconstruction of damaged culvert in Arattukuzhi - Amboori - Neyyardam road (Arattukuzhi Junction) bet Km 1/400 to 1/500.
          Construction of drain in Panayarakkunnu Thannimoodu road Km 1/500 to 1/600.
          Reconstruction and raising of side drain in Balaramapuram Poovar road Km 3/800 to 3/900.
          Urgent rectification works to Amaravila Karakonam road Km 5/000 to 7/050.
          Urgent rectification works to Amaravila Ottasekharamangalam road between Km 11/600 and 12/200.
          Urgent patch work to Ayithiyoor Balaramapuram road Km 0/000 to 2/000.
          Urgent rectification works to Ayithiyoor Balaramapuram road Km 2/00 to 4/00.
          Urgent repairs of C.C drain and R.C.C slab in Pravachambalam Ooruttmbalam road Km 0/000 to 3/200.
          Urgent patch work to Katchery road, Cort road and Neyyattinkara Moolaikonam road.
          Maintenance of damaged culvert in Chulliyoor Chadachimarthandam road near Kottakkal bet Km 5/00 and 6/00.
          Urgent patch work to Balaramapuram Vizhinjam road in between Km 0/000 to 2/000.
          216-13th Fin.Avoding waater stagnation by road raising and Cont. of drain in Sreekariyam Kulathur Kazhakuttam road 2/650 to 3/180.
          Urgent patch repairs to Thannimmodu Perayam Chellanchi road KM 3 000 to 4 200
          Urgent patch repairs to Thannimmodu Perayam Chellanchi road KM 4 200 to 5 400
          Ordinary repairs to Pappala- Pangalthadom road from Km 0/700 to 2/000
          13th Fin -Resurfacing on Varkala Parippally road.
          13th Fin -Providing bit CC ti Paripally Madathara road Km 10/800 to 11/270.
          13th Fin.(224) Providing Bit CC and Allied works to M C road Km. 12/200 to 14/00.
          Ordinary repairs to Parippally- Madathara road from Km 1/600 to 3/000
          Urgent patch repairs to Kallara - Adappupara road km 1/000 to 2/000
          Urgent patch work to Pappanamcode Kottoor road Km 0/000 to 3/200.
          Urgent patch repairs to Kallara - Adappupara road km 4/000 to 5/000
          Ordinary repairs to Venjaramood- Attingal road from Km 5/000 to 6/000
          Urgent patch repairs to ThannimmThannimmode Perayam Chellanchi KM 5/400 to 6 500
          Urgent patch repairs to Kallara - Adappupara road km 2/00 to 3/000
          Urgent patch repairs to Kallara - Adappupara road km 3/00 to 4/000
          Ordinary repairs to Kollampuzha Bridge approach road from Ch 0/000 to 1/500
          Ordinary repairs to Kilimanoor- Alamcode road from Km 1/900 to 4/000
          Ordinary repairs to Kilimanoor- Alamcode road from Km 5/600 to 7/000
          Urgent patch repairs to Panavoor Attinpuram perayam road 1/500 to 2/900
          Ordinary repairs to Kilimanoor- Alamcode road from Km 0/000 to 1/500
          Ordinary repairs to Alamcode- Meerankadavu road from Km 0/000 to 7/000
          Ordinary repairs to Navaikulam- Thumbode road from Km 4/600 to 6/100
          Ordinary repairs to Chadayamangalam- Pallickal road from Km 6/400 to 7/600
          Ordinary repairs to Chadayamangalam- Pallickal road from Km 7/600 to 8/700
          Ordinary repairs to Nagaroor- Kallambalam road from Km 4/000 to 6/700
          Ordinary repairs to Navaikulam- Thumbode road from Km 3/000 to 4/500
          Ordinary repairs to Parippally- Madathara road from Km 3/000 to 5/000
          Urgent patch repairs to Pangode Kizhakkumbhagam road 0/000 to 1/600
          MLA SDF for 2011-12 in Nemom Constituency Metalling and tarring in Pulimoodu By road and construction of Island at Perunelly Jn connected with Karalkada - Subhash Nagar Enchackkal Poonthura road in
          T-309 Improvements to Peyadu Vellanadu road km 9/600 to 10/200
          Ordinary repairs to Nagaroor- Karatte road from Km 4/500 to 5/500
          Ordinary repairs to Kilimanoor- Alamcode road from Km 4/100 to 5/500
          Ordinary repairs to Kilimanoor- Alamcode road from Km 9/000 to 10/800
          Ordinary repairs to Pallickal- Moothala- Edavelikkal road from Km 0/000 to 3/000
          Clearing chocked up culverts and clearing side drain and providing r c c covering slabKazhanad(Vattappara Nedumangad road) KM 2 000 t0 3 000
          (219)13th Fin - Providing 20mm CC to Paripally Madathara road Km. 9/800 to 10/800.
          13th Fin -Providing bit CC and Allied works in M C road Km 10/00 to 11/800.
          (225)13th Fin. Providing Bit CC and allied works to M C road Km. 4/500 to 17/00.
          Ordinary repairs to Thumbodu- Kaithodu road from Km 0/000 to 2/700
          13th Fin - Providing 40mm CC toArattuvazhi Roas km0/600 to 1/600.
          Ordinary repairs to Kilimanoor- Alamcode road from Km 7/000 to 8/900
          Urgent patch repairs to Konchira Pothencode(Panthalakkode) road KM 1/750 to 3/480
          Ordinary repairs to Pappala- Pangalthadom road from Km 2/050 to 3/000
          13th Fin -Providing bit CC and Construction of CC drain in Varkala Kallambalam road.
          (226)13th Fin - ProvidingBit Chipping Carpet to M C road Ch 17/200 to 21/100.
          13th Fin - Providing 40mm CC toVazhayila Jn. in TS road.
          Ordinary repairs to Chadayamangalam- Pallickal road from Km 8/750 to 9/800
          Deposit work. Rectification of tar cut for TATA cable trench from Punnan road Jacob Junction in Bakery Jn.
          Urgent Bit-Chipping carpet work inThandranpoika Gokulam Medical college Keezhayikkonam road 0/750 to 1/500
          Urgent Bit-chipping carpet works to Thandranpoika Gokulam Medical college Keezhayikkonam road 0/000 to 0/750
          Urgent patch repairs to Konchira Pothencode(Panthalakkode) road KM 0/000 to 1/750
          City improvement works.Construction of drain and paved foot path around Gandhi park at Eastfort
          Reconstruction of island at Womens college Jn Vazhuthacadu road
          Special repairs Urgent special repairs to the steel foot bridge at Vaduvathu (Marappalam 0 Across T.S canal in Nemom assembly constituency
          Urgent patch repairs to Vembayam Thalayil Thembamoodu road from KM 0/000 to 1/800
          Painting and repairs of Bridge at Koovakkudy in Vellanad Road at Km 3/800
          Painting Culverts and Guard stone in Aryanad-Palode Road KM 8.900 to 10.200
          Clearing chocked up side drain, repairing and replacing damaged covering slabs etc. atNedumangad Market Junction
          Urgent Patch repairs to Pattakulam Pezhumoode road Km 0/00 to 0/000 to 2/000
          Urgent patch repairs to Muthuvila Aruvippuram Chullalam road 0/000 to 2/000
          Urgent Patch Repairs to Aryanad Pezhumoode road from KM 0/000 to 3/000
          Urgent patch repairs to Pattakulam Pezhumoode road Km 2/000 to 5/200
          Urgent patch repairs to Vembayam Thalayil Thembamoodu road from KM 1/800 to 3/600
          Urgent patch repairs to Muthuvila Aruvippuram Chullalam road 3/800 to 5/800
          Urgent Patch repairs to Vembayam Thalayil Thembamoodu road from KM 3/600 to 5/200
          VETTUKADU CHURCH FESTIVAL 2011-URGENT PAATCH REPAIRS FOR THE CELEBRATIONS OF VETTUKADU CHURCH IN SANGHUMUGHAM VELI ROAD KM. 0/000 to 3/400. (WORKS COMPLETE BEFORE 2011 NOVEMBER 8 )
          Urgent patch repairs to Varkala - Parippally road from Km 0/000 to 4/000
          Urgent patch repairs to New MLA road from Km 1/800 to 3/600
          Painting and repairs of Bridge at Aryanad inNedumangad Shorlacode Highway road at km 11.000
          Painting Culverts and guard stone in Nedumangad Shorlacode Highway at KM 0.00 to 19.700
          Elemination of water stagination , Providing Filter Media in Vellanad Road Km 7/300 to 8/500
          Providing KM Stone in variuos roads under aryanad section
          Construction of retaining wall in Ambalathinkala Thoongapara road 0/200 ( Re tendering )
          URGENT PATCH REPAIRS TO TILAK NAGAR M.C. ROAD -KATTACHAKONAM
          Impts to Peyadu Vellanadu road km8/900 to 9/600.
          Widening of culvert inThiruvanathapuram Shencotta Road at Km 19/800
          T-311 JNNURM D/W Rectification of tar cut due to laying D1 Kg pipe line KWA(JNNURM) FROM tRIKKANNPURAM TO tAGORE jN CH 3/446 TO 2/496(950M)
          T-312 JNNURM D/W Rectification of tar cut due to laying Dl kg pipe line (JNNURM) from Tagore Jn to Kunnupuzha ch 1/2496 to 1/546
          Urgent patch repairs to New MLA road from Km 0/000 to 1/800
          Repairing of retaining wall in Nedumangad Karipoor Road km 1/700 to 1/900
          T 313 JNNURM-D/W REctification of tarcut due to laying Dl kg pipe line by kWA for Kunnupuzha Jn to Plavila ch 1/564 to 0/896.
          Fd- construction of side drain and repairs to the existing side drain in front of D.S.P. Office near P.M.G. Jn. In P.M.G.-Law College road1
          OR 2011-12 Providing 20mm chipping catpet from km 8/00 to 10/00 in Nagaroor Kallambalam road
          VETTUKADU CHURCH FESTIVAL 2011-URGENT RESURFACING WORK AND PATCH REPAIRS IN FROND OF VETTUKADU CHURCH, COMMUNITY HAL AND BUS BAY (WORKS COMPLETE BEFORE 2011 NOVEMBER 8 )
          Urgent Patch Work to Kundamonkadavu Bridge and allied works
          D/W-PROVIDING 20MM BIT CHIPPING CARPET TO POTHUJANAM ROAD KM.0/000 TO 2/000
          Construction of DR & RR masonry retaining wall at Plavoor Keezhavoor road km.3/600
          REconstruction of damaged culvert in Vithura Bonacadu road at km 7/400.
          OR 2011-12 Providing 20mm CC to Vembayam Pallippuram road km 10/100 to 10/800.
          Repairing of side drain and replacing damaged covering slab in Nedumangad Shorlacode Highway KM 10/00 to 11/000
          OR Providing 20mm bit CC to Ambalam Vengode road km 3/600 to 3/960
          Urgent patch work repairs to Muthuvila Aruvippuram Chullalam road from KM 2/000 to 3/800
          T No 154 VVIP Visit - Visit of Her Execellency the president of India at Tvpm on 29/8/2011 -Urgent patch works from Vazhuthacaud - S.K.Hospital - Pangodu road. Ch 0/000 to 1/500.
          T No.155 VVIP Visit- Visit of Her Excellency The president of India at Tvpm on 29/8/2011 - Maintenance of foot path, Kerbs and Painting works to Vellayambalam - Thycaud road Ch.0/000 to 3/700.
          Improvements to Trikannappuram Poozhikkunu road ch 0/00 to 0/500
          SR 2011-12 Construction of CC drain between km. 7/00 to 8/00 of Parippally Madathara road
          13th Fin M& R MDR 2011-12 -Providing 20mm CC to Kallara Muthuvila road km 5/600 to 7/200 1/720.
          URGENT PATCH REPAIRS TO NALANCHIRA PAZHAYA ROAD
          REconstruction of damaged culvert in Vithura Bonacadu road at km 14/500
          OR 2011-12 Providing 20mm bit CC to Ambalam Paichira road km 0/00 to 1/800
          OR Providing 20mm bit chipping carpet to Kariyavattom Chenkottukomam road.
          SR 2011-12 Construction of CC drain bet km 7/500 to 8/200 of Nagaroor Kallambalam road.
          T No 152 VVIP Visit - Visit of Her Execellency the president of India at Tvpm on 29/8/2011 -Urgent patch works to Thycaud Fly over to Vazhuthacaud road. Ch 1/500 to 3/700.
          T No.156 VVIP Visit- Visit of Her Excellency The president of India at Tvpm on 29/8/2011 -Providing temporary barricades at presure points of VVIP route along various roads.
          T no 151 VVIP Visit - Visit of Her Execellency the president of India at Tvpm on 29/8/2011 -Urgent patch works to GK Jn. - Valiyathura- Air port road. Ch 2/200 to 2/500.
          T No 153 VVIP Visit - Visit of Her Execellency the president of India at Tvpm on 29/8/2011 -Urgent patch works from Vazhuthacaud to Vellayambalam and Manaveeyam road. Ch 0/000 to 1/500.
          F/D 2011-12 Const. of Culvert and drain in Vanchiyoor Jn. Km.8/00 in Kilimanoor Alamcode road.
          Urgent Patch repairs toVellanad Road Km 6/500 to 7/500
          Urgent Patch repairs to Parantode Meenankal Road Km 0/00 to 2/200
          13th Fin -Providing 20mm CC to Kulathara Kalady south ch 1/220 to 1/720.
          13th Fin -Providing 25mm BC to T-S road from km 19/600 to 21/00.
          !3 th FC2011-12. M & R SH . REsurfacing by providing 25 mm BC To TS road from KM 18/200 To 19/600.
          13 th FC M& R SH Resurfacing by providing 25mm bituminous concrete to T S road from 17/00 to 18/200.
          O.R 2011-12 Providing 20mm bit CC to Veli Kadinamkulam road km 1/600 to 2/300.
          T No.162 Raising of road at Sanghumugam beach near Indian Coffee House by providing BUSG for vvoiding flooding and construction of side drain
          T No 170 Rectification of side drain and providing New covering slab to Model School - DPI road.
          T No 44 Rectification of the road surface from Ch. 1307m to 1407m of Vallakkadavu - Chakkai road below The approch fly over to Air port. Plamoodu -Marappalam road.
          T No.159 Raising the road surface with 20mm Chipping Carpet and rectification of side drain for avoiding flood at Model School Junction.
          T No 136 Urgent patch works to S.S.Kovil road (Fire force office to Sreekumar theatre road) Ch. 0/000 to 1/100
          13th Fin - Providing BM&BC to Jn. at Edapazhinji at Ch:1/055 to 1/395.
          V. V.I.P. VISIT- VISIT OF HER EXCELLENCY THE PRESIDENT OF INDIA TO KERALA ON 28/8/2011-URGENT PATCH WORK TO NALUMUKKU MEDICAL COLLEGE ROAD CH. 2/500 AND AROUND
          T No 140 Urgent patch workrs to the Chalai bye pass road Ch. 0/000 to 1/100
          T No 141 Urgent patch repairs to Ambalamukku - Oolampara road at Ch. 0/000 to 0/600
          T No 149 D/W. Rectification of tar cut due to providing water supply house connection by KWA in various roads under CRS Sn No.2,Tvpm for the period from 1/5/11 to 31/7/11
          T No 150 D/W. Rectification of tar cut due to providing water supply house connection by KWA in various roads under CRS Sn No.3,Tvpm for the period from 1/5/11 to 31/7/11
          13th Fin - Providing BM&BC to DPI Jagathy road at Ch: 1/160 to 1/710.
          T No.114 Construction of culvert and side drain at Kundamonkadavu Jn.in Kundamonkadavu - Vattiyoorkavu road.Ch.2/200
          T No 145 D/W. Rectification of tar cut due to providing water supply house connection by KWA in various roads under CRS Sn No.1,Tvpm for the period from 1/2/11 to 30/4/11
          T No 146 D/W. Rectification of tar cut due to providing water supply house connection by KWA in various roads under CRS Sn No.2,Tvpm for the period from 1/2/11 to 30/4/11
          T No 148 D/W. Rectification of tar cut due to providing water supply house connection by KWA in various roads under CRS Sn No.1,Tvpm for the period from 1/5/11 to 31/7/11
          T No 157 Urgent patch works to Oolampara - Sasthamangalam road